HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-24 (9) Information �' To Build On Engineering• Consulting• Testing (2-^.1370 DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING • Date: 5/24/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area: B to C.4 from 1 to 3.9 Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-66-09 Contractor: Central Oregon Roofing PSI Hours Worked: 10.0 Approximate Contractor Hours Worked: 10.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE • Today's Performance Comment Construction today? ® Yes ❑ No If No Construction, Inspection Done? ❑Yes ❑ No Contractor performance issues? [' Yes ® No Schedule/scope issues? ❑ Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 32,395 5,300 37,695 39,049 96.5 37,695 39,049 96.5 Crew Size—4 Roofers—4 Sheet Metal Workers—0 • Page 1 of 4 PSI Project No: 654137 Date: 5-24-13 WEATHER CONDITIONS & EMERGENCY COVER ® Dry ❑ Sunny ® Cloudy ❑ Windy ❑ Rain ❑ Snow Temp Range (low-high) 46°to 60° F Emergency cover/protection on-site? ZYes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? ®Yes❑ No Off ground or deck? ® Yes ❑ No Covered and vented? ®Yes❑ No Roll goods stored on side? 0 Yes 0 No Adhesive storage temperature Unapproved damaged, or wet maintained? ❑ Yes ® No material? If Yes, how disposed? ❑ Yes ® No Comments: Stored material protection appears adequate. SUBSTRATE PREPARATION Night tie-in removed? ® Yes❑ No Substrate clean and debris ®Yes ❑ No removed? Substrate and penetrations ready? ® Yes❑ No Substrate tested for dryness? Z Yes ❑ No Comments: Substrates that received new roofing components appeared clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates? (12 in corners, 9 at perimeter, ® Yes ❑ No perimeters and corners? ® Yes ❑ No 6 in the field) Fasteners checked by technician? ®Yes❑ No Short insulation joints ® Yes ❑ No staggered? New/Existing Insulation joints tight? ®Yes❑ No All joints staggered between ® Yes ❑ No layers? Gaps filled with spray foam? ® Yes❑ No Drainage crickets installed per ® Yes ❑ No plans and specifications? Comments: The isocyanurate was fastened per the roofing manufacturer's specified fastener frequency. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ® Yes ❑ No Membrane fully welded to Rhino ❑ Yes No attachment? Plates? Membrane/plate welds checked by technician? 0 Yes ❑ No Membrane properly lapped? ® Yes ❑ No Seams clean prior to welding? 0 Yes ❑ No Continuous weld achieved? 0 Yes ❑ No Page2of4 PSI Project No:654137 Date: 5-24-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ® Yes ❑ No Seams probed by technician ®Yes ❑ No • Cut edge sealant installed? ❑Yes ® No T-patches installed? ❑ Yes ® No Primary field membrane termination ❑ Yes® No • (T-bar) installed? Comments: Not all induction welds were completed today (work in progress). BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) • Substrate clean and prepared? CI Yes❑ No Adhesive applied to substrate ❑ Yes ❑ No and allowed to dry? Adhesive applied to back of base • ❑ Yes ❑ No Adhesive allowed to flash off? ❑ Yes ❑ No flashing? Flashing pressed onto substrate to El Yes ❑ No Flashing properly lapped onto ❑ Yes ❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑Yes❑ No Membrane flow at welds? ❑ Yes ❑ No Continuous weld achieved? ❑ Yes ❑ No Manufacturer's approved corner ❑ Yes ❑ No patches installed? Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No Termination bars installed? ❑Yes ❑ No Counterflashings installed? ❑ Yes ❑ No Comments: None installed today. NIGHT TIE-IN / DAMAGE/ SITE CLEANUP INSPECTION • Night seal installed? ®Yes❑ No Roofing appears watertight? ® Yes ❑ No Roof drain fleshings completed? ❑Yes® No Damage to property? ❑ Yes 0 No Damage to client's equipment? El Yes 0 No Site broom clean? ❑Yes ® No All debris removed from roof? ❑Yes ® No Roof materials and equipment ® Yes ❑ No appear secured? Comments: Areas of new TPO roofing appear to be watertight. The roof needs to be cleaned off. Page 3 of 4 • PSI Project No; 654137 Date: 5-24-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail# Detail Name Construction Summary (Quantity/Description/Comment) SUMMARY OF TODAY'S WORK/ DEVIATIONS /SPECIAL NOTES: Summary Comments: Work completed today appeared to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s):0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. • PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO Page 4 of 4