Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-16 6032 N.Professional Service I°dusts 480 Inc. 6032 N.Cutter 7217 Suite 480 In 0rmation Ponanc.OR 972,7 nToBuild On P°B No.,32 Stz Phone: —2-c370 '.(503))288 9-,778 Engineering • Consulting • Testing Fax.(503)289-1918 ( t Report No: SIDF:0 6 541 37-42/1 Special Inspection Daily Field Report Issue No: 1 Client: WAL-MART STORES, INC. CC: BLAKE JOHNSON, These lest results apply only to the speedo locations and materials noted and mar not DAVID NICHOLS, re present any other locations or elevations.This repon may not he reproduced,except in mn, 2001 S E 10TH ST wenonr written permission by Professional service Industries.Inc.I anomeompnancn MAIL STOP 5570 ERIC EVENSON, appears on this report,to the extent that the reported n"ncompiiance""pacts the protect, he BENTONVILLE, AR 72716-5570 KATYRYN resolution isuwsiduma PSI same of engagement. ROBERT IC ROBER (0--t RT CAA STILE, Project: WM 4178-00 SPRINGFIELD OR TO WILSON HU Approved Signatory:Deborah Priest (Special Project Manager) SPRINGFIELD OR Date of ssue:521/2013 Date: 5/16/2013 General Contractor: SD Deacon Permits: 811-SPR2012-02370 Weather: Exterior/Temps. 58 to 63 degrees F. Type of Inspection Performed ® Reinforced Concrete ❑ Structural Masonry ❑ High Strength Bolting ❑ Fireproofing ® New Inspection ❑ Re-Inspection ❑ Reinforcing Steel ❑ Soils ❑ Welding ❑ Other Standby Time: ' Field Observations & Comments ® Special Inspection ❑ Continuous ® Periodic Location(s)/Item(s): (2)truck dock leveler pits at grids A.1 to A.4 from 2.4 to 2.6 Referenced Details/Drawings: #3's at 12"on center each way #3 "Z"bars(2'-0"x 1'-8"x 1'-8")around the perimeters of both pits Inspected for required clear space of 3"for the bottom and sides. Sheet 51, Sheet 52.1/1, Sheet S2/12, 13 Remarks: On site at contractors request to perform periodic visual inspection of the(2)truck dock leveler pits at grid lines A.1 to A.4 form 2.4 to 2.6. Dynasty Concrete Co. has placed the#3'at 12"on center each way for the bottom matt of each dock leveler pit and has also placed the #3 `Z"bars (2'-0"x 1'-8" x 1'-8") at 12"on center around the perimeters of both pits. Dynasty has also drilled into the existing slab on grade 6"for the a/n"x 1'-0"smooth dowels at 24"on center to be placed with grease into the existing slab end as per detail 1/S2.1. Dynasty has also drilled the 6"deep holes for the#3 x 4'-0" (2'-0"x 2'-0") hooked dowels to be placed along grid line 2.6 as per details 12/S2. These holes will be epoxied in at a later time. Some preliminary form work has been completed for the sides and front. This work in ongoing. To the best of PSI's knowledge,the work inspected to the approved construction documents are: ® Conforming ❑ Non-Conforming • Inspector: Dale Russell Inspector Cert No.: ICC#8005920 Jobsite Representative: Page 1 of 1 •