Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-17 (6) j Professional Service Industries,Inc. //J Information 6032 N.Cutter Circle,Suite 480 �-/ Portland,OR 97217 �LJ CCB No.176269 C n� .TO Build On Phone:(503)289-1778 fEngineering • Consulting • Testing Fax:(503)289-1918 Daily Field Report Report No: DFR:0654137-12711 Issue No: 1 W AL-MART STORES, INC. These test results apply one to the specific locations and materials noted and may not Client: CC: represent any other locations or elevations.This report may not be reproduced,except 2001 S E 10TH ST BLAKE JOHNSON,BOB in lull,w,trotn written permission by Professional Service eaustnes. Inc.u a nom MAIL STOP 5570 Compliance appears on this epon.to the extent that the reported no compliance GARRISON,CAITLIN impacts the project the resnmron is outside the PSI scope of engagement. BENTONVILLE,AR 72716-5570 NUGENT, DALE RUSSELL, ERIC EVENSON, KATYRYN JERKOVICH,ROBERT Project: WM 4178-00 SPRINGFIELD OR TO CASTILE,,WILSON HU,YONG SPRINGFIELD, OR HO Approved Signatory: Deborah Priest(Special Protect Manager) Date of Issue: 611812013 Date: 6/17/2013 Technician: Glenn Meek Haps Masonry continuing to construct the 3-, 12" cmu walls at the organic waste grid line A.7 - B at 6 - 6.5 to the 7th course. Placed the horizontal and vertical reinforcing to the 7th course per S4. Also constructed the 3-, 12" cmu walls to the 7th course of teh bale and pallet at grid line A.8 - C.1 at 7.5 - 7.8. Inspected the installaiton of 2 each # 5 x 60 degree vertical reinforcing at the bale and pallet at grid line A.8-C.1 at 7.8 for the expansion joints for the walls. See epoxy report. Inspected the installation of 3/4"x9" all thread bolts at the following locations. 18 each at the ledger grid line Bat 2.6-3.5, 5 each grid line A.7-B at 2.6 and 4 each at the canopy connection grid line A.8 at 2.6, see epoxy report. • Report No.:DFR:0654137-12711 ©2000-2013 OESTLab by SpectraDEST.com Page 1 of 1