HomeMy WebLinkAboutMiscellaneous Compliance Report 2013-4- (2) 7409 SW Tech Center Dr.Ste. 145
Tigard,OR.97223
S^rar Ph:503-443-3799 Fax:503-620-2748
CVCAETE DAILY FIELD REPORT FOR STRUCTURAL WELDING AND BOLTING
OILS
TESTING.. INC
503.443.3799 Date: 4/12/13 ACS Job# 13-4262-D00 Permitf: 811-2013-02250
SPRINGFIELD BUFFALO WILD WING
DLA CONSTRUCTION SERVICES,LLC
Continuous 12 Periodic ❑ 2770 GATEWAY ST
871 CANTERBURY RD UNIT G
WEST LAKE,0H 44145 AWS D1.1 0 AWS D1.4 E SPRINGFIELD,OR 97477
AWS D1.5 n ASME n JOB 412086
AWS D1.3
CI OTHER:
INSPECTOR/CERT Bob Brown Cert#OBOA 393
Reviewed prior inspection reports: n Yes ig No n NA IS THIS A REINSPECTION?: ❑ Yes No
OA Manual Reviewed: 0 Yes n N• o n NA
Type of weld(s)
MTR's Randomly reviewed: 0 Yes n No ❑ NA
WPS verified: [✓I Yes n N• o n NA ❑ GROOVE WELD FILLET WELD Q FLARE BEVELED WELD
Welder Certification Verified: ig Yes n N• o n NA
Welders:
Assembly of weld joints acceptable: Is/I Yes ❑ No n NA
On file
Approved plans available: ig Yes n N• o n NA IS THERE AN RFI? n Yes IN No
Electrodes meet specification: 0 Yes ❑ No n NA RFI ATTACHED? n Yes Q No
Piece marks noted are acceptable per approved plans
HIGH STRENGTH BOLTS Q NA n &specifcations,not all work completed at end of shift.
BOLT TYPE A 325 n A 490 n A 307 n (mark only if applicable)
BOLT SIZE: X BOLT SIZE: X
Welds acceptable per approved plans
BOLT TYPE A 325 ❑ A490 El A307 ❑ &sped cations: 0 Yes n No
BOLT SIZE: X BOLT SIZE: X Fab Shop PORTABLE WELDING & MORE ❑ NA
BOLT TYPE A325 ❑ A490 ❑ A307 n INSPECTION DETAILS:
BOLT SIZE: X BOLT SIZE: X
At fab shop for visual inspection of 3/16'and 1/4"welds on approved drawing
Bolts tested with Skidmore-Wilhelm n Yes n No ri NA for column 11/5402,12/5402, base plates 16/5301.
Bolt Tension Machine: Beam to column 16/401,H55 column 11/5402,Base and top plates 7 pieces on
BOLT INSTALLATION METHOD 17A and 1 piece on 17B,meets minimum requirements of AWS D 1.1.
TURN OF NUT n CALIBRATED WRENCH n
DTI METHOD ❑ DELAYED VERIFICATION
LEJUNNE ❑ SNUG TIGHT I I
NON-DESTRUCTIVE TESTING
UT TESTING PERFORMED? n Yes ❑ No 0 NA •
MT TESTING PERFORMED? n Yes ❑ No [3,:i NA
PT TESTING PERFORMED? n Yes C No C NA
Foreman notified of n Yes n No n NA
nonconformance items?
Foremans Name:
Reviewed j Date: cc: Brad Sisk,Kim Anderson,Robert Castile
/� 04/15/2013
Bob Brown, President APR 1 5 2013
BB/BB ‘:ato
ACCREDITED