Loading...
HomeMy WebLinkAboutNotes, Meeting PLANNER 11/9/2012 City of Springfield Development Services Department SPRINGFIELD 225 Fifth Street Springfield, OR 97477 IL FINAL MASTER PLAN MODIFICATION `% PRE-SUBMITTAL CHECKLIST OREGON Project Name: Liberty Professional Center Final Master Plan Modification Project Proposal: Modify the Phasing Plan and Extend Development Timetable for the Liberty Professional Center Master Plan Case Number: PRE12-00018 Project Address: 200 International Way Assessors Map and Tax Lot Number(s): Map 17-03-15-40, Tax Lots 3600 Zoning: Campus Industrial (CI) Overlay District(s): Floodplain (FP) Drinking Water Protection (DWP) Applicable Refinement Plan: Gateway Refinement Plan Designation: Special Light Industrial (SLI) Metro Plan Designation: Campus Industrial (CI) Pre-Submittal Meeting Date: November 9, 2012 Application Submittal Deadline: May 8, 2013 Associated Applications: LRP2007-00020 (Liberty Professional Center Master Plan); TYP212-00009 (Site Plan Review for Lot 5) POSITION REVIEW OF NAME Project Planner Land Use Planning Andy Limbird 726-3784 Transportation Planning Engineer Transportation Michael Liebler 736-1034 Public Works Civil Engineer Utilities, Sanitary & Storm Clayton McEachern 736-1036 Sewer Deputy Fire Marshal Fire and Life Safety Gilbert Gordon 726-2293 Building Official Building David Bowlsby 736-1029 APPLICANT'S DEVELOPMENT REVIEW'TEAIN , , _ Architect Applicant Scott Stolarczyk Connie Speck Robertson Sherwood Architects PC Giustina Resources 132 East Broadway, Suite 540 388 Pearl Street Eugene, OR 97401 P.O. Box 529 Eugene, OR 97440 Revised 11/8/12 11:n Rece�MRN [Opole, P lanner. • • FINAL MASTER PLAN MODIFICATION PRE-SUBMITTAL CHECKLIST PLANNING o Application fee - discuss the applicable fees o Copy of the Master Plan Area reduced to 81/z"x 11" Complete Incomplete See Planning Note(s) Comment 8 1/2" x 11" Copy of Master Plan Area o Copy of the deed and a preliminary title report issued within the past 30 days documenting ownership and listing all encumbrances. If the applicant is not the property owner, written permission from the property owner is required. Complete Incomplete See Planning Note(s) Deed and Preliminary Title Report o Project narrative explaining the purpose of the modification(s) to the Final Master Plan, the status of existing development within the Master Plan Area (if any), and any additional information that may have a bearing in determining the action to be taken. The narrative should also include a list of all proposed modifications to the Final Master Plan to determine if the application will be processed under Type I, Type II, or Type III procedures. Complete Incomplete See Planning Note(s) Project Narrative o Final Master Plan Phasing and Timeline Where applicable, the Final Master Plan Modification application must include a new phasing plan indicating any proposed modifications to the approved phasing plan, including the boundaries and sequencing of each phase. Phasing must progress in a sequence promoting street connectivity between the various phases of the development and accommodating other required public improvements, including but not limited to, sanitary sewer, stormwater management, water, and electricity. The applicant must indicate which phases apply to the Final Master Plan Modification being submitted. If the applicant is requesting to extend the Final Master Plan timeline, they must indicate which phases are affected and shall provide a revised phasing schedule up to the maximum limit allowable by SDC 5.13-135.B.9. Complete Incomplete See Planning Note(s) g Modified Phasing Plan 3i. Modified Master Plan Timeline Revised 11/08/12 • • o Modified Final Master Plan The Modified Final Master Plan must incorporate any proposed changes to the required elements of the Final Master Plan, including the plan area boundary; zoning, plan designation and listed uses; placement and appearance of principal buildings; public and private utilities; streets and transportation system capacity; site access, vehicle circulation and parking; landscaping; stormwater management; and protection of natural resources. Complete Incomplete See Planning Note(s) C Prepared by an Oregon Licensed Architect, Landscape Architect, or Engineer Not proposed Proposed modification to timing and/or scope of required public improvements Not proposed Proposed modification to zoning, plan designation or discretionary use mi Proposed modification to public and/or private utilities plan including location, timing, and sizing EZI Q N/A Proposed modification to incorporate newly adopted State or Federal regulations Proposed modification to public and/or private streets including changes to alignment, timing of construction, and connectivity Not proposed Proposed modification to traffic patterns, including increase to number of PM peak- hour vehicle trips Proposed modification to location and/or number of parking spaces Q N/A Proposed modification to number and/or location of residential dwelling units or overall dwelling unit density ® Q Proposed modification to principal buildings: quantity, location, height, footprint, size (gross floor area in relation to original Master Plan approval), setbacks from property lines, and distance between buildings Not proposed Proposed modification to site design guidelines Q Not proposed Proposed modification to location, dimensions or other characteristics of the landscaping scheme Revised 11/08/12 r • • Planning Notes: 1. Application appears complete for the purpose of a Type I Final Master Plan Modification. Additional comments not related to the completeness of the application: Revised 11/08/12 FINAL MASTER PLAN MODIFICATION PRE-SUBMITTAL CHECKLIST Engineer: Clayton McEachern Case#: PRE12-00018 PUBLIC WORKS ENGINEERING o Site Assessment of Existing Conditions Complete Incomplete See PW Note(s) Prepared by an Oregon licensed Landscape Architect or Engineer Vicinity Map N El The name, location, and dimensions of all existing site features including buildings, curb cuts, trees and impervious surface areas, clearly indicating what is remaining and what is being removed. For existing structures to remain, also indicate present use, size, setbacks from property lines, and distance between buildings The name, location, dimensions, direction of flow and top of bank of all watercourses and required riparian setback that are shown on the Water Quality Limited Watercourse Map on file in the Development Services Department [ZI Ell The 100-year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision N El The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development Services Department N 0 Physical features including, but not limited to trees 5" in diameter or greater when measured 4 /2 feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands, and rock outcroppings Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high water table Revised 10/25/07 • • o Improvement and Public Utilities Plan must be in compliance with the regulations of SDC Sections 5.17-100, 4.1-100, 4.2-100, and 4.3-100 and must include the following information: Complete Incomplete See PW Note(s) Q Prepared by an Oregon licensed Civil Engineer Location and width of all existing and proposed easements Location of existing and required power poles, transformers, neighborhood mailbox units, and similar public facilities 0 Location and size of existing and proposed utilities on and adjacent to the site, including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points o Grading and Paving Plan Complete Incomplete See PW Note(s) Q Prepared by an Oregon licensed Civil Engineer Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of the stormwater management system Roof drainage patterns and discharge locations Pervious and impervious area drainage patterns n/a The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater quality measures; and natural drainageways to be retained Q n/a Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) 2 L n/a Amount of proposed cut and fill • o Stormwater Management System Study - provide four (4) copies of the study with the completed Stormwater Scoping Sheet attached. The plan, calculations, and documentation must be consistent with the Engineering Design Standards and Procedures Manual. Complete Incomplete See PW Note(s) Q n/a Scoping Sheet and attached Stormwater Management System Study Revised 10/25/07 • PW Notes: 1. Master plan amendment appears to have all relevant material provided. Additional comments not related to the completeness of the application: • Lot 3 was originally planned to be the first development on the site and all infrastructure installed to serve lot 3 with the remaining lots using that built infrastructure for their respective developments. Since this was not done, lot 5 will need to construct the required infrastructure for the future lot 3 development. The only item that may need construction at this time is the future sanitary sewer lateral line in the shared driveway on the western side of lot. 5. The concurrent site plan submittal for development of lot 5 shows this line as existing currently. The existence and functioning (or construction) of this line will need to be verified prior to construction of the shared access driveway to prevent unnecessary disruption to the site and pavement at a future time. If necessary, this construction can be done as part of the overall building (plumbing in this case) permit and does not require a PIP. • Revised 10/25/07 • • • TENTATIVE MASTER PLAN AMENDMENT APPLICATION PRE-SUBMITTAL CHECKLIST Transportation Engineer/Planner: Michael Liebler Case#: PRE12-00018 Applicant: Giustina Resources TRANSPORTATION o Ingress/Egress Adjustments - information analysis and/or justification for adjustment of access points laid out in approved Final Master Plan. Complete Incomplete See Transportation Note(s) (1) o Traffic Impact -an increase of 10 percent or greater to the PM peak traffic related to the approved Final Master Plan requires a traffic impact analysis. Complete Incomplete See Transportation Note(s) NA Traffic Impact Study o Parking Impact - an increase of 10 percent or greater to the parking supply related to the approved Final Master Plan requires a parking impact study. Complete Incomplete See Transportation Note(s) NA Parking Impact Study o Internal Street Adjustment - if the applicant proposes to alter the placement of interior streets by 10 percent or greater from their approved location, then documentation is required for this request with modifications maintaining connectivity established by the approved Final Master Plan. Complete Incomplete See Transportation Note(s) NA Documentation of proposed adjustment of internal streets. Revised 10/25/07 Transportation Notes: 1. Applicant is proposing to change the right-in/right-out eastern access onto International way to a three quarters access restricting only left turns out of the access. This adjustment is supported by city staff and will be allowed as part of the site plan approval process. Additional comments not related to the completeness of the application: • • • Revised 10/25/07 • I • THIS APPLICATION IS: ® COMPLETE FOR PROCESSING ❑ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE City Planner Date This is not a decision on your application. Springfield Development Code Section 5.4- 105 and Oregon Revised Statutes 227:178 require the City take final action on a limited land use decision within 120 days after the application is deemed complete. The 120-day processing period for this application begins when all the missing information is submitted or when you request that the City proceed without the information. You must indicate by either signing this form or by submitting a written response to the City within seven days of the date of this form asserting your intentions regarding the provision of the missing information. If you indicate herein or in your written response that the missing information will be submitted, then you have 180 days from the date the application was submitted for Pre- Submittal Review to provide the City with the missing information. If you refuse to submit the missing information, then upon receipt of the full application packet and processing fee, the City will deem the application complete for purposes of starting the 120-day clock and begin processing the application. No new information may be submitted after the start of the 120-day period unless accompanied by a request for an extension of the 120-day processing time. Upon receipt of a request for extension, the City may extend the 120-day period for a reasonable period of time. The City may also require additional fees if the new information is submitted after the Notification to Surrounding Property Owners is sent out and a second notification is required or if the new information substantially affects the application proposal and additional review is required. • I, the owner/applicant, intend to submit all missing items indicated herein to the City within the 180-day timeline. .Sim ✓ a I 'Z Ow rAppli Si.G "re Date Revised 10/25/07