Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-24 Professional Service Industries,Inc. ❑ Information 6032 N.Cutter Circle,Suite 480 ) Portland,OR 97217 S To Build On CCB N , 176269 S(503)289-1778 ( �_ 23 7 0 Engineering • Consulting • Testing Fax:(503)289-1918 Daily Field Report Report No: DFR:0654137-60 Report No: 1 Client: WAL-MART STORES, INC. CC: These test results apply only to the sceat,c locations and materials noted and may not represent any other locations or elevations.This report may not be repr duce I.eaten 2001 S E 10TH ST BLAKE JOHNSON, DALE in tug.without written permission by Professional Service Industries. Inc.If a non- compliance STOP 5570 compliance appears on this report,to de extent mat the reported non-compliance RUSSELL, DAVID NICHOLS, Impacts the project the resolution is outside me PS PSI scope of engagement. BENTONVILLE, AR 72716-5570 ERIC EVENSOO KATYRYN 0-2_/" JERKOVICH, ROBERT CASTILE,WILSON HU Project: WM 4178-00 SPRINGFIELD OR TO SPRINGFIELD, OR Approved Signatory: Deborah Priest(Special Project Manager) Date of Issue: 51282013 Date: 5/24/2013 Technician: Dale Russell Arrived on site and performed visual inspection of the 10 Mill polyethylene vapor barrier was placed over the sub slab, . noted required overlaps and taped seams prior to the placement of the 6"thick rigid insulation being placed in (2) 3" opposing layers, also noted proper orientation and spacing of the (2) 16" x 16"x 1/2" embed plates along gridline 3 of the topping slab prior to the concrete being placed. On site to monitor the placement of Knife River mix ID #081-7RNE5300, 3500 psi structural concrete, sampled midload of first truck at the discharge point of the pump truck and perform testing for slump, air entrainment, temperature, unit weight and Cast (1) set of(5)4 x 8 cylinders for compressive strength verification testing at 7 and 28 days, all concrete placed was hand finished, all edges were consolidated using hand held high frequency vibrators, see daily special inspection report for specific test and placement details. Made of Steel is on site constructing the cart storage canopy frame consisting of(2) HSS 10 x 6 x 5/16" and W 12 x 16 beams per detail, Sheet S6 and S6.1, Made of Steel is also placing the miscellaneous steel door frames within the interior of the building. • • • ©2000-2013 OESTLab by SpectraOEST.com Page 1 of 1