Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-17 (2) Professional Service Industries,Inc. Information 6032 N.Cutter Circle,Suite 480 Portland,OR 97217 ` 7 CCB No.176269 (� (� ` L 7 ®To Build O n phone'(503)289-1778 \/L/ d')�,-�jJ Engineering • Consulting • Testing Fax:(503)289-1918 Report No: DFR:0654 Daily Field Report Issue No:No: Client: WAL-MART STORES, INC. CC: 2001 S E 10TH ST BLAKE JOHNSON, DAVID MAIL STOP 5570 NICHOLS, ERIC EVENSON, BENTONVILLE,AR 72716-5570 KATYRYN JERKOVICH, ROBERT CASTILE,WILSON HU Project: WM 4178-00 SPRINGFIELD OR TO SPRINGFIELD, Approved Issue:PRINGFIELD, OR Date of Date: 5/17/2013 Technician: Dale Russell On site to observe Crestview Construction Co, preparing the (2)3'-6"x 3'-0"x 1'-0" F3 footings for the cart storage knee wall next to the front vestibule, Crestview removed the native subgrade to the required depth and then the area was probed with a 5/8"diameter geo probe, there was some soft areas within the excavation to an approximate depth of 4-5 inches, Crestview removed an additional 8-9"of native material and then the area was probed again revealing firm native subgrade with little or no penitration with the geo probe, a layer of geo fabric was added to further stabilize the 3/4" moisture conditioned aggregate, the first 8" loose lift was placed but no comp active efforts were applied, this will be done Monday. Haps Masonry Co., arrived on site and began to prep for the 10' CMU screen wall along gidline A, palletized CMU units arrived and PSI rep Glen Meek received (6) samples of each type of CMU units and transported them to our Portland office for absorbtion testing and compresive strength verification testing. Oldham crane service was on site this morning placing (2) chiller towers and (2) motor housing units on the roof. • 4 2000-2013 QESTLab by SpectraQEST.com Page 1 of 1