Loading...
HomeMy WebLinkAboutPermit Building 2013-7-31 • • SPRINGFIELD --- - 225 Fifth St CITY OF SPRINGFIELD • Springfield,OR 97477 t Phone: 541-726-3753 ' OREGON Building / Commercial Permit Inspection Phone: 541-726-3769 Fax: 541-726-3676 PERMIT NO: 811-SPR2013-01300 www.springfield-or.gov permitcenter @spdngfield-or.gov PROJECT STATUS: Issued ISSUED: 07/31/2013 EXPIRES: 01/26/2014 STATUS DATE: 07/31/2013 APPLIED: 06/17/2013 SITE ADDRESS: 831 52ND ST,Springfield,OR 97478 SCOPE: Storage Building ASSESOR'S PARCEL NO: 1702332101219 TYPE OF STRUCTURE: Commercial PROJECT DESCRIPTION: Additional storage building OWNER: 1-105 SECURE STORAGE LLC Phone Number: ADDRESS: 35379 MCKENZIE VIEW DR SPRINGFIELD OR 97478 CONTRACTOR INFORMATION Contractor Type Contractor Name Lic Type Lic No Lic Exp Phone RICHARD A TRICKEY INC CCB 52320 01/07/2014 541-954-2014 INSPECTIONS REQUIRED Inspections 1996 Final Inspection—Planning 1020 Zoning/setbacks 1110 Footing Footing: After trenches are excavated. 1120 Foundation Foundation: After forms are erected but prior to concrete placement. 1150 Slab/Flatwork Slab: To be made after all inslab building service equipment,conduit piping and other equipment items are in place but prior to concrete. 1260 Framing Framing Inspection: Prior to cover and after all rough in inspections have been approved. 1530 Exterior Shearwall 1550 Firewall Firewall: Located and constructed according to plans. 1560 Firestop Assemblies • ATTENTION: 0.eyot law ,etr Ir tt 1999 Final Byipj rules adopted by the 0naPf�� IIg�After all required inspections have been requested and approved and Notification ran l '��S�in9151 complete. ter. Thocc rulc3 ar sett'III 1829 Specidrl6 Mt9t2-001-0010 through OAR 952-001- ••.. NOTICE: 0090. You may obtain copies of the rules by TTuf1 ee FliRnf1nf1 TT ee FF By signature, Irst1lIL0`ah n118Jt I (ft/Y.$galt�fglly46M1inerd4 the completed appliC 11§nP�r1tl'tlBiReT9 ify�IF THE WORK information h &1t thiS iIEC iptancUt �MP9NE?flitidn ny and all work pe nrMQl a a Fria c€aMILIS NOT Ordinances of the CityaBktin;:e1d�f @.3O Athe State or Oregon pertain@§'tgjQp '1• •r tWEIStA@AM @NEDifOR OCCUPANCY will be made of any structure without permission of the Communitypesvierefrpnigrplatfts Safety. I further certify that only contractors and employees who are in compliance with ORS 701.0A willte used ont,is project. I further agree to ensure that all required inspections are requested at the proper time,that each address is readable from the street, that the permit card is located at the front of the property,and the approved set of plans will remain on the site at all times during construction. glot 7 3/-� Owner or Contractor Signature Date • Springfield Building Permit 7/31/2013 9:15:26AM Page 1 of 1 • SPRINGFIELD`— CITY OF SPRINGFIELD 225 Fifth St TRANSACTION RECEIPT Spnngfield,OR 97477 \OREGON 541-726-3753 811-SPR2013-01300 www.springfield-or gov 831 52ND ST permitcenter @spnngfield-or.gov RECEIPT NO: 2013001667 RECORD NO:811-SPR2013-01300 DATE:07/31/2013 br _!ST AMOUNTeDUEa 3oj�,Ya1-71�Ei1[oltt--.,,'!}, „z. �k�L�,,__,µrt.�;����.a"'_ v,_ ACCOUNTiCODE(LRANSCODE<:.�::]� Building Permit Fee 224-00000-425602 1002 849.40 Commercial Fire(.10 Per Sq Foot) 100-00000-424005 9112 1,040.00 SDC:Administrative Fee-MWMC Regional Wastewater SDC 611-00000-426604 1189 10.00 SDC:Compliance Cost-MWMC Regional Wastewater SDC 444-00000426607 1113 160.44 SDC: Improvement-Transportation SDC 447-00000-448027 1174 9,815.24 SOC: Improvement Cost-MWMC Regional Wastewater SDC 445-00000-448025 1187 9,879.54 SDC: Improvement Cost-Storm Drainage 440-00000-448028 1176 10,060.70 SDC: MWMC Credit-Regional Wastewater SDC 445-00000-448025 1054 -631.75 SDC: Reimbursement-Transportation SDC 446-00000-448026 1173 2,693.03 SDC: Reimbursement Cost-MWMC Regional Wastewater SDC 444-00000-448024 1186 767.52 SDC: Reimbursement Cost-Storm Drainage 441-00000-448029 1177 6,906.46 SDC: Total MWMC Administration Fee—Local 719-00000-426604 1121 509.29 SDC:Total Storm Administration Fee 719-00000-426604 1180 848.36 SDC:Total Transportation Administration Fee 719-00000-426604 1190 625.41 State of Oregon Surcharge(12%of applicable fees) 821-00000-215004 1099 101.93 Technology fee(5%of permit total) 100-00000-425605 2099 42.47 TOTAL DUE: 43,678.04 PA.V.MENTNITYP-E'. P,AYOR cASNIER:JLARSON. COMMENTS AMOUNTjBAIp ,t Check 1-105 SECURE STORAGE LLC 43,678.04 2347 TOTAL PAID: 43,678.04 • • • • • SPRINGFIELD CITY OF SPRINGFIELD ki -as_ 225 Fifth St , TRANSACTION RECEIPT Springfield,OR97477 M1'" OREGON 541-726-3753 811-S P R2013-01300 www.springfield-or.gov 831 52ND ST permitcenter©springfield-or.gov RECEIPT NO: 2013001249 RECORD NO:811-SPR2013-01300 DATE:06/17/2013 DESCRIPTION_-,,-,,_`. 2._;,...1:-. , -_ . � . _ 4„ACCOUNTCODE/TRANS'_CODE l, AMOUNT DUE .LI Structural Plan Review Fee Commercial 224-00000-425602 1060 552.11 ' TOTAL DUE: 552.11 ,'PAYMENT TYPE._- ,;_,_.PAYOR__CASHIER:CCARPENTER, ;COMMENTS AMOUNT PAID -j Credit Card Richard Trickey 552.11 317100 TOTAL PAID: 552.11 1 Structural Permit Application niir RTaUSE ON i FIELD r MT CITY OF SPRINGFIELD,OREGON 225 Fifth Sued•Springfield, '£- � ` OREGON Permit no.: _....c.,."7 _ �!'� OR 97477•PH(541)726-3753•FAX(541)726-3689 ,7W Date: Y/f7//3 . This permit is issued under OAR 918-460-0030.Permits expire if work is not started within 180 days of issuance or if work is - - suspended for 180 days. f=L era OVERNMEN APPROVALEZ' # . - - "$ - . �. .,�,�.�� .:�: '' .�.t 7i all'a :FEE CHEDL „arit This project has final land-use approval. 1(��yauaho� f orotmanx g r ,- . rr. Signature: Date: (a)Job description:4DD70. This project has DEQ approval. l 1J y0 jAC/t/T}/ Signature: - Date: Occupancy S�a,Q/9(,� 9 r Zoning approval verified: Yes 40-No Construction type- - Property is within flood plain: ❑Yes , *o - Square feet:•pylon-) Ea", s .. .. .w .- �CATEGQRY�OF ONSTRUCTION+6` �-"_�` Cost per square foot ❑Residential ❑Government ®'Commercial Other information: i'1 J 0B7"S1ITMNF,�ORMATIONgANDlLOCQTION rig Type of Heat: Job site a•°i W S.?NO STreer Energy Path: City 5 iif/NL.F'jata State: ZIP:99q ' ❑new ['alteration addition Subdivision: Lot no.:(9 ai 9 (b)Foundation-only permit? ❑Yes 2-No Reference: Taxlot:/702- 332/ C7 Total valuation: g cid ki.t Na a`,",PROPEIthi QWNER: AESIVI_ a"° rr' iiigl .:..�. ;cam r .#r-, w�, /°�(4� °+- .� r2.Buddmg;fees�,;Z„�i ,sa:ai �.�,,�: .�i,,� i.aa Name: 7 -/05 $eegijtt srserit,E L GC (a)Permit fee(use valuation table): $ ryi z 2) Addrril Sc 1'44. spear (b)Investigative fee(equal to[2a]): $ City:S,,pj ,p/tom. State: otz ZIP:c375 7er (c)Reinspection($ per hour): $ Phone: $0-95'/-.26/ I Fax:SW-S. eg C (number of hours x fee per hour) E-mail: (d)Enter 12%surcharge(.12 x[2a+26+2c]): $ 10/95 (e)Subtotal of fees above(2a through 2d): $ Building Owner or Owner's agent authorizing this application: rialifi ape're ew feas gitinTaWf' `N sd . "r: l ,/ (a)Plan review(65%x permit fee[2a]): $ 5312 t r Sign here: o/l/ (b)Fire and life safety(40%x permit fee[2a]): . $ ❑This installation is being made on residential or farm property owned by (c)Subtotal of fees above(3a and 314: $ me or a member of my immediate family,and is exempt from licensing 4 Mi Cellaneous fees -' h "`' - 'a` w"°2 18.:',ry "'i requirements under ORS 701.010. 7 "" } �''' `z'"" *Frw (a)Seismic fee, 1%(.0l x permit fee[2a]): $ '1:gCONTRACTOR INSTALLATION -'`'- Business name,P,N 1594 A, �/�j/ //v�, (b)Technology fee,5%(.OS x surcharges fee[2a]): $ y `f7 Address: //a& OfrEa/'gj/ 4.0e0 ./7E (CO TOTAL fees and surcharges(2e+3c+4a+4b): $ 7.5- J CityiCQ, ,,44,7 zt State:0,C ZIP:' 1y-77 Phone:S`// 93771 e2e3/'! Fax:s/f/ 9er 09 fir E-mail: CCB license no.: Sa,_,3 go Print name:"7 /R� 4, 75ec C Signature: - .._ y -ate COkliRACTOR=IINF,ORMATIOIJ "g til Name CCB License# Phone Number Electrical NEW-wr/Y $cazm/L Plumbing Mechanical -