HomeMy WebLinkAboutNotice PLANNER 12/14/2012 Gvt
rs E ER/E
AFFIDAVIT OF SERVICE DEC 1 4 2012
By:1 -4 &
STATE OF OREGON ) I d 7 P
ss.
County of Lane
I, Karen LaFleur, being first duly sworn, do hereby depose and say as follows:
1.. I state that I am a Program Technician for the Planning Division of the
Development Services Department, City.of Springfield, Oregon.
2. I state that in my capacity as, Program Technician, I prepared and
caused to be mailed copies of?YPl12r00035 ?2etc&o' - Typerrimed
(See attachment "A") on 1a1t`f , 2012 addressed to (see fs!<il Au(
Attachment "B"), by causing said letters to be placed in a U.S. mail box MOtt'.
with postage fully prepaid thereon.
Atat-P-00/..
4etdetto
Karr
STATE OF OREGON, County of Lane
December- I4j , 2012. Personally appeared the above named Karen
LaFleur, Program Technician, who acknowledged the foregoing instrument to
be their voluntary act Before me:
WA _
- OFFICIAL SEAL
q
wart DAS MUTTON My Commission Expires: ialatfil .6
`
f)- NOTARY PUBLIC-mom
J
Gomm*No.noes
MP CONNISSION EAIIAES KUNlEO I
• • • SPRINGFIELD
TYPE I FINAL MASTER PLAN MODIFICATION,
STAFF REPORT & DECISION II i Lear
OREGON
Project Name: Liberty Professional Center Final Master Plan Modification
Project Proposal: Modify the Liberty Professional Center Master Plan phasing schedule and timetable
Case Number: TYP112-00035 t
Project Location: International Way at
Corporate Way
1
Assessor's Map: 17-03-15-40,TL 3200-3600
Zoning: Campus Industrial (CI) ,
Gateway Refinement Plan Designation: . -.-
Special Light Industrial(SLI)
• Liberty Professional Center
Master Plan Area
Application Submitted Date: Nov. 13, 2012
Decision Issued Date: December 14, 2012 •
_ Lore LC41
Associated Applications: LRP2007-00020; _"- . ,.,.1 1:7 /7W' _ - - _
SUB2007-00018; SUB2007-00055; - - � -
TYP212-00009 I_
Appeal Deadline Date: ' is t" = j
t
Type 1 Ministerial Decision. No provision for
appeal in accordance with SDC 5.1-125.C. - - --
APPLICANT'S DEVELOPMENT REVIEW TEAM
Owner: Applicant: Applicant's Representative:
Garfield Associates Dan Giustina Scott Stolarczyk, AIA
P.O. Box 529 Giustina Resources Robertson Sherwood Architects PC
Eugene,OR 97440 P.O. Box 529 132 East Broadway, Suite 540
Eugene, OR 97440 Eugene, OR 97401
CITY OF SPRINGFIELD'S DEVELOPMENT REVIEW TEAM
POSITION REVIEW OF NAME PHONE
Project Manager Planning Andy Limbird 541-726-3784
Transportation Planning Engineer _ Transportation Michael Liebler 541-736-1034
Civil Engineer Utilities Clayton McEachern 541-736-1036
Civil Engineer Sanitary& Storm Sewer Clayton McEachern 541-736-1036
Deputy Fire Marshal Fire and Life Safety Gilbert Gordon 541-726-2293
Building Official Building David Bowlsby 541-736-1029
TYP 112-00035 Final Master Plan Modification Page 1 of 5
• •
SITE INFORMATION
The property involved in this request is the Liberty Professional Center Master Plan area at the northeast corner of
International Way at Corporate Way (Map 17-03-15-40, Tax Lots 3200-3600). The Master Plan was approved by
the Planning Commission in 2007 as Case LRP2007-00020. The Master Plan area contains five lots ranging from
1.4 to 5.0 acres in size. Lots 1, 2, 4 and 5 have frontage on Corporate Way and/or International Way, while Lot 3 is
set back from the public street frontage. Legal access to Lot 3 is afforded through Lots I and 5 by virtue of
recorded joint access easements. Currently, the Master Plan area is vacant and a portion of Lot 3 has been graded
in anticipation of the initial phase of development approved in late 2007. However, no further development
occurred after the project was abandoned.
PROPOSED MODIFICATIONS
The Master Plan describes the development template for the Liberty Professional Center development, including
the planned utility scheme, site access and vehicle circulation pattern, stormwater management facilities, building
footprints, and phasing schedule. Master Plans are typically valid for a seven year period with provision for
extension. In this case,the Master Plan is already 51/2 years old and no significant development has occurred on the
site. The Liberty Professional Center Master Plan also contemplated an initial phase of development on Lot 3 at
the northeast corner of the plan area. Because the Lot 3 project was briefly initiated and subsequently abandoned,
the applicant is proposing to modify the phasing schedule and overall timetable for the Master Plan area. The
nature of the proposed modifications to the Master Plan is limited to changing the phasing schedule to facilitate
initial development on Lot 5, and extending the timetable for completion of the Master Plan development. In
accordance with provisions of Section 5.13-135.A of the Springfield Development Code (SDC), the proposal is
being reviewed as a Type I Final Master Plan Modification.
DECISION
Preliminary Master Plan Modification approval as of the date of this letter, subject to the conditions described
herein. The application was deemed complete on November 13, 2012, and this decision is issued on the 31st day of
the 120 days mandated by the State.
CRITERIA FOR APPROVAL
A. Plan/Zone Consistency: The existing or proposed zoning shall be consistent with the Metro Plan
diagram and/or applicable text. In addition, the Preliminary Master Plan shall be in compliance with
applicable City Refinement Plan, Conceptual Development Plan or Plan District standards, policies
and/or diagram and maps.
Finding 1: The site is zoned Campus Industrial in accordance with the Springfield Zoning Map and designated
Special Light Industrial in accordance with the adopted Gateway Refinement Plan diagram. The existing
zoning is comparable and compatible with the plan designation, and there are no proposed changes to the
zoning for the Master Plan area.
Conclusion: This proposal satisfies Criterion A.
B. Zoning District Standards: The Preliminary Master Plan shall be in compliance with applicable
standards of the specific zoning district and/or overlay district.
Finding 2: The existing Liberty Professional Center Master Plan is in compliance with provisions of the
Campus Industrial District, and there are no substantive changes proposed to the Master Plan that would affect
its compliance.
Conclusion: This proposal satisfies Criterion B.
TYP 112-00035 Final Master Plan Modification Page 2 of 5
• •
C. Transportation System Capacity: With the addition of traffic from the proposed development, there is
either sufficient capacity in the City's existing transportation system to accommodate the development
proposed in all future phases or there will be adequate capacity by the time each phase of development is
completed. Adopted State and/or local mobility standards, as applicable, shall be used to determine
transportation system capacity. The Preliminary Master Plan shall also comply with any conditions of
approval from a Metro Plan diagram and/or text amendment regarding transportation and all
applicable transportation standards specified in SDC Chapter 4.
Finding 3: A Traffic Impact Study (TIS) was prepared by Branch Engineering Inc. for the Liberty Professional
Center Master Plan area in 2007. Staff reviewed and accepted the findings of the TIS at the time of Master
Plan approval, and the applicant is not proposing to modify the public street system or anticipated traffic
patterns generated by the development area.
Finding 4: Since the time of the original TIS and Master Plan approval, the Gateway bus rapid transit (EmX)
system has been extended along International Way to serve the Master Plan area and other sites in the vicinity.
The transportation system capacity has not been adversely impacted by this transit system upgrade, but it has
greatly enhanced the public transit service to the Campus Industrial sector of Springfield including the Liberty
Professional Center.
Conclusion: This proposal satisfies Criterion C.
D. Parking: Parking areas have been designed to: facilitate traffic safety and avoid congestion; provide
bicycle and pedestrian connectivity within the property and to nearby transit stops and public areas.
The Preliminary Master Plan shall also comply with all applicable vehicular and bicycle parking
standards specified in SDC Chapter 4.
Finding 5: The applicant is not proposing to modify the vehicle and pedestrian circulation pattern adopted in
the Liberty Professional Center Master Plan. Additionally, the applicant is not proposing to modify any off-site
vehicle and pedestrian facilities.
Conclusion: This proposal satisfies Criterion D.
E. Ingress-Egress: Ingress-egress points have been designed to: facilitate traffic safety and avoid
congestion; provide bicycle and pedestrian connectivity within the property and to adjacent residential
areas, transit stops, neighborhood activity centers, and commercial, industrial and public areas; and
minimize driveways on arterial and collector streets as specified in this Code or other applicable City
and State regulations. The Preliminary Master Plan shall also comply with all applicable ingress/egress
standards specified in SDC Chapter 4.
Finding 6: The applicant is not proposing to modify the locations of identified ingress-egress points to serve
the Liberty Professional Center. The primary site ingress-egress points established in the Liberty Professional
Center Master Plan include a shared full-access driveway on Corporate Way, and two shared full-access
driveways on International Way. The Master Plan also contemplates a right-in/right-out driveway at the
southeast corner of Lot 5.
Finding 7: Staff has recently approved a Tentative Site Plan for a corporate office building on Lot 5 (Case
TYP212-00009), and the applicant proposes to install a three-quarters driveway at the southeast corner of Lot 5.
Staff supports installation of the three-quarters driveway provided there is appropriate measures to prevent left-
turns out of the site. Because this is a site-specific and conditional change to the right-in/right-out driveway,
the applicant is not required to change the Final Master Plan diagram to acknowledge this modification.
Conclusion: This proposal satisfies Criterion E.
TYPI 12-00035 Final Master Plan Modification Page 3 of 5
• O
F. Availability of Public Utilities: Existing public utilities, including, but not limited to, water, electricity,
wastewater facilities and stormwater management facilities either have sufficient capacity to support the
proposed development in all future phases adequately, or there will be sufficient capacity available by
the time each phase of development is completed. The Public Works Director or appropriate utility
provider shall determine capacity issues. The Preliminary Master Plan shall also comply with applicable
utility standards specified in SDC Chapters 4 and 5.
Finding 8: The applicant is not proposing to modify the public and private utility scheme for the Liberty
Professional Center. The existing public utility infrastructure on the periphery of the Master Plan area has
adequate capacity to serve the anticipated development on the site. As development progresses in the Master
Plan area, the developer(s) will be responsible for extending public water lines to serve Lots 1, 3 and 5 as
depicted in the Utility Plan (Diagram #5). The developer(s) also will be responsible for installing connections
to the available public water, storm sewer and sanitary sewer lines as generally depicted on Master Plan
Diagram #5.
Conclusion: This proposal satisfies Criterion F.
G. Protection of Physical Features: Physical features, including, but not limited,,to slopes 15 percent or
greater with unstable soil or geologic conditions, areas with susceptibility to flooding, significant clusters
of trees and shrubs,watercourses shown on the Water Quality Limited Watercourses (WQLW) Map and
their associated riparian areas,wetlands, rock outcroppings and open spaces and areas of historic and/or
archaeological significance as may be specified in Section 3.3-900 or ORS 97.740-760, 358.905-955 and
390.235-240 shall be protected as specified in this Code or in State or Federal law. The Preliminary
Master Plan shall also comply with applicable physical feature protection standards specified in SDC
Chapter 4.
Finding 9: At the time of initial Master Plan review and approval in 2007, it was determined there were no
notable natural or historic features on the site. Therefore, the proposed modification will not change the status
of natural and historic features.
Conclusion: This proposal satisfies Criterion G.
H. Phasing Plan: The Phasing Plan shall: demonstrate that the construction of required public facilities
shall occur in a logical sequence, either in conjunction with, or prior to each phase, or that there are
appropriate financial guarantees as specified in Subsection 5.13-120.M to ensure the phased public
facilities construction will occur.
Finding 10: The applicant is proposing to modify the phasing plan approved with the Liberty Professional
Center Master Plan in 2007. The initial phase was anticipated to be on Lot 3 at the northeast corner of the
development area, and Site Plan approval was granted for a corporate office building on this property. Soon
after the initial site preparation, rough grading and utility connection work was initiated the project was
abandoned. The applicant is now proposing to develop Phase I on Lot 5 at the southeast corner of the Master
Plan area and to have the other four lots within the Liberty Professional Center develop as a later phase.
Finding 11: With the proposed change of phasing schedule the developer of Lot 5 will be responsible for
extending the joint access driveway serving Lots 3, 4 and 5 from International Way to a point at or near the
north property line of Lot 5. Additionally, the developer of Lot 5 will need to ensure the utility connections
serving Lot 3 are installed to a point at or near the north property line of Lot 5. In the Tentative Site Plan
submittal for the corporate office building on Lot 5 (Case TYP212-00009), the applicant indicates the sanitary
sewer line for Lot 3 has already been installed along the west edge of the site. Because it has been about five
years since the utility installation work was done, the applicant is required by the land use decision to verify the
presence and acceptable condition of the sanitary sewer line. Should the sanitary sewer line be missing or in
poor repair the applicant will be responsible for installing the line as shown on the site plan (see Staff Report&
Decision for Case TYP212-00009, Condition#3).
TYP112-00035 Final Master Plan Modification Page 4 of 5
. • o
Finding 12: In accordance with SDC 5.13-I33.C.I, Master Plans are valid for a period of not more than seven
(7) years unless modified or extended. The Liberty Professional Center Master Plan was approved July 17,
2007 and is set to expire on July 17, 2014.
Finding 13: The applicant is proposing to extend the timetable for Master Plan phasing completion by more
than five years to December 31, 2019. Staff assumes the applicant's phasing schedule discussed in Finding I of
the project narrative uses calendar year 2013 as Year I and calendar year 2019 as Year 7. The Master Plan is
therefore proposed to be extended to December 31, 2019.
Finding 14: In accordance with SDC 5.13-135.A.3, a Final Master Plan may be extended by up to three (3)
years from the original date of expiry using the Type I modification process. Extending the phasing schedule
more than three years requires a Type II Modification process in accordance with SDC 5.13-I35.B.9.
Therefore,the proposed phasing timetable can be extended by a maximum of three years to July 27, 2017.
CONDITION OF APPROVAL:
1. The Liberty Professional Center Final Master Plan phasing schedule and development timing shall
be modified to specify an expiration date of July 27,2017. .
Conclusion: As conditioned herein, this proposal satisfies Criterion H.
I. Adjacent Use Protection: The proposed Preliminary Master Plan contains design elements including,
but not limited to landscaping/screening, parking/traffic management, and multi-modal transportation
that limit and/or mitigate identified conflicts between the site and adjacent uses.
Finding 15: The applicant is not proposing to modify the provisions for protection of adjacent uses with this
application. The Liberty Professional Center Master Plan currently provides for on-site vehicle and pedestrian
circulation; parking and cross-access between lots within the development area; landscaping and screening of
parking lot areas; and connections to the local transportation network and public transit facilities. Design
guidelines for building appearance and site landscaping are also incorporated into the Master Plan as Appendix
1. It is expected the Master Plan area will remain compatible with existing Campus Industrial sites in the
vicinity.
Conclusion: This proposal satisfies Criterion I.
SUMMARY OF CONDITIONS OF APPROVAL:
1. The Liberty Professional Center Final Master Plan phasing schedule and development timing shall be
modified to specify an expiration date of July 27,2017.
WHAT NEEDS TO BE DONE
The applicant shall provide three (3) copies of the Modified Final Master Plan within 90 days of the date of this
letter(ie. by March 14,2013).
If you have any questions please contact the undersigned at(541) 726-3784 or alimbird @springfield-or.gov.
PREPARED B�:
A y Limbird
Senior Planner
TYP 112-00035 Final Master Plan Modification Page 5 of 5
I o .
•
.
CITY OF SPRINGFIELD
. DEVELOPMENT SERVICES DEPARTMENT
225 5th ST
. SPRINGFIELD,OR 97477
A._....+ice..... -:.:. ... :
Garfield Associates
PO Box 529
Eugene, OR 97440
•
CITY OF SPRINGFIELD
DEVELOPMENT SERVICES DEPARTMENT
225 5th ST
SPRINGFIELD,OR 97477
Dan Giustina .•
Giustina Resources •
PO Box 529
Eugene, OR 97440 '
.
CITY OF.SPRINGFIELD •
DEVELOPMENT SERVICES DEPARTMENT
225 5th ST
SPRINGFIELD, OR 97477
�..,
pp Scott Stolarczyk, AIA
p Robertson Sherwood Architects PC
sit 132 E Broadway, Suite 540
7 a
•
�
' Eugene, OR 97401 ' . .
_ _
. .
_ . ,
. . .
.. .
. .
. ,. . .