Loading...
HomeMy WebLinkAboutPermit Building 1994-7-7 ~J -.' '.l~' CO M M E RCIALI I N D U s1 RIAl:! PERMIT APPLICATION ~ ...., '\_:-,.~"""",,:,:,,"" -~~, /j~JOB NUMBER qA..\[)\~ INSPECTION LINE: 726.3769 OFFICE: 726-3759 ~V6 ft)I4CP{)j/ ') '" ..- TAX LOT: OWNER' ,~ >p ADDRESS: } ~ 79 CITY: h'7Efl€!E G J2' /A ,If 7/1 AMJ Y ~ PHONE: STATE: be.. ZIP: <q?4Q I HANDICAP ACCESS' FLOOD PLAIN: ZONING: LIGHTING POWER BUDGET: WATER HEATER' DESCRIPTION OF WORK: NEW REMODEL hu (/ /'f7/?./d IJ //11/-'7 ADDITION DEMOLISH OTHER y t' NAME ADDRESS ARCHITECT: CONTRACTOR'S NAME GENERAL: ~/J~~A/~ CO NST, CONTRACTOR # EXPIRES ADDRESS SA.<.LD PLUMBING: MECHANICAL: ELECTRICAL: I PLUMBING I MECHANICAL I NO. I I FEE I CHARGE I NO I Single Fixture I Furnace/burner & vent < 100,000 BTUs I Relocated Bldg. I Furnace/ burner & vent (new fix. addtl) >100,000 BTUs I I Iwater Service ft. I Floor furnace and vent ,I ,Isanitary Sewer I Suspended wall or Iloor It. mounted unit heater Storm Sewer I Appliance Vent ft. separate 1 I Stationaryevap, Backflow Device cooler I I Vent Fan/Single duct I I Vent System apart from AC or htg. I I Mechanical exhaust hood and duct I I I I, ' Permit Issuance I TOTAL PERMIT i I TOTAL PERMIT QUAD AREA' # OF BLDGS: - OFFICE USE,- ir .+~:;:. LAND USE: # OF UNITS' OCCY GROUP: CONSTR. TYPE: HEAT SOURCE: # OF STORIES: SQ, FT, $/SQ, FT, VALUE SQ. FTG MAIN SQ, FTG ACCESS SQ, FTG OT,I;JEI3 " X \ " . X x TOTAL VALUE OF PROJECT PLAN CHECK FEE RCPT# DATF BY I BUILDING PERMIT 1,5% State Surcharge MECHANICAL I PLUMBING 150.Yo State Surcharge FENCE VALUE $ SIDEWALK , DEMOLITION I PLAIJ. CHd c:.l. Ftt..L ~ J ~.DOO -I,CE7RAOIAL6 SUBTOTAL ' PERMITS I SYSTEMS DEVELOPMENT I I ~ I FT. 5% State SurcharQe I PAVING FT. CURB CUT TOTAL PERMIT FEES EXCLUDING ELECTRICAL /000 VALUE: N~ PHONE (p PHONE 6::.8"3 - 574/ ~~~ I r.I:\"ARr.F -I I I $10,00 ~rmt CoO - /e')L I I I I I 252 - ""'l.--~~ "- "'lIIl ,;'::4~ 4 , .~.' REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, c;all 726-3769 (recorder), state your'City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a,m, will be made the, same working day, requests made after 7:00 a.m, will be made the following work day, ' SITE INSPECTION: To' be . ROUGH PLUMBING, made after excavation, but ELECTRICAL & prior to setup of forms, ivlECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel is in place'but prior to placing asphalt or concrete, / , FOOTiNGS & F'OUNDATlONS: To be made after trenches are excavated' and forms are erected, all steel in place, but p'riof' toplaci ng concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. ' SPECIAL INSPECTIONS: 'In accordance Section 306 Of the State Specialty Code , a special inspector, shall be employed by the Ownerl Contractor duri[lg construction of the foJlowing work. A copy of the special testing reports shall be furnished to the Building Division.' UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered, ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any , concrete .is 'placed. FRAMING: To be made after - the roof, all framl ng, fi re blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P,S,I. (306 a.1) STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation o'f floor insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board interior wall covering is applied. ' "<I!".,~~ '1="fi:te: & SEPARATION WALL: Located and constructed according to plans. , HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines, To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U,B,C. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a.11 & Chapter 29) , POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. GLU-LAM BEAMS: Inspection Certlfic,ate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B,C. STDS.25.10,11). STRUCTURAL MASONRY: (306 a.7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor ~heathing. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. * in addition to the inspec- tions specified" the Building Officl,al may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to installing any roof covering, CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL PLUMBING FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this inspection, ;.i FINAL BUILDING: Requested after the final plumbing, electrical, FINAL MECHANICAL mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division FINAL FIRE DEPARTMENT and posted on the premises, ADDITIONAL COMMENTS: CavYIPLr..fJ "VI-rl-l e~AVI_.7Z. x... A~(lC.L€:.'S O~ CSt., ~ ~ j::' sP12./Ai,clSLD ~17G: e~A[Tr2.. A. C- IO~ 7C ~ vVt//L~ ,U) , f f.I ./J1/./ TD !1}ID / H 6 ~TZ.j::hOtUS-t(PPL~MEjJ,.T~ / (? ~ . PLANS REVI~WED BY_~__/~_ ~~~ DATE 7-,{,-5'4- By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certify that all Information heretn is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Spring.field, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all ::::,::~'n~ r)~~ Dal. "I -I q'j 7/7!1q 130B Ie, VALIDATION: AMOUNT RECEIVED: d 6;< . () 0 613790/ DATE PAID: RECEIPT #: RECEIVED BY: