Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-3 (2) igw , Page 1 of 1 GTfShnicol NSPfC7/ON,tic Geotechnical&Construction Services Daily Field Report Client: Ms. Connie Speck Project: Giustina Resources Office Bldg. Date: 06-03-13 Giustina Resources 200 International Way Project No.: 2137002 PO Box 529 Springfield, Oregon Report No.: E-34019 Eugene, Oregon 97440 Inspector: D. Delatte ID No.: 1080867-88 ICC Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: ❑ Contractor: Chambers Construction Co. BP No.: 811-SPR2012-02519 Periodic Inspection: L71 Performed inspection on the reinforcing steel for concrete pedestal— lines 7C.2 & 7D.3. Reinforcing steel was checked for grade, size, lap, placement, quantities and clearance. Reinforcing steel was secured. Observed the placement of 2.0 yard of Eugene Sand and Gravel 5000 psi (3000 psi required) concrete (mix 315065). Concrete was placed directly from truck and was mechanically consolidated. To the best of our knowledge, the work inspected was in accordance with plans dated 12-19-12 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: trid Michael L. Meyer Technical Manager c: Chambers Construction Co.— Brian Erickson (email) Chambers Construction Co.—Jack Makarchek(email) Robertson Sherwood Architects —Scott Stolarczyk(email) City of Springfield MLM:sc • This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing&Inspection,Inc.'s written authorization. 750 NM'Cornell Avenue Corvallis,Oregon 97330'phone(541)757-4698'fax(541)757-2991 29540 B Airport Road Eugene,Oregon 97402 phone(541)684-3849 fax(541)684-3851 62979 NE Plateau Drive,Suite 3 Bend,Oregon 97701 phone(541)382-4844•fax(541)382-4846