Loading...
HomeMy WebLinkAboutCorrespondence PWE 6/26/2013 • • MEMORANDUM City of Springfield DATE: June 27, 2013 TO: Andy Limbird, Urban Planner FROM: Clayton McEachern, Civil Engineer SUBJECT: PRE13-00016 Leavitt Freight Services, 3855 Marcola Road The subject application involves tax lot 17-02-30-00-1910,1915 Applicant's Questions: 1. Site Review. Since an approved site plan for this property was not found, a site plan review-minor concurrent with a final site plan equivalent map application must be completed. Does the current site comply or what further site work must be done for it to comply? To be answered by planning. 2. Site Work. Paving for the truck turn-around is sufficient for daily use today and will not be affected by this project. Paving for vehicle parking is proposed to be altered/adjusted because of the addition. Is additional paving for parking going to be required beyond what is already required in the project scope? Paving for the first 18' is required for all entrances to help keep the streets clear from mud and gravel. A trash enclosure is required to be on a paved/hard surface, as are wash racks and loading docks, if any are required as part of this development. If adequate parking stalls area available for the required number of spaces no additional paving for parking is required. 3. Storm Water. Flow of the existing collection system is to the west edge of the property. Are additional modifications going to be required of this system? No large scale modifications or rerouting of the system will be required for this development. However a vegetation or mechanical treatment of a portion of the stonnwater runoff will be required. How this is implemented will be determined by the current system layout and the lest disruption with maximum treatment that can be obtained. 4. What additional site issues must be addressed for approval—issues that must be resolved for the Site Plan Review? The applicant will need to submit any storm water changes/alterations to DEQ to remain current on their 1200Z permit. Date Received: a 24 aoij Planner AL (4 The proposed building addition will incur Systems Development charges of about 14,000 plus any charges for new plumbing fixtures, which will typically be 850 for a bathroom or break room. Date Received: ZG el4019 Planner: AL