Client: Ms. Laura Farthing Project: Hayden Bridge Water Date: 05-13-13
EWEB Intake Improvements Project No.: 2127278
PO Box 10148 Springfield, Oregon Report No.: E-33859
Eugene, Oregon 97440 Inspector: M. Meyer
97440 7/7 ���� ���54DNo.: 0877905-88
ICC
Inspection of: Epoxy Anchors Weather: Partly Cloudy Continuous Inspection: ❑
Contractor: John Hyland Construction BP No.: -- Periodic Inspection:
Performed continuous inspection during the installation of fifty-two (52) 3/4" x 24"
vertical and horizontal all-thread rods into the existing east wall of Intake Building 1 at
three (3) infill locations. Prior to installation, the predrilled holes were cleaned with a
brush and compressed air. Verified minimum embedment depth of 6". Rods were
secured with Hilti Hit RE 500SD epoxy(ICC— ESR 2322/expiration date 01/2014).
Dave Shaw(JHC)was asked to notify our office when additional services are needed.
To the best of our knowledge, the work inspected was in accordance with addendum 2
drawings dated 05-10-12 and applicable workmanship provisions of the I.B.C., except if
noted above.
Reviewed By:
Michael L. Meyer
Technical Manager
c:
John Hyland Construction—Dave Shaw(email)
OBEC—Pete Slocum (email)
City of Springfield
MLM:sc
•
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEE Testing&Inspection,Inc.'s written authorization.
750 NW Cornell Avenue•Cavalts,Q2gen 97330 phone(541)757-4698•fax(541)757-2991
29540 B Airport Road•Eugene,Oregon 97402•phone(541)684-3849•fax(541)684-3851
62979 NE Plateau Drive,Suite 3•Bend,Oregon 97701 •phone(541)382-4844•fax(541)382-4846