Loading...
HomeMy WebLinkAboutComments PWE 1/2/2013 r Memorandum City of Springfield Date: January 2, 2013 To: Liz Miller, Senior Planner From: Clayton McEachern, Civil Engineer Subject: TYP112-00041 Floodplain Overlay-Shave, 38 Kremont Ave The Land Development Division has reviewed the materials provided with the subject application. The comments outlined below are provided for your use in preparing the land-use decision. Comments 1. The new home has 1 additional bedroom and a substantial increase in square footage with no noted modifications to the existing septic system. Approval from the lane county sanitarian is required for public works approval of the building permit. 2. There is no evidence the new construction will comply with FEMA floodplain requirements for residential construction that the home will be a. 1' or more above BFE of 450.6' b. The foundation will be capable of withstanding forces imposed on it from floodwater. This can be accomplished with either fill or structural elements or a combination of the two. Either method requires plans prepared and stamped by licensed engineer that conform to FEMA requirements. 1L-1► � Date Planner: LM LM