Loading...
HomeMy WebLinkAboutApplication APPLICANT 5/14/2013 City of Springfield • • SPRINGFIELD Development Services Department 223JFifth Street s . Springfield, OR 97477 / Minimum Development Standards Land Use Compatibility Inspection Property.Information Address/Map and Tax Lot 240 Main Street, 17033532-5100 Zoning MUC Building Size (square footage) Existing Use Automotive Parts (DAWG Automotive) Proposed Use SUB Expansion Site Visit Conducted Date 4/24/13 Final Site Visit Conducted LUCS Issuance Date 5/6/13 Planner Assigned Liz Miller - 541-726-2301 Contact Jack Foster Phone 541-744-3654 Associated Permits Minimum Development Standards REQUIRED SITE COMPLIES CONDITION OF NOTES CONDITIONS IMPROVEMENTS OCCUPANCY MET (DATE) Street Trees X ❑ -- P -• — noc,4-toluu, 11=11 Stormwater Catch Basins ❑ x AO f A. 1 3 filter s re.. See Attached space(s) X ❑ re.. See attached space(s) Z req.Parkin. Lot Stri•in• ❑ X 0 ADA s.ace s re.. 1 ! v ❑ Screen ❑ Cover ❑ Pave ❑ Isolate Screened Trash Rece.tacle X ❑ ❑ Drain Da le Received: Maintenance of Existing Site Im•rovements X ❑ See attached notes u . i Revised 3/1i/11 ddk 1 of 2 Original Submittal Additional Comments/Applicable Special Use Standards • This use is permitted in the MUC zone as an expansion of the existing SUB use directly north of this site per Jim Donovan, Planning Supervisor. The Downtown Refinement Plan does not have a minimum parking requirement. SUB shall install wheel stops and parking spaces using the parking lot standards in Section 4.6-115 of the Springfield Development Code. ADA space, bicycle parking and trash enclosure are not applicable because of the secondary use of this building and parking area in relationship to the existing SUB use already accommodating theses improvements. Vision Clearance Triangles for the north and south corners of the site at the street intersection and at the alley intersection have been reduced to 10 feet per Michael Liebler, Transportation Engineer, because of one way direction. Statement of Compliance By Signature, I state I have carefully examined this change of use approval and do hereby agree to comply with the requirements of the approval and certify any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, applicable City Standard Specification and Drawings and the laws of the State of Oregon pertaining to the work described herein. The City may inspect the work site described in this approval at any time during a one-year period following the receipt by the City of notice of completion of the described work and specify, at the City's sole discretion, any additional work required to bring the site into compliance with all applicable City standards. In the event conditions are not met prior to occupancy of the building or within thirty days of issuance of the approval, Code Enforcement will be notified of an infraction and a citation may be issued. Name (Please Print) -5-/V/ 3 igna . e: Date • Date Received: MAY 1 4 2013 Original Submittal Revised 3/17/11 ddk 2 of 2 City of Springfield • • SPRINGFIELD Development Services Department 225 Fifth Street Springfield, OR 97477 / PERMIT REVIEW INTAKE FORM (City Staff completes form) Permit Type Dept of Motor Vehicles-New: El Land Use Compatibility Statement: X City: Dept of Motor Vehicles-Renewal: ❑ Zoning Verification Letter: ❑ UGB: ❑ Project Information A• • licant Name: Jack Foster Phone: 541-744-3654 Com •an : SUB Cell: Address: 223 A Street, Suite B, Springfield OR 97477 Pro•ert Owner: Ral.h Smeed Phone: Com •an : 176 W C Street Cell: Address: Springfield, OR 97477 ASSESSOR'S MAP NO: 17033532 TAX LOT NO S : 5100 Pro•ert Address: 240 Main Street, Springfield, OR 97477 Description of Proposal: Change of use from Automotive Parts business to expansion of the existing SUB use to t the north of this property. Record Information Record No: rem f 1173 G Date Received: /4 2c)1 2 A• • lication Fee: $ U I • c5) Technical Fee: $ /� TOTAL FEES: $ G/ , a C Assi• ned Planner: lZ- Date Received: MAY 142013 Original Submittal__- Revised 11.2.11 kl