Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-1 (2) f C Professional Service Industries,Inc. • �[/ ^ In br� Gbon 6032 N.Cutter Circle,Suite 480 J (l ,/ Portland,OR 97217 PCB eo. 176269 GR/ Z .y 3 7o Build On Phone: . 176289-1778 f lEngineering • Consulting • Testing Fax (503)289-1918 Report No:DFR:0654 Daily Field Report Issue ssue N o:1:� Client: WAL-MART STORES, INC. CC: BLAKE JOHNSON, These lrat results apply only tothe spednt locations and rnatenals noted and may not reoresem uny other permission ns or emvalions.cols report may nor ce reproduced eacent in mi. 2001 S E 10TH ST DAVID NICHOLS, w,tnoptanttenperrnissmnbyProlessional Service Industries,Inc.Itanon-compliance MAIL STOP 5570 ERIC EVENSON, appears on this report,to the extent that ne reported mnmmphance Impacts the proiea.the resolution is outside the PSI scope of engagement. BENTONVILLE,AR 72716-5570 JERKOVN �� JERKOVICH, WILSON HU Project: WM 4178-00 SPRINGFIELD OR TO SPRINGFIELD OR Approved Signatory:Deborah Priest(Special Project Manager) Date of Issue:51152013 Date: 5/1/2013 Technician: Glenn Meek Inspected the reinforcing mats at slab on grade at grid line A.1 to B at 1.2 to 1.8 and at the freezer slab on grade reinforcing at B to B.5 at 3.1 to 4 for clearances, both placed on dobies to maintain clearances. Inspected and tested the 84 '/a cubic yards'of concrete supplied by Knife River mix# 7RNE5300. Concrete placed with a line pump and was mechanically consolidated. Tested concrete for slump, temperature, air content and cast (1) set of 95) 4"x8" cylinders for strength testing at appointed date.