Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous Field Test & Inspection Report 2013-5-21
• Professional Service Industries,Inc. InfoYl i2Cltlon 6032 N.Cutter Circle.Suite 480 Portland,OR 97217 / �7 To Build On Phone:(503)289-1778 S 1 2—p2 1.= ngineering • Consulting • Testing Fax:(503)289-1918 Daily Field Report Report No: DFR:06Is41 Issue No:No: 1 1 Client: W AL-MART STORES, INC. CC: These test results apply only to the specific locations and materials noted and may not represent any other locations or elevations.This report may not be reproduced.except 2001 S E 10TH ST BLAKE JOHNSON, DALE in lull without written permission by Professional Service Industries, lea If asnon- MAIL STOP 5570 compliance appears on iris report,to the eared that Me reported w compliance RUSSELL, DAVID NICHOLS, imparts me project.the resolution is outside me Psi scope of ergagementh BENTONVILLE, AR 72716-5570 ERIC EVENSON, KATYRYN JERKOVICH, ROBERT CASTILE,WILSON HU Project: WM 4178-00 SPRINGFIELD OR TO 'Z SPRINGFIELD, OR Approved Signatory: Deboran Priest(Special Project Manager) Dale of Issue: 5/28/2013 Date: 5/21/2013 Technician: Dale Russell Crestview Construction Co., on site working on miscellaneous curb grade for the parking lot, and the trench for the drain from the bale and pallet storage area. Dynasty Concrete Co., on site finishing the re-steel and form work for the footings of the knee walls just East of grid line G, see re-steel daily inspection report for specific information. Overhead Door Co., is on site placing the roll down door for the pharmacy area, this includes placing the (2) 4"x4"x3/16"x12'-0" HSS columns with attached 11 r"x8r"x5/8" base plates. On site to observe the placement of the (8) 5/8"x3 5/8"wedge anchors, (4) per column, the 5/8" DIA holes were drilled to a verified depth of 3 3/4", prior to the anchors being installed, the holes were blown out, the anchors were placed and torqued to the manufacturers recommendations of 20 foot lbs. Haps Masonry Co., rained out at 13:00. Due to dimensional issues with the existing insulated freezer slab, it is being demoed and replaced with a new insulated slab having the corrected dimensions. ©2000-2013 QESTLab by SpeclraQEST.com Page 1 of 1