Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-4 (2) ^ Professional Service Industries.Inc. 4LLJ!Gs l ti 017 Information Portland,N. OR g7p17.Suite 480 � CCB No.176269 S 12- 3 7 O To Build On Phone:(503)289-1778 Engineering • Consulting • Testing Fax:(503)289-1918 Daily Field Report Report No: DFR:06 Issue N : 1 ssue No: 1 W AL-MART STORES, INC. These test resells apply only to the specific locations and materials noted and may not Client: CC: represent any other locations or elevations.This report may not be reproduced,excels,' 2001 S E 10TH ST BLAKE JOHNSON, BOB in lull without wntten permission by Professional Service Industries, Inc. If a non- compliance appears on ,s report,to the extent that the reported rd compliance MAIL STOP 5570 GARRISON, CAITLIN Impact n s the project.the resolution outside the PSI scope of engagement BENTONVILLE, AR 72716-5570 NUGENT,DALE RUSSELL, DAVID NICHOLS, ERIC EVENSON,KATYRYN Project: WM 4178-00 SPRINGFIELD OR TO JERKOVICH, ROBERT _ _ SPRINGFIELD. OR CASTILE,WILSON HU Approved Signatory: Deborah Priest(Special Project Manager) Dale of Issue: 6/12/2013 Date: 6/4/2013 Technician: Dale Russell Haps masonry on site continuing to place the cultured stone veneer for the knee walls and columns of the shopping cart storage area, cast (1) set of(4) 2 x 4 mortar samples for compressive strength verification testing at 7 and 28 days. Dynasty Concrete Co., on site finishing the re-steel placement for the front vestibule, see attached re-steel report. Dynasty placed 14.75 yds of Knife River mix ID# 7RNE5300, 3500 psi structural concrete today, 10.75yds in 6" S.O.G. of the front vestibule and 3 yds for the miscellaneous 4" S.O.G. repairs, and approximately 1 yd for the raised slabs within the electrical room, all concrete was consolidated using H/F vibrators, all concrete was hand finished. Cast (1) set of(5)4 x 8 cylinders for compressive strength verification testing at 7,28 and 56 days.see daily field report for specific test results. Crestview Construction co., also placed approximately 3 yds of the same mix around the base of the grease interceptor, cylinders cast represent the placement also. On site to perform continuous visual inspection of the placement of(6) 65"#5 verts for the column and pilaster at grids A.2/2.6 and the CMU infill at grids A.1/2.6 both areas are at the truck dock doors. The 3/4" holes were drilled to a verified length of 6 1/2", holes were bottle brushed and blown clear using compressed air, the approved epoxy used was Hilti HIT-HY 150 MAX SD, experation date 2-14, ICC-ESR 3013. C2000-2013 OESTLab by SpeclraOEST.com Page I of I