Loading...
HomeMy WebLinkAboutBuilding Specifications 2013-4- (2) • Sr�1 Page 1 of 1 • TESTING&INSPECTION,INC. Geotedlnlcal&COnstrucbonServioes Daily Field Report Client: Mr. Steve Schilling Project: Momentive Phenol Tank Date: 04-08-13 Advanced Mechanical, Inc. 470 S. 2nd Street Project No.: 2137046 34777 Hwy. 228 Springfield, Oregon Report No.: E-33605 PO Box 397 Inspector: A. Fenstermacher Brownsville, Oregon 97327 ID No.: 5258882-49 ICC Inspection of: Reinforced Concrete Weather: Showers Continuous Inspection: ❑ Contractor: Advanced Mechanical BP No.: -- Periodic Inspection: Performed inspection on the reinforcing steel for phenol tank walls. Reinforcing steel was checked for size, grade, laps, quantities, locations, ties, clearance and supports. Observed the placement of 10.5 yards of Eugene Sand and Gravel 4500 psi concrete (mix 314545). Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" compressive strength cylinders. Slump — 5"; concrete temperature—64F; air temperature—48F; air content—3.7%. To the best of our knowledge, the work inspected was in accordance with plans dated 02-22-13 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: Michael L. Mey Technical Manager c: Pillar Engineering—John Evans(email) • City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing 8 Inspection,Inc.'s written authorization. 7W NM(Cara Avenue•Corvalas,Oregon 97330 phone(541)757-0699 fax(541)7572991 29540 B Airpat Road Eugene,Oregon 97402•phone(541)684-3849•fax(541)6843851 62979 NE Plateau Drive,Suite 3 Bend,Oregon 97701 •phone(541)382-4844•fax(541)382-4846 •