HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-14 (2) i'ime. Information p i .ToBuildOn 3 (2 - 2 �7D Engineering•Consulting • Testing • DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 5/14/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area: D.1 to E.75 from 1 to 3.9 Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-46-02 Contractor Central Oregon Roofing PSI Hours Worked: 10.0 Approximate Contractor Hours Worked: 10.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? ® Yes ❑ No If No Construction, Inspection Done? ❑ Yes ❑ No Contractor performance issues? ❑ Yes Z No Schedule/scope issues? ❑Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 4,800 6,400 11,200 39,049 28.6 11,200 39,049 28.6 Crew Size—6 Roofers—6 Sheet Metal Workers—0 Page 1 of 4 PSI Project No:654137 - Date: 5-14-13 WEATHER CONDITIONS & EMERGENCY COVER ® Dry ® Sunny ❑ Cloudy ❑Windy ❑ Rain ❑ Snow Temp Range (low-high) 40°to 69° F Emergency cover/protection on-site? ZYes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? Z Yes ❑ No Off ground or deck? ® Yes ❑ No Covered and vented? ® Yes ❑ No Roll goods stored on side? ®Yes ❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? ®Yes ID No material? If Yes, how disposed? ❑ Yes No Comments: Insulation stored on the ground is in original manufacturers wrappers and covered with visqueen. SUBSTRATE PREPARATION Night tie-in removed? ® Yes ❑ No Substrate clean and debris ® Yes ❑ No removed? Substrate and penetrations ready? ® Yes ❑ No Substrate tested for dryness? ® Yes ❑ No Comments: Substrates that received new roofing components appeared clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino• Additional fasteners at Plates? (12 in corners, 9 at perimeter, ® Yes ❑ No perimeters and corners? ® Yes ❑ No 6 in the field) Fasteners checked by technician? ® Yes El No Short insulation joints ®Yes ❑ No staggered? New/Existing Insulation joints tight? ®Yes❑ No All joints staggered between ® Yes ❑ No layers? Gaps filled with spray foam? ® Yes❑ No Drainage crickets installed per ® Yes ❑ No plans and specifications? Comments: Rhino plates and JM High Load#15 screws were installed per JM Specification TRH-6. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ® Yes❑ No Membrane fully welded to Rhino ®Yes ❑ No attachment? Plates? Membrane/plate welds checked by technician? IS Yes❑ No Membrane properly lapped? ® Yes ❑ No Seams clean prior to welding? ® Yes❑ No Continuous weld achieved? ® Yes ❑ No • Page 2 of 4 PSI Project No:654137 Date: 5-14-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ®Yes❑ No Seams probed by technician ® Yes ❑ No Cut edge sealant installed? ® Yes ❑ No T-patches installed? ❑ Yes ® No Primary field membrane termination ® Yes❑ No (T-bar)installed? Comments: Approximately 6,400 square feet of 60 mil reinforced TPO membrane was placed and welded. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ❑ Yes ❑ No Adhesive applied to substrate ❑Yes ❑ No and allowed to dry? Adhesive applied to back of base ❑ Yes ❑ No Adhesive allowed to flash off? ❑Yes ❑ No flashing? Flashing pressed onto substrate to Yes❑ No Flashing properly lapped onto El ❑ Yes ❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑Yes ❑ No Membrane flow at welds? ❑ Yes ❑ No Continuous weld achieved? ❑Yes❑ No Manufacturer's approved corner ❑Yes ❑ No patches installed? Seams probed by technician ❑Yes ❑ No Cut edge sealant installed? ❑Yes ❑ No Termination bars installed? ❑ Yes❑ No Counterflashings installed? ❑Yes ❑ No Comments: None installed today. NIGHT TIE-IN /DAMAGE/ SITE CLEANUP INSPECTION Night seal installed? ®Yes❑ No Roofing appears watertight? ®Yes❑ No Roof drain flashings completed? ❑Yes ® No Damage to property? ❑ Yes ® No Damage to client's equipment? ❑Yes® No Site broom clean? ❑ Yes ® No All debris removed from roof? ❑Yes ® No Roof materials and equipment ® Yes ❑ No appear secured? Comments: A night seal was achieved by lapping the new TPO membrane under the existing EPDM membrane. Page 3 of 4 PSI Project No:654137 Date: 5-14-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail # Detail Name Construction Summary (Quantity/Description/Comment) SUMMARY OF TODAY'S WORK/ DEVIATIONS/SPECIAL NOTES: Summary Comments: Work completed today appeared to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s):0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO Page 4 of 4