HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-22 (11) p Information 0:9.°71 To Build On "-370 Engineering•Consulting • Testing DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING • Date: 5/22/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area: Various Areas Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-64-07 Contractor Central Oregon Roofing PSI Hours Worked: 11.0 Approximate Contractor Hours Worked: 11.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? ® Yes ❑ No If No Construction, Inspection Done? ❑ Yes ❑ No Contractor performance issues? ❑ Yes ® No Schedule/scope issues? ❑ Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 27,360 0 27,360 39,049 70 27,360 39,049 70 Crew Size—6 Roofers—6 Sheet Metal Workers—0 • Page 1 of 4 PSI Project No: 654137 Date: 5-22-13 WEATHER CONDITIONS & EMERGENCY COVER ❑ Dry ❑ Sunny ® Cloudy ❑ Windy ® Rain ❑ Snow Temp Range (low-high) 41°to 55° F Emergency cover/protection on-site? ®Yes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? ® Yes ❑ No Off ground or deck? ® Yes ❑ No Covered and vented? ® Yes ❑ No Roll goods stored on side? ® Yes ❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? El Yes ® No material? If Yes, how disposed? El Yes ® No Comments: Insulation stored on the ground is in original manufacturers wrappers and covered with visqueen. SUBSTRATE PREPARATION Night tie-in removed? ❑ Yes ® No Substrate clean and debris ®Yes ❑ No removed? Substrate and penetrations ready? ® Yes ❑ No Substrate tested for dryness? ® Yes ❑ No Comments: Substrates that received new roofing components appeared clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates? (12 in corners, 9 at perimeter, ❑ Yes ❑ No perimeters and corners? ❑ Yes ❑ No 6 in the field) Fasteners checked by technician? ❑ Yes ❑ No Short insulation joints ❑Yes ❑ No • staggered? New/Existing Insulation joints tight? ❑Yes El No All joints staggered between ❑ Yes ❑ No layers? Gaps filled with spray foam? ❑Yes ❑ No Drainage crickets installed per ❑ Yes ❑ No plans and specifications? Comments: None installed today. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ❑ Yes ED No Membrane fully welded to Rhino ❑ Yes ❑ No attachment? Plates? Membrane/plate welds checked by technician? El Yes ❑ No Membrane properly lapped? ❑ Yes ❑ No Seams clean prior to welding? ❑Yes❑ No Continuous weld achieved? ❑Yes ❑ No Page 2 of 4 PSI Project No:654137 Date: 5-22-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑Yes ❑ No Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No T-patches installed? ❑ Yes ❑ No Primary field membrane termination ❑ Yes❑ No (T-bar) installed? • Comments: None installed today. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ❑ Yes ❑ No Adhesive applied to substrate ❑ Yes ❑ No and allowed to dry? Adhesive applied to back of base ❑Yes❑ No Adhesive allowed to flash off? El Yes El No flashing? Flashing pressed onto substrate to ❑Yes ❑ No Flashing properly lapped onto ❑ Yes ❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑ Yes ❑ No Membrane flow at welds? ❑ Yes ❑ No Continuous weld achieved? ❑Yes ❑ No Manufacturer's approved corner ❑ Yes ❑ No patches installed? Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No Termination bars installed? ❑Yes ❑ No Counterflashings installed? ❑Yes ❑ No Comments: None installed today. NIGHT TIE-IN / DAMAGE / SITE CLEANUP INSPECTION Night seal installed? N Yes❑ No Roofing appears watertight? N Yes ❑ No Roof drain fleshings completed? ❑Yes N No Damage to property? ❑ Yes N No Damage to client's equipment? ❑ Yes Z No Site broom clean? ❑ Yes N No All debris removed from roof? CI Yes N No Roof materials and equipment N Yes ❑ No appear secured? Comments: RTU curbs are covered with visqueen. • Page 3 of 4 PSI Project No: 654137 Date: 5-22-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail # Detail Name Construction Summary(Quantity/Description/Comment) 2-A4.1 Flashing Membrane Secondary field membrane termination (T-bar) was installed per Detail Drawing. 10-A4.1 Pad Layout Walkway pads were installed around various unit curbs per Detail Drawing. SUMMARY OF TODAY'S WORK/ DEVIATIONS/SPECIAL NOTES: Summary Comments: Work was limited to walkway pad installation and termination bar installation because of intermittent rain showers. Unresolved EVOCO Deviation Number(s):0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. • PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO • Page 4 of 4