Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-29 FEI Page 1 of 1 IfSI/NGg/HSVEC Geotechnicol Construction Services Geotechnical&Construction Seniices Daily Field Report Client: Ms. Connie Speck Project: Giustina Resources Office Bldg. Date: 05-29-13 Giustina Resources 200 International Way Project No.: 2137002 PO Box 529 Springfield, Oregon Report No.: E-33983 Eugene, Oregon 97440 Inspector: D. Delatte ID No.: -- Inspection of: Nailing Weather: Overcast Continuous Inspection: ❑ Contractor: Chambers Construction Co. BP No.: 811-SPR2012-02519 Periodic Inspection: E1 Performed nailing inspection on 5/8" CDX STR 1 rated plywood connection at lower roof, line B.2, from 1 to 3 and line C, from 1 to 2. The plywood was secured with #10d nails to roof truss. Verified nail spacing per prints. To the best of our knowledge, the work inspected was in accordance with plans dated 12-19-12 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: /h./:, Michael L. yer Technical Manager c: Chambers Construction Co.— Brian Erickson (email) Chambers Construction Co. —Jack Makarchek (email) Robertson Sherwood Architects —Scott Stolarczyk (email) City of Springfield MLM:sc • This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing&Inspection,Inc.'s written authorization. 750 NW Cornell Avenue•Corvallis,Oregon 97330.phone(541)757-4698•fax(541)7572991 29540 B Areal Road•Eugene,Oregon 97402•phone(541)684-3849•fax(541)6843851 62979 NE Plateau Drive,Suite 3•Bend,Oregon 97701 •phone(541)382-4844•fax(541)382-4846