Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-21 (4) �ii's ]12fOl791Qt1012 &17°°• .ToluildOg Engineering• Consulting• Testing DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 5/21/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area: Various Areas Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate • PSI Report No.: 654137-63-06 Contractor Central Oregon Roofing PSI Hours Worked: 11.0 Approximate Contractor Hours Worked: 11.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? ® Yes ❑ No If No Construction, Inspection Done? ❑ Yes ❑ No Contractor performance issues? ❑ Yes ® No Schedule/scope issues? ❑ Yes ® No • DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 27,360 0 27,360 39,049 70• , 27,360 39,049 70 • Crew Size—6 Roofers—6 Sheet Metal Workers—0 • Page 1 of 4 PSI Project No:654137 Date: 5-21-13 WEATHER CONDITIONS & EMERGENCY COVER ❑ Dry ❑ Sunny ® Cloudy ❑ Windy ® Rain ❑ Snow Temp Range (low-high) 43° to 53° F Emergency cover/protection on-site? ®Yes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? ® Yes ❑ No Off ground or deck? ® Yes ❑ No Covered and vented? 0 Yes ❑ No Roll goods stored on side? ® Yes❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? ❑Yes 0 N material? If Yes, how disposed? ❑ Yes No Comments: Insulation stored on the ground is in original manufacturers wrappers and covered with visqueen. SUBSTRATE PREPARATION Night tie-in removed? ❑Yes 0 No Substrate clean and debris ® Yes ❑ No removed? Substrate and penetrations ready? ® Yes ❑ No Substrate tested for dryness? Z Yes❑ No Comments: Substrates that received new roofing components were made clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates? (12 in corners, 9 at perimeter, ❑Yes ❑ No perimeters and corners? ❑ Yes❑ No 6 in the field) Fasteners checked by technician? El Yes ❑ No Short insulation joints ❑Yes❑ No staggered? New/Existing Insulation joints tight? El Yes❑ No All joints staggered between ❑ Yes ❑ No layers? Gaps filled with spray foam? ❑ Yes ❑ No Drainage crickets installed per ❑ Yes ❑ No plans and specifications? Comments: None installed today. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ❑Yes ❑ No Membrane fully welded to Rhino ❑ Yes ❑ No attachment? Plates? Membrane/plate welds checked by technician? ❑ Yes❑ No Membrane properly lapped? ❑ Yes ❑ No Seams clean prior to welding? ❑ Yes ❑ No Continuous weld achieved? ❑ Yes ❑ No Page 2 of 4 PSI Project No: 654137 Date: 5-21-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑ Yes ❑ No Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No T-patches installed? ❑ Yes ❑ No Primary field membrane termination ❑ Yes❑ No (T-bar) installed? Comments: None installed today. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ❑ Yes ❑ No Adhesive applied to substrate ❑ Yes ❑ No and allowed to dry? Adhesive applied to back of base ❑ Yes ❑ No Adhesive allowed to flash off? ❑ Yes ❑ No flashing? Flashing pressed onto substrate to ❑Yes ❑ No Flashing properly lapped onto ❑ Yes ❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑ Yes❑ No Membrane flow at welds? ❑Yes ❑ No Continuous weld achieved? ❑Yes ❑ No Manufacturer's approved corner ❑Yes ❑ No patches installed? Seams probed by technician ❑Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No Termination bars installed? ❑ Yes ❑ No Counterflashings installed? ❑ Yes ❑ No Comments: None installed today. NIGHT TIE-IN I DAMAGE I SITE CLEANUP INSPECTION Night seal installed? ® Yes ❑ No Roofing appears watertight? ®Yes ❑ No Roof drain fleshings completed? ❑Yes ® No Damage to property? ❑ Yes ® No Damage to client's equipment? ❑Yes® No Site broom clean? ❑ Yes ® No All debris removed from roof? ❑ Yes ® No Roof materials and equipment ® Yes ❑ No appear secured? Comments: Areas of new TPO appear to be as watertight as possible. RTU curbs were covered with visqueen. Page 3 of 4 • PSI Project No:654137 Date: 5-21-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail # Detail Name Construction Summary(Quantity/Description/Comment) SUMMARY OF TODAY'S WORK/ DEVIATIONS/ SPECIAL NOTES: Summary Comments: Rain showers hindered production. Roofing crew installed T-patches and various Fleshings between rain showers. Work performed this date appears to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s):0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO • Page 4 of 4