DAILY OBSERVATION REPORT OF
SINGLE-PLY THERMOPLASTIC ROOFING
Date: 5/28/13
PROJECT INFORMATION
Client:Wal-Mart Stores, Inc. (Store#4178) Work Area:A to B from 1 to 2.6
Project Name: Roofing Project Manufacturer Johns Manville 60 mil reinforced TPO
Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate
PSI Report No.: 654137-82-11 Contractor: Central Oregon Roofing
PSI Hours Worked: 10.0 Approximate Contractor Hours Worked: 10.0
SIGNATURES
Sam Stoner Isaac Doug Roth, RRO
PSI Quality Assurance Observer Roofing Contractor Reviewed By:
Representative PSI Project Manager
PROJECT STATUS AT-A-GLANCE
Today's Performance Comment
Construction today? ®Yes ❑ No If No Construction, Inspection Done?❑Yes ❑ No
Contractor performance issues? ❑Yes 0 No
Schedule/scope issues? ❑ Yes ® No
DAILY PRODUCTION
Total Square Feet Completed To Date
Previously Today's Total Square Total Square
Roof Section Completed Square Feet Feet Feet in % Complete
Square Feet Completed Completed Section
Main Roof Area 35,295' 3,249 38,544 39,049 98.7
38,544 39,049 98.7
Roofers—4 •
Crew Size—4 Sheet Metal Workers—0
'Square foot totals were adjusted on this reporting date and are believed to be accurate
Page 1 of 4
PSI Project No:654137 Date: 5-28-13
WEATHER CONDITIONS & EMERGENCY COVER
® Dry ❑ Sunny ® Cloudy ❑Windy ❑ Rain ❑ Snow Temp Range (low-high) 52° to 65° F
Emergency cover/protection on-site? ®Yes ENo Type of Protection - TPO& EPDM membrane
MATERIALS CONTROL & STORAGE
In original identified packaging? ®Yes❑ No Off ground or deck? ®Yes❑ No
Covered and vented? ®Yes ❑ No Roll goods stored on side? ®Yes ❑ No
Adhesive storage temperature ❑ Yes® No Unapproved, damaged, or wet ❑Yes No
maintained?
material? If Yes, how disposed?
Comments: Stored material protection appears adequate.
SUBSTRATE PREPARATION
Night tie-in removed? ®Yes❑ No Substrate clean and debris ® Yes❑ No
removed?
Substrate and penetrations ready? ®Yes❑ No Substrate tested for dryness? 0 Yes❑ No
Comments: Substrates that received new roofing components appeared clean and dry.
COVER BOARD APPLICATION (1" ENERGY 3)
Correct Number of fasteners &Rhino
Plates?(12 in corners, 9 at perimeter, 0 Yes❑ No Additional fasteners at ® Yes❑ No
6 in the field) perimeters and corners?
Fasteners checked by technician? ®Yes ❑ No Short insulation joints ® Yes ❑ No
staggered?
New/Existing Insulation joints tight? ®Yes ❑ No All joints staggered between
layers? 0 Yes❑ No
Gaps filled with spray foam? ®Yes❑ No Drainage crickets installed per
plans and specifications? ®Yes ❑ No
Comments: The isocyanurate was fastened per the roofing manufacturer's specified fastener frequency.
SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO)
Membrane allowed to relax prior to ®Yes❑ No Membrane fully welded to Rhino ❑Yes 0 N
attachment? Plates?
Membrane/plate welds checked by
technician? ®Yes❑ No Membrane properly lapped? ®Yes❑ No
Seams clean prior to welding? ®Yes❑ No Continuous weld achieved? 0 Yes❑ No
Page 2 of 4
PSI Project No:654137 Date: 5-28-13
SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D)
Membrane flow at lap welds? ® Yes❑ No Seams probed by technician ®Yes❑ No
Cut edge sealant installed? ❑Yes 0 No T-patches installed? ❑Yes® No
Primary field membrane termination ❑ Yes® No
(T-bar) installed?
Comments: Not all induction welds were completed today(work in progress).
BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO)
Substrate clean and prepared? ❑Yes❑ No Adhesive applied to substrate ❑Yes❑ No
and allowed to dry?
Adhesive applied to back of base ❑Yes❑ No Adhesive allowed to flash off? ❑ Yes❑ No
flashing?
Flashing pressed onto substrate to ❑ Yes ❑ No Flashing properly lapped onto ❑Yes❑ No
promote adhesion? field membrane?
Seams cleaned prior to welding? ❑Yes ❑ No Membrane flow at welds? ❑ Yes❑ No
Continuous weld achieved? ❑ Yes❑ No Manufacturer's approved corner ❑Yes❑ No
patches installed?
Seams probed by technician ❑ Yes❑ No Cut edge sealant installed? ❑ Yes ❑ No
Termination bars installed? ❑Yes ❑ No Counterflashings installed? ❑ Yes❑ No
Comments: None installed today.
NIGHT TIE-IN/ DAMAGE /SITE CLEANUP INSPECTION
Night seal installed? 0 Yes❑ No Roofing appears watertight? 0 Yes❑ No
Roof drain fleshings completed? ❑Yes 0 No Damage to property? ❑Yes 0 No
Damage to client's equipment? ❑Yes® No Site broom clean? ❑ Yes® No
All debris removed from roof? ❑Yes 0 No Roof materials and equipment ®Yes❑ No
appear secured?
Comments:Areas of new TPO roofing appear to be watertight. The roof needs to be cleaned off.
Page 3 of 4
PSI Project No:654137 Date: 5-28-13
DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE)
Detail# Detail Name Construction Summary(Quantity/Description/Comment)
SUMMARY OF TODAY'S WORK/DEVIATIONS/ SPECIAL NOTES:
Summary Comments: Work completed today appeared to conform to project plans and specifications.
Unresolved EVOCO Deviation Number(s):0
Special Notes: None today.
Respectfully Submitted,
PROFESSIONAL SERVICE INDUSTRIES,INC.
PSI Roof Observer: Sam Stoner
CC: Portland, OR—One copy electronically
Reviewed By: Doug Roth, RRO
•
Page 4 of 4