Loading...
HomeMy WebLinkAboutCorrespondence ARC 1/14/2013 • • • OVA * `ARC ITECTURE INC January 14, 2013 City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 RE: Site Plan Review Minor Modification—2770 Gateway Street This letter addresses the Conditions of Approval as stated in the Notice of Decision, dated December 13, 2012—Case No:Typ112-00036 CONDITIONS OF APPROVAL: Condition 1:On the Final Site Plan, provide a sanitary drain in the trash enclosure area on the western side of the proposed building. Response:A floor drain tied to the sanitary line has been added to the project. It is shown on the attached C2 and A000 as well as on sheet P201 in the construction documents. Condition 2:Show the trash enclosure with cover on the Final Site Plan. Response:The covered trash enclosure has been noted on the attached C2 and A000.The details are shown on sheet A002 in the final construction documents. Condition 3:Conform to all applicable MWMC requirements for restaurants. Contact Phil Sprague(541-726-3675)for details. Response:As part of the final construction permit drawings,the mechanical/plumbing engineer has placed a grease interceptor just outside the building and has connected it to the sanitary waste line.A.note indicating this has been added to sheet C2 of the Minor Site Plan Modification drawings. Condition 4: To meet the pretreatment requirements for stormwater quality the applicant shall install drop in catch basin filters suitable for parking lot runoff in the existing catch basins in the parking lot. Response: A note was added to sheets C2 and C3 of the Minor Site Plan Modification drawings and as part of the final construction permit drawings,for the contractor to install Kristar Flow Guard drop in catch basin filters in each of the existing catch basins located within the existing parking lot. Condition 5:Prior to approval of the final site plan, the applicant shall provide an operations and maintenance plan to the City for review to ensure the long-term maintenance and operation of the proposed infiltration planters and drop in catch basin filters. The plan should designate maintenance responsibility for operating and maintaining the system, and should be distributed to all property owners and tenants of the site. Date Received JAN 1:4 2013 Final Submittal • • January 14, 2013 Page 2 of 3 Buffalo Wild Wings Gateway Mall Response:Attached to this resubmittal are the operations and maintenance plans for the storm water infiltration planter and drop in catch basin filters. Condition 6: To ensure a fully functioning water quality system and meet objectives of Springfield's MS4 permit, the Springfield Development Code and the EDSPM, the proposed infiltration planters shall be shall be fully vegetated with all vegetation species established prior to approval of final site inspection. Alternatively, if this condition cannot be met, the applicant shall provide and maintain additional interim erosion control/water quality measures acceptable to the Public Works Department that will suffice until such time as the infiltration planter vegetation becomes fully established. Response:A note was added to sheets C2 and C3 of the Minor Site Plan Modification drawings and as part of the final construction permit drawings,that the storm water infiltration planter must be fully vegetated and established prior to approval of the final inspection. Condition 7:Immediate access to fire department connections shall be maintained at all times and without obstruction by fences, bushes, trees, walls or any other object(2010 SFC 912.3). Working space shall be maintained 3 feet in width on both sides of the FDC, 3 feet in depth in front of the FDC and 78 inches in height(2010 SFC 912.3.2). Response:A note was added to sheets C2 of the Minor Site Plan Modification drawings and as part of the final construction permit drawings,that 36" on both sides and 78" of vertical clearance shall be maintained around the FDC. Condition 8:On the Final Site Plan submittal, provide shrubs to 3 X feet high as vegetative screening along the parking lot on the frontage of Gateway Street to comply with the requirements of the Gateway Refinement Plan. Response:Shrubs have been added along Gateway Street, as shown on the attached sheet L1.0 Condition 9:On the Final Site Plan submittal, revise the Plant Material Schedule to be consistent with the landscape drawing. Response:The Plant Material schedule has been updated, as shown on the attached sheet L1.0 Condition 10:Per the Site Plan Review Submittal Requirements of section 5.17-120 provide a plan showing the permanent irrigation system for the landscape plan. Response: Irrigation plans and notes have been shown on the attached 12.0 Condition 11:Provide detail for the screening method used for the trash enclosure. Response:The covered trash enclosure is surrounded by min 8 foot tall solid wall on the two exposed sides and a painted steel gate on the parking lot side.These are shown on sheet A002 of the construction documents. Condition 12:On the Final Site Plan provide 10 bicycle parking spaces;3 long term and 7 short term in accordance with SDC section 4.6-145 and 4.6-150. Date Received: JAN 1-11 2013 Final Submittal • • • January 14, 2013 Page 3 of 3 Buffalo Wild Wings Gateway Mall Response:We have added 8 short term bike racks and 4 long term bike shelters, as shown on the attached A000. Condition 13:On the Final Site Plan show the preserved or replaced pedestrian sidewalk connection to the public sidewalk on Gateway Street. Response:A pedestrian sidewalk connection to the public sidewalk on Gateway Street has been added as shown on the attached C2, C3 and A000. Condition 14: Provide the number, size and type of trees to be removed on the Final Site Plan submittal. These notations can be added to the Tree Table on page Cl. Response: The trees being removed are noted as such on the Tree Table on attached sheet Cl as well as on sheet C2.02 of the final construction documents. Sincerely, Terry) Novak Novak Architecture, Inc Date Received: JAN 1 4 2013 Final Submittal