Steel Observation Report •Report No: SIF:0 6 541 3 7-1 0 911
Issue No: 1
Client: WAL-MART STORES, INC. CC: not These test resalts apply only to the speorc location and matenals noted are may
represent any other locations or elevato y ns.This report ma not be reproduced.
2001 S E 10TH ST BLAKE JOHNSON, BOB except in tall,waoom written permission by Pmmessonal Service Industries.Inc.It
non-compliance appears on cos report, to the extent that the reported ex
MAIL STOP 5570 GARRISON,CAITLIN NUGENT, compliance ;meaos the inject the resolution is outside the PSI scope el
DALE RUSSELL, ERIC EVENSON, engagement
BENTONVILLE, AR 72716-5570 e
KATYRYN JERKOVICH, ROBERT r2--Lt CASTILE,WILSON HU, YONG HO
Project: WM 4178-00 SPRINGFIELD OR TO
SPRINGFIELD, OR Approved Signatory: Deborah Priest(Special Project Manager)
Dale of Issue: b/18/2U13
General Details
Date: 6/11/2013 Technician: Glenn Meek
General Contractor: SD Deacon Subcontractor: Dynasty
Weather: Overcast
Location(s)/Item(s): NA .
Type(s) of Observation Performed & General Checklist
p Special Inspection ❑AWSOCl/ASNT VT ❑At Corrpletion El In Progress ❑ Post-Corrpletion*
Fl New Inspection ❑Re-Inspection p Continuous ❑ Periodic ❑Other
Structural Welding Structural Bolting Steel Erection Post-Installed Anchors Open Web Steel Joist Inspection
El Shop ❑ Field ❑Pretension ❑Shear Brg ❑ Shop ❑ Field 0 Chemical ❑ Mechanical ❑ Shop ❑ Field
Weld Process Bolls Specified - Joint Details ICBO Report No: x Joist Girder Seat Connections
Electrode Turn-of-Nut Erection Dwgs Anchor Type x Joist Seat Connections
Weld Profiles(s) Cal.Wrench Inspection Rpts Adhesive Type x Horiz.Bridging Connections
Welder Cert(s) Tension Control Mark No.s Hole Diameter x X-Bridging Connections
Weld Prcdr(s) Snug Tight • Anchor Bolts Embed Depth x Wind Brace Connections
Mill Cert(s) Hardened Washers Columns Manuf.Instruct's x Bottom Girder Braces
Prep&Fit-Up Tighten Sequence Beams Clean&Dry x RTU Joist Reinforcement
Preheat Temp Faying Surfaces Metal Deck/Studs Adequate Adhes. x
El UT ❑ MT❑ RT ❑PT Skidmore Tests X-Bracing Torqued/Tight
Box Definitions:X=Attached;IC=1n Compliance:NA=Not Applicable;NC=Nonconformance(see below). 'Describe Limitations Below or Contact Bldg Dept.
Detailed Observations, Materials, Workmanship & Procedure Descriptions
Referenced Details/Drawings: Drawing 8/S2, 17/SP2
Non-Conformance#:
Parties Notified: ❑General Contractor ❑Subcontractor ❑Architect ❑ Engineer ❑Owner ❑ Other:
To the hest of my knowledge,the work inspected above was in accordance with the building de artment approved design drawings,specifications and applicable workmanship
provisions of the International Building Code: ❑Except As Noted ❑ Not Applicable unapproved Drawings/Plans/Materials ❑NCR Issued
❑Non-Compliance❑Requires Engineers Acceptance(RFI) ❑Reinspection Required
Standby Time: .
Inspector: Glenn Meek ID Number:
Remarks
Inspected the installation of 45 each #4x12"vertical dowels at the truck ramp curb at grid line A.4 at 2.65 to 4.8. Verified holes to be
5/8"x4" in size and was brushed and blown free of loose debris. Hilti Hit Hy 150 max 500 ESR 1967/2262 expiration date of 10/2013 was
epoxy used.