HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-21 (5) a Information lei .ToBuild On j S l�-2 w 7 p Engineering• Consulting• Testing - DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 5/21/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area: Various Areas Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-63-06 Contractor: Central Oregon Roofing PSI Hours Worked: 11.0 Approximate Contractor Hours Worked: 11.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO • PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? ® Yes ❑ No If No Construction, Inspection Done? ❑ Yes ❑ No Contractor performance issues? ❑ Yes N No Schedule/scope issues? ❑ Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 27,360 0 27,360 39,049 70 27,360 39,049 70 Crew Size—6 Roofers—6 Sheet Metal Workers—0 Page 1 of 4 PSI Project No:654137 i Date: 5-21-13 WEATHER CONDITIONS & EMERGENCY COVER ❑ Dry ❑ Sunny ® Cloudy ❑ Windy ® Rain ❑ Snow Temp Range (low-high) 43° to 53° F Emergency cover/protection on-site? ZYes ['No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? ®Yes ❑ No Off ground or deck? ® Yes❑ No Covered and vented? Z Yes ❑ No Roll goods stored on side? ®Yes ❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? Yes ® No material? If Yes, how disposed? Yes No Comments: Insulation stored on the ground is in original manufacturers wrappers and covered with visqueen. SUBSTRATE PREPARATION Night tie-in removed? ❑ Yes Z No Substrate clean and debris ® Yes ❑ No removed? Substrate and penetrations ready? ® Yes ❑ No Substrate tested for dryness? ® Yes ❑ No Comments: Substrates that received new roofing components were made clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates? (12 in comers, 9 at perimeter, ❑Yes ❑ No perimeters and corners? ❑Yes❑ No 6 in the field) Fasteners checked by technician? ❑ Yes ❑ No Short insulation joints ❑ Yes❑ No staggered? New/Existing Insulation joints tight? ❑Yes ❑ No All joints staggered between ❑ Yes ❑ No layers? Gaps filled with spray foam? ❑Yes ❑ No Drainage crickets installed per plans and specifications? Yes ❑ No Comments: None installed today. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TP0) Membrane allowed to relax prior to ❑ Yes ❑ No Membrane fully welded to Rhino ❑ Yes ❑ No attachment? Plates? Membrane/plate welds checked by ❑Yes ❑ No Membrane properly lapped? ❑Yes 0 No technician? I Seams clean prior to welding? ❑ Yes ❑ No Continuous weld achieved? ❑Yes ❑ No • Page 2 of 4 PSI Project No:654137 - Date: 5-21-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑ Yes ❑ No Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes❑ No T-patches installed? ❑ Yes ❑ No Primary field membrane termination ❑Yes ❑ No (T-bar) installed? Comments: None installed today. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ❑Yes ❑ No Adhesive applied to substrate ❑ Yes ❑ No and allowed to dry? Adhesive applied to back of base ❑ Yes❑ No Adhesive allowed to flash off? ❑ Yes ❑ No flashing? Flashing pressed onto substrate to El Yes ❑ No Flashing properly lapped onto ❑ Yes ❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑Yes ❑ No Membrane flow at welds? ❑ Yes ❑ No Continuous weld achieved? ❑ Yes ❑ No Manufacturer's approved corner ❑ Yes ❑ No patches installed? Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No Termination bars installed? ❑ Yes ❑ No Counterflashings installed? ❑ Yes ❑ No Comments: None installed today. NIGHT TIE-IN I DAMAGE I SITE CLEANUP INSPECTION Night seal installed? ® Yes ❑ No Roofing appears watertight? ® Yes ❑ No Roof drain flashings completed? ❑Yes ® No Damage to property? ❑ Yes ® No Damage to clients equipment? ❑Yes ® No Site broom clean? ❑ Yes ® No All debris removed from roof? El Yes ® No Roof materials and equipment ® Yes ❑ No appear secured? Comments: Areas of new TPO appear to be as watertight as possible. RTU curbs were covered with visqueen. Page 3 of 4 PSI Project No: 654137 Date: 5-21-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail# Detail Name Construction Summary (Quantity/Description/Comment) SUMMARY OF TODAY'S WORK/ DEVIATIONS/ SPECIAL NOTES: Summary Comments: Rain showers hindered production. Roofing crew installed T-patches and various flashings between rain showers. Work performed this date appears to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s): 0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO Page 4 of 4