Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-13 E, Page 1 of 1 IfShnical NSPfCienSeric technical&Construction servioes Daily Field Report G.E571 mlBC°ns ETI Services Client: Ms. Loretta Davies Project: Jerry's—Springfield Date: 06-13-13 Jerry's Home Improvement Center 2525 Olympic Blvd. Project No.: 2137111 PO Box 2611 Springfield, Oregon Report No.: E-34132 Eugene, Oregon 97402 Inspector: M. Meyer ID No.: 0877905-84 Inspection of: Masonry/Epoxy Dowels Weather: Showers Continuous Inspection: ❑ Contractor: Chambers Construction BP No.: COM2009-00184 Periodic Inspection: Performed inspection on the 8" CMU wall infills on line 2, from line D to F (existing block to 5'4"). Rebar was checked for size, grade, lap, quantity, spacing and • clearance, where applicable. Reinforced cells appear relatively clean and free of excessive mortar projection. Observed placement of 3.5 yards of Knife River 7sk grout (mix 247KG3R200). Grout was placed by pump and was mechanically consolidated. Grout slump — 8"+; air temperature—54°; grout temperature—68°. Walls were grouted solid. Also, witnessed the installation of epoxy anchored (Simpson Set XP-ICC ESR 2508/expiration date: 12/2014) horizontal #5 x 14" rebar dowels into existing concrete for CMU bond beam connections at 7'4" and 9'4" above top of existing block wall. Prior to installation, verified hole cleanliness and minimum embedment depth of 6". Gabe Morse (Haps Masonry) was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with plans dated 01-30-09 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: Michael L. Me er Technical Manager c: Robertson Sherwood Architects — Lana Sadler(email) Endex Engineering—David Morris (email) Chambers Construction Co. —David Bakke(email) City of Springfield MLM:sn • This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing 8 Inspection, Inc.'s written authorization. 750 NW Card Avenue Carvallis,Oregon 97330.phone(541)757-0698•fax(541)757-2991 29540 B Airport Road•Eugene,Oregon 97402•phone(541)684-3849•fax(541)6843851 62979 NE Plateau Drive,Suite 3•Bend,Oregon 97701 •phone(541)382-4844 fax(541)382-4846