Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2013-4- 5 PKZOl2-00?38 Page 1 of 1 Cirtl TESTING&INSPFCfION INC Geotedmical&c«,sm,cnon Daily Field Report Client: Ms. Laura Farthing Project: Hayden Bridge Water Date: 04-09-13 EWEB Intake Improvements Project No.: 2127278 PO Box 10148 Springfield, Oregon Report No.: E-33618 Eugene, Oregon 97440 Inspector: A. Fenstermacher ID No.: 5258882-49 ICC Inspection of: Reinforced Concrete Weather: Clear Continuous Inspection: ❑ Contractor: John Hyland Construction BP No.: -- Periodic Inspection: 2 Performed final inspection on the reinforcing steel for valve vault walls. A preliminary reinforcing steel inspection was performed on 03-14-13(ref: FEI report E-33467). Observed the placement of 9.5 yards of Knife River 4000 psi concrete (mix 45K170L0) in walls noted above except north and northwest corner walls. Concrete was placed by pump and was mechanically consolidated. ' Cast one (1) set of four (4) 4" x 8" compressive strength cylinders. Notified Dave Shaw (JHC) of the on-site test results. Slump—3 1/2"; concrete temperature—63F; air temperature—48F; air content—4.5%. To the best of our knowledge, the work inspected was in accordance with plans dated 04/2012 and applicable workmanship provisions of the I.B.C., except if noted above. . Reviewed By: Michael L. M er Technical Manager c: John Hyland Construction—Dave Shaw(email) ' OBEC—Pete Slocum (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing&Inspection,Inc.'s written authorization. 750 NW Cornell Avenue-Corvallis,Oregon 97330•phone(541)757-4698•fax(541)7571991 29540 B Airport Road•Eugene,Oregon 97402•phone(541)6843849•fax(541)684-3851 62979 NE Plateau Drive,Suite 3-Bend,Oregon 97701 •phone(541)3824844•fax(541)382-4846