Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-15 Fr.;• information To Build On D Engineering• Consulting• Testing DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 5/15/13 PROJECT INFORMATION Client:Wal-Mart Stores, Inc. (Store#4178) Work Area: Various Areas Project Name: Roofing Project Manufacturer Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-47-03 Contractor: Central Oregon Roofing PSI Hours Worked: 11.0 Approximate Contractor Hours Worked: 11.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today?? ®Yes Na If No Construction, Inspection Done? ❑ Yes ❑ No Contractor performance issues? ❑ Yes ® No Schedule/scope issues? ❑ Yes IS No DAILY PRODUCTION Total Square Feet Completed To Date J Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 11,200 0 11,200 39,049 28.6 11,200 39,049 28.6 Crew Size—6 Roofers—6 Sheet Metal Workers-0 Page 1 of 4 PSI Project No:654137 Date: 5-15-13 WEATHER CONDITIONS & EMERGENCY COVER Z Dry ❑ Sunny El Cloudy ❑Windy ❑ Rain ❑ Snow Temp Range (low-high) 46° to 63° F Emergency cover/protection on-site? ®Yes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? 0 Yes ❑ No Off ground or deck? ® Yes ❑ No Covered and vented? ® Yes ❑ No Roll goods stored on side? ® Yes ❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? Yes ❑ No material? If Yes, how disposed? ❑ Yes ® No Comments: Insulation stored on the ground is in original manufacturers wrappers and covered with visqueen. SUBSTRATE PREPARATION Night tie-in removed? ❑Yes ® No Substrate clean and debris ®Yes ❑ No • removed? Substrate and penetrations ready? ®Yes ❑ No Substrate tested for dryness? 0 Yes ❑ No Comments: Substrates that received new roofing components appeared clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates? (12 in corners, 9 at perimeter, ❑ Yes ❑ No perimeters and corners? ❑Yes El No 6 in the field) Fasteners checked by technician? ❑ Yes ❑ No Short insulation joints ❑Yes ❑ No staggered? New/Existing Insulation joints tight? ❑ Yes El No All joints staggered between ❑Yes ❑ No layers? Gaps filled with spray foam? ❑ Yes ❑ No Drainage crickets installed per ❑Yes ❑ No plans and specifications? Comments: None installed today. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ❑Yes ❑ No Membrane fully welded to Rhino ❑Yes ❑ No attachment? Plates? Membrane/plate welds checked by technician? ❑ Yes ❑ No Membrane properly lapped? ❑Yes❑ No Seams clean prior to welding? ❑Yes ❑ No Continuous weld achieved? ❑ Yes ❑ No • Page 2 of 4 PSI Project No: 654137 Date: 5-15-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑Yes ❑ No Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑ Yes ❑ No T-patches installed? ❑ Yes ❑ No Primary field membrane termination ® Yes ❑ No (T-bar) installed? Comments: None installed today. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ® Yes ❑ No Adhesive applied to substrate ® Yes ❑ No and allowed to dry? Adhesive applied to back of base ® Yes ❑ No Adhesive allowed to flash off? ® Yes ❑ No flashing? • Flashing pressed onto substrate to Flashing properly lapped onto promote adhesion? ® Yes ❑ No field membrane? ® Yes ❑ No Seams cleaned prior to welding? ® Yes❑ No Membrane flow at welds? ® Yes ❑ No Continuous weld achieved? Z Yes ❑ No Manufacturer's approved corner ❑ Yes ® No patches installed? Seams probed by technician ® Yes❑ No Cut edge sealant installed? ❑Yes Z No Termination bars installed? Z Yes❑ No Counterflashings installed? ❑ Yes ® No Comments: Three roof curbs received membrane base flashing, condenser support legs were flashed, and sidewall flashings were installed. NIGHT TIE-IN / DAMAGE/ SITE CLEANUP INSPECTION Night seal installed? ® Yes ❑ No Roofing appears watertight? ® Yes ❑ No Roof drain flashings completed? ❑ Yes ® No Damage to property? ❑ Yes Z No Damage to client's equipment? ❑ Yes Z No Site broom clean? ❑ Yes Z No All debris removed from roof? ❑ Yes Z No Roof materials and equipment ®Yes ❑ No appear secured? Comments: A night seal was achieved by lapping the new TPO membrane under the existing EPDM membrane. • Page 3 of 4 PSI Project No:654137 Date: 5-15-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail # Detail Name Construction Summary (Quantity/Description/Comment) 7-A4.1 Roof Top Unit One RTU unit was flashed per Detail Drawing.20-A4.1 11-A4.1 Sidewall Flashing Walls were flashed along Line F.8 from 1.8 to 3.2 per Detail Drawing. 20-A4.1 Flashing at Condenser support legs were flashed per Detail Drawing. Condenser Support N/A Rack House Curbs Two Rack House roof curbs were flashed per Detail Drawing 7-A4.1. SUMMARY OF TODAY'S WORK /DEVIATIONS/ SPECIAL NOTES: Summary Comments:Work completed today appeared to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s):0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. • PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO • Page 4 of 4