Loading...
HomeMy WebLinkAboutItem 02 Downtown Demonstration Lighting AGENDA ITEM SUMMARY Meeting Date: 6/24/2013 Meeting Type: Work Session Staff Contact/Dept.: John Tamulonis, CMO Staff Phone No: 541-726-3656 Estimated Time: 20 Minutes S P R I N G F I E L D C I T Y C O U N C I L Council Goals: Promote and Enhance our Hometown Feel while Focusing on Livability and Environmental Quality ITEM TITLE: DOWNTOWN DEMONSTRATION LIGHTING ACTION REQUESTED: Staff seeks to provide Council with an update on efforts to scope a demonstration lighting project in Downtown. No specific action is requested at this time. ISSUE STATEMENT: During an April work session with the City Council, staff provided an update of the 2010 Downtown District Urban Design Plan. One activity identified in the Plan is improvements to the downtown pedestrian environment, including improved lighting. Lighting needs in downtown have been identified as a top priority by Council, citizens, and consultants responsible for the Downtown Circulation Study. Over the past months, staff has worked with downtown stakeholder groups to identify an ideal location to pilot a lighting improvement project. ATTACHMENTS: 1. Proposed Downtown Demonstration Lighting Project Location and Scale 2. Pedestrian Scale Light Fixture Image DISCUSSION/ FINANCIAL IMPACT: In May, City staff met with downtown stakeholders including the members of the Downtown Citizen Advisory Committee and Main Street Committees. During this meeting, staff and citizens walked downtown during evening hours to assess areas perceived to be deficient in pedestrian level lighting. This walk-about was used to assist the City Traffic Engineer in identifying the proposed demonstration project location (Attachment 1). Considered project options included; • Installation of lighting on the north side of Main Street from Pioneer Pkwy East to the east side of 5th Street (current proposed project) • Installation of lighting on both block faces along Main Street from 5th Street to 6th Street • Installation of bollards and raised crosswalks • Installation of sidewalk furniture including, benches, bike corrals, planters, and trash receptacles The proposed project location includes eight new fixtures along the north side of Main Street between Pioneer Parkway East and the east side of 5th Street. Funds have been identified in the Downtown Urban Renewal budget to support the installation of the lighting as well as possible installation of several sidewalk furniture-type improvements. This project was identified based on input from downtown stakeholders directing staff to focus on lighting, installing fixtures quickly. While stakeholders expressed interest and value in other proposed options, they advised staff to focus first on the installation of light fixtures. Total cost for the project is expected not to exceed $150,000. Next steps would include complete design, engineering estimates, and bidding of the project beginning July 1st with award likely some time late fall. Demonstration  Lighting  Project   Pioneer   Parkway   East   to  4th  Street   Attachment 1,  Page  1 of 2  Demonstration  Lighting  Project   4th  Street   to   5th  Street   Attachment 1,  Page  2 of 2  LIGHTING FIXTURE DETAIL    14 foot to top of finial  Powder coated black   aluminum  LED fixture  Receptacles in fixture to   connect seasonal lights      Attachment 2