Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-12 (4) / TNfOrmtiOn Professional Service Industries,Inc. �q p 1,D 6032 N.Cutter Circle,Suite 480 (�''�//-7 1-7 Portland,OR 97217 l> Lt ``aju ATo Build On Phone:(503)289-1778 �t Engineering • Consulting • Testing Fax:(503)289-1918 Sly-o 7 • Daily Field Report Report No: DFR:0654137-116/1 Issue No: 1 Client: WAL-MART STORES, INC. CC: These lest results apply only to the specific locations and materials noted and may nal represent any omen locations or elevations.This report may not he reproduced.excePl 2001 S E 10TH ST BLAKE JOHNSON, BOB in Wi,without written permission by Professional Service Industries, Inc. II a nom compliance appears on this report,to the extent that the reported no compliance MAIL STOP 5570 GARRISON,CAITLIN impacts the project.the resolution is outside the PSI scope 01 engagement BENTONVILLE, AR 72716-5570 NUGENT,DALE RUSSELL, DAVID NICHOLS: ERIC EVENSON, KATYRYN Project: WM 4178-00 SPRINGFIELD OR TO JERKOVICH, ROBERT 02 , SPRINGFIELD, OR CASTILE,WILSON HU Approved Signatory: Deborah Priest(Special Project Manager) • Date of Issue: 611712013 •Date: 6/12/2013 Technician: Glen Meek Jr. Crestview Construction installed the 3" drain line scuppers per 6/C9.0 at the sidewalk at the center of the parking area. Crestview Construction installed the 8" storm drain from the existing storm drain manhole at 27' east of and 45' south • of the northeast corner of the building (grid line G at 6) to 10' east of the cart storage (grid line G.8 at 1) for roof drains. The 8" line is bedded on wildish 3/1-0 aggregate. Crestview Construction installed the slotted drain at the bale and pallet storage area and Dynasty started placing the footing slab on grade reinforcing as well as forming for the placement of concrete. Report No.:DFR:0654 137-116/1 ©2000-2013 OESTLab by SpeclraOEST.com Page 1 of 1