Loading...
HomeMy WebLinkAboutCorrespondence SUB 5/1/2013 . 05/01/2013 14: 18 FAX 7477348 WSC FAX EJ 001/002 • • • See SPRINGFIELD UTILITY BOARD \v TCR sCR\-ICC CC NTCR 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subutil.corn April 17, 2013 Andy Limbird City of Springfield 225 N. 5th Street Springfield, OR 97477 Dear Andy: SUBJECT: DEVELOPMENT ISSUES MTG ANNEXATION#PRE13-00011 ROTH& ROTH LLC 17-03-34-42 TL 100, 1500, 1600, 1700, 1800, 1900, 2000, 2100 4006 Franklin Blvd; 206, 210, 220, 266 N Concord Ave + vacant lots Listed below are our comments for the above referenced development proposal: 1. The proposed development is currently within the service territory of the Glenwood Water District and will be served by GWD until annexation to the City of Springfield and withdrawal from GWD,at which time SUB will become the water service provider. The existing Glenwood Water District system serving the proposed annexation area does not have adequate capacity to provide water service for significant redevelopment of the proposed area. The Springfield Utility Board (SUB) has a 16" water transmission pipeline along the south side of Franklin Blvd which has the capacity to provide service to any development proposed in the annexation area. Extension of service from this pipeline will require cutting across Franklin Blvd. 2. All new water system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-of-way at a location and depth of bury that meets the standards of Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workmanship shall be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB Water Division and the long-range needs of the City. These needs include, but are S:\SITEPIAN\4006 Franklin Blvd annexation development Issues 4-17-2013.docx Date Received: s/frti Planner: AL . 05/01/2013 14: 18 FAX 7477348 W'SC. FAX 2002/002 1 . • not limited to, meterrocation and access, sizes of water distril ion and transmission lines,pumping facilities, and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials and construction standards, detailed costs for installing SUB water facilities, and a schedule of construction.. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation, and joint trench opportunities. 7. All water meters will be placed in public right-of-way at a location identified by the developer. Each lot or parcel must have its own water service. • 8. Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges will be those in effect at the time water service is requested. 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products,fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. 10. Backflow prevention devices will be required for new water services in the annexation area. Contact Scott Higley at 726-2396 for technical assistance after reviewing the requirements. Scott can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation.. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. Sincerely, ce )/1 Bart E. McKee, P.E. Senior Civil Engineer- Water Division cc: Steve and Paul Roth, Roth& Roth LLC, 4006 Franklin Blvd, Eugene, OR 97403-2346 Richard M. Satre, Schirmer Satre Group, 375 West 4w Ave, Eugene, OR 97401 S:\SITEPIAN\4006 Franklin Blvd annexation development Issues 4-17-2013.docx Date Received: s aoi Planner: AL