Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-5-9 Professional Service Industries,Inc. • r Information 6032 N.Cutter Circle,Suite 480 Portland,OR 97217 ,62_______EL To Build On Phane:(503)269-1778 Si L GCB No. 176269 Engineering • Consulting • Testing Fax (503)289-1918 Daily Field Report Report No:DFR:06541 Issue sue No:No:1 1 Client: WAL-MART STORES, INC. CC: BLAKE JOHNSON, Tbese(estresunsapgyomytolnesveorcwcabonsammaerialsroieeammayaoi represent any other iocafnby or elevations.ms report may rnl pe reproduced,eucept in wl. 2001 S E 10TH ST DAVID NICHOLS, n+mow.nnen permission by Prdressenal sense aYluames,Inc It a noncompliance MAIL STOP 5570 ERIC EVENSON, appears on this report.to the extent that he reported noncompliance impacts the project,he resolution is omaide the PSI scope of erpmemenl. BENTONVILLE,AR 72716-5570 JERKOVN �� JERKOVICH, WILSON HU Project: WM 4178-00 SPRINGFIELD OR TO SPRINGFIELD OR Approved Signatory:Deborah Priest(Spedal Project Manager) Date of Issue:5/152013 Date: 5/9/2013 Technician: Dale Russell On site at 6:30am at the contractors request to perform periodic visual inspections of the stepped spread footing along grid line A from 2.6 to 4.8 for the new screen wall of the loading dock. Dynasty Concrete Co. is on site finishing the layout and placing the re-steel, performed several visual inspections throughout the day within this areas assuring the double matt re steel within the (5) steps of this spread footing are properly placed and the clearance tolerances are met. A final re-steel inspection will need to be done prior to the concrete pour taking place. Crestview Construction is continuing to remove the saw cut areas of the old truck loading dock at the concrete for the new loading dock and trenching for the various areas around the outside perimeter of the existing building. • McLane Plumbing is on site continuing to work on the area between grids B and C from 4.5 to 6, this area is for the managers office, mechanical room, rest rooms and the produce prep and coolers. McLane Plumbing is placing the Y.." moisture conditioned material and compacting it with the use of a jumping jack and a vibrating plate compactor, see PSI representative Glenn Meek's report for the Field Density Testing results. All tests performed resulted in meeting or passing the 95% minimum compaction requirements. • • •