Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-22 (3) Professional Service Industries,Inc. „alp ma Infortion 6032 N.Cutter Circle,Suite 480 Portland,OR 97217 �° aTo Build On CC6 No.176269 �` —� 7 Phone:(503)289-1778 �J Engineering • Consulting • Testing • Fax (503)289-1918 Slab on Grade Observation Report Report No: SGI:065ss Issue a No: Client: WAL-MART STORES, INC. CC: 2001 S E 10TH ST BLAKE JOHNSON, DALE MAIL STOP 5570 RUSSELL, DAVID NICHOLS, BENTONVILLE, AR 72716-5570 ERIC EVENSON, KATYRYN JERKOVICH, ROBERT CASTILE,WILSON HU Project: WM 4178-00 SPRINGFIELD OR TO SPRINGFIELD, OR Approved Signatory: Dale of Issue: General Details Date: 5/22/2013 Technician: Dale Russell Weather: Sprinkling Location: Plans Used: MI Contract Drawings ❑Approved Shop Drawings Current Date and Revision/Submittal No. on Drawings: 11/16/12 Revision 1 dated 2/21/13 Drawing (page) and Detail Nos.: S2/3. S4. S6/4 Formwork Formwork, if required, appears to conform to contract document requirements. YES Forms appear to be plumb. YES Dimensions appear to be correct. YES Orientation appears to be correct. YES Debris appears to have been removed from formed areas. YES Forms appear to be lubricated for removal, if applicable. N/A Forms do not appear to be excessively deformed or damaged. YES Forms appear to be properly constructed. YES Reinforcement Longitudinal and transverse reinforcing steel appears to be of the correct size and spacing. YES Longitudinal and transverse reinforcement bars appear to have correct lap length. YES Hooks provided appear to be as detailed. YES Reinforcing appears to have proper concrete cover. YES Embedment plates appear to be correct size and have proper stud count and size. N/A Embedment plates appear to be located properly. N/A Remarks All concrete was consolidated using H/F vibrators, all concrete was hand finished. "R/I"indicates Re-Inspection is needed. ®2000-2013 DESTIab by SpectraOEST.com Page 1 of 1