Loading...
HomeMy WebLinkAboutItem 06 Proposed Cell Tower Amendments to the Springfield Development Code AGENDA ITEM SUMMARY Meeting Date: 4/15/2013 Meeting Type:Regular Meeting Staff Contact/Dept.: Mark Metzger Staff Phone No: 541-726-3775 Estimated Time: Consent Calendar S P R I N G F I E L D C I T Y C O U N C I L Council Goals: Mandate ITEM TITLE: PROPOSED CELL TOWER AMENDMENTS TO THE SPRINGFIELD DEVELOPMENT CODE ACTION REQUESTED: Conduct a second reading and adopt the following ordinance: AN ORDINANCE AMENDING THE SPRINGFIELD DEVELOPMENT CODE SECTION 4.3-145—WIRELESS TELECOMMUNICATIONS SYSTEMS FACILITIES; AND CERTAIN TERMS FOUND IN SECTION 6.1-110—MEANING OF SPECIFIC WORDS AND TERMS, WHICH APPLY TO WIRELESS TELECOMMUNICATIONS SYSTEMS FACILITIES; ADOPTING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE. ISSUE STATEMENT: Staff has prepared a package of amendments to SDC Section 4.3-145 which address Council concerns with the City’s siting and design standards for WTS facilities and particularly cell towers. ATTACHMENTS: 1. Adopting Ordinance with Staff Report DISCUSSION/ FINANCIAL IMPACT: On April 1, 2013 Council conducted a first reading and a public hearing concerning an ordinance amending SDC Section 4.3-145 and SDC 6.1-110. Attachment 1 is the Adopting Ordinance containing the proposed amendments to SDC Section 4.3-145 of the Springfield. The amended section replaces the existing SDC Section 4.3-145. This proposal also amends SDC Section 6.1-110; relocating terms specific to WTS facilities to the amended SDC Section 4.3-145E. The Staff Report (incorporated into the Adopting Ordinance as Exhibit A) examines the proposed amendments for their consistency with the approval criteria for Development Code amendments found in SDC Section 5.6-115 and provides a factual basis for decision making. Ordinance No.______________    AN ORDINANCE AMENDING THE SPRINGFIELD DEVELOPMENT CODE SECTION 4.3‐145—WIRELESS  TELECOMMUNICATIONS SYSTEMS FACILITIES; AND CERTAIN TERMS FOUND IN SECTION 6.1‐110— MEANING OF SPECIFIC WORDS AND TERMS, WHICH APPLY TO WIRELESS TELECOMMUNICATIONS  SYSTEMS FACILITIES; ADOPTING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE.    WHEREAS, the Council of the City of Springfield (Council) adopted Ordinance No. 5849 on March 17th  1997 which added standards and definitions to the Springfield Development Code (SDC) to regulate and  to establish a review process for the development of Wireless Telecommunications Systems (WTS)  Facilities.      WHEREAS, SDC Section 4.3‐145 contains the standards and processes to be applied to the development  of WTS facilities; and SDC Section 6.1‐110 contains definitions of specific words and terms that are used  in SDC Section 4.3‐125; and    WHEREAS, SDC Section 4.3‐145 G indicates that the provisions of this section were intended to be  reviewed and updated to ensure “contemporaneity with technological changes made in this industry.”    WHEREAS, the Council met in work session on March 22, 2012 to discuss concerns about the siting of  certain WTS facilities under the existing standards found in SDC 4.3‐145; and    WHEREAS, the Council met in work session on October 22, 2012 to consider measures presented by staff  to address the concerns identified at the March 22, 2012 meeting; and directed staff to develop  amendments to the SDC to implement those measures; and    WHEREAS, Section 5.6 ‐100 of the SDC sets forth procedures for the amendment of this document; and    WHEREAS, the Springfield Planning Commission met in work session on February 5, 2013 to discuss  Council’s concerns about WTS siting standards and the proposed amendments to SDC Section 4.3‐145  and SDC Section 6.1‐110 developed by staff to address those concerns; and    WHEREAS, the Springfield Planning Commission conducted a public hearing concerning the proposed  amendments to SDC Section 4.3‐145 and SDC Section 6.1‐110 on February 19, 2013, and voted  unanimously to recommend approval of the amendments to Council.  The Planning Commission  recommendation to the Council is based upon findings set forth in the Staff Report and on the evidence  and testimony in the record; and    WHEREAS, the Council conducted a public hearing concerning the proposed amendments to SDC Section  4.3‐145 and SDC Section 6.1‐110 on April 1, 2013;      WHEREAS, on April 15, 2013, the Springfield Common Council conducted a second reading of the  ordinance and is now ready to take action on this application based upon findings in support of adoption  of these SDC amendments as set forth in the aforementioned Staff Report incorporated herein by as  Exhibit A and the evidence and testimony already in the record as well as the evidence and testimony  presented a this public hearing held in the matter of adopting this Ordinance.    Attachment 1, Page 1 of 33    NOW, THEREFORE, based on the foregoing recitals, the Council of the City of Springfield does ordain as  follows:      Section 1.  SDC Section 4.3‐145 is amended to read as follows:    Section 4.3‐145 Wireless Telecommunications System (WTS) Facilities     A.  Purpose. This Section is intended to:    1. Implement the requirements of the Federal Telecommunications Act of 1996;      2. Provide a uniform and comprehensive set of standards and review procedures for the  placement, operation, alteration and removal of WTS facilities;      3. Allow new WTS facilities where necessary to provide service coverage and there is a  demonstrated need that cannot be met through existing facilities;      4. Maximize the use of existing WTS facilities in order to minimize the need to construct  additional facilities;    5. Encourage the siting of new WTS facilities in preferred locations;     6. Lessen impacts of new WTS facilities on surrounding residential areas; and     7. Minimize visual impacts of new WTS facilities through careful design, configuration,  screening, and innovative camouflaging techniques.    B.  Applicability/Conflicts.      1. Applicability.  This Section applies within Springfield’s city limits and its Urban Services  Area.  No WTS facility may be constructed, altered (to include co‐locations) or replaced,  unless exempt, without complying with the requirements of this Section. Exempt  facilities are listed in Subsection D below.    2. Conflicts. In cases where:    a. The development standards of this Section conflict with other Sections of this  Code, these standards will prevail.     EXCEPTION: In the Glenwood Riverfront, the WTS standards regarding type and  height of the antenna will apply. All other aspects of the application submittal  and review process specified in this Section will apply.     b. These development standards conflict with Federal and/or State regulations, the  Federal and/or State regulations will prevail.    C. Pre‐existing WTS Facilities.     Attachment 1, Page 2 of 33    1. WTS facilities that lawfully existed prior to the adoption of this Ordinance shall be  allowed to continue their use as they presently exist.     2. Routine maintenance will be permitted on lawful pre‐existing WTS facilities as specified  in Subsection 4.3‐145D.1.     3. Lawfully existing WTS facilities may be replaced as specified in Subsection 4.3‐145D.2.      D.  Exemptions. The following shall be considered exempt structures or activities under, however,  all other applicable Federal, State and City permits will be required:    1.  Emergency or routine repairs or routine maintenance of previously approved WTS  facilities.    2.  Replacement of existing previously approved WTS facilities.     a. A WTS facility may be replaced if it:    i. Is in the exact location of the facility being replaced;    ii. Is of a construction type identical in height, size, lighting and painting;    iii. Can accommodate the co‐location of additional antennas or arrays;    iv. Does not increase radio frequency emissions from any source; and     v. Does not intrude or cause further intrusion into a setback area.     b. Those WTS facilities that cannot meet the replacement standard in Subsection  4.3‐145D.2.a. will be treated as new construction, requiring Type I or III review as  specified in Subsection 4.3‐145H.    3. Industrial, scientific and medical equipment operating at frequencies designated for that  purpose by the Federal Communications Commission.    4. Essential public telecommunications services ‐ military, Federal, State, and local  government telecommunications facilities.    5. Amateur and citizen band radio transmitters and antennas.    6. Military or civilian radar operating within the regulated frequency ranges for the  purpose of defense or aircraft safety.     7. Antennas (including, but not limited to: direct‐to‐home satellite dishes;, TV antennas;  and wireless cable antennas) used by viewers to receive video programming signals  from direct broadcast facilities, broadband radio service providers, and TV broadcast  stations.    Attachment 1, Page 3 of 33    8.  Low‐powered networked telecommunications facilities including, but not limited to  microcell radio transceivers located on existing utility poles and light standards within  public right‐of‐way.      9.  Cell on Wheels (COW), which are permitted as temporary uses in nonresidential Metro  Plan or 2030 Springfield Refinement Plan designations for a period not to exceed 14  days, or during a period of emergency as declared by the City, County, or State.    E. Definitions. The words and phrases used in this Section shall have the following meanings:    Approval Authority.       1. Type I Review. Staff has the authority to approve new co‐locations, equipment replacement,  and applications for low visibility and stealth WTS facilities.    2. Type III Review. The Planning Commission and the City Council are the Approval Authority for  applications to construct high and medium visibility WTS facilities within the city limits.        3. Type III Review. The Hearings Official, by agreement with Lane County, is the Approval  Authority for high and medium visibility WTS facilities located outside the city limits but  within the Springfield Urban Growth Boundary.       Antenna.  Any system of wires, poles, rods, reflecting discs or similar devices designed for  telephonic, radio, facsimile, data, or television telecommunications through sending and/or  receiving of electromagnetic waves when the system is either external to or attached to the  exterior of a structure. Antennas include, but are not limited to:, devices having active elements  extending in any direction;, and directional beam‐type arrays having elements carried by and  disposed from a generally horizontal boom that may be mounted up and rotated through a  vertical mast or tower interconnecting the boom and antenna support. All of the latter elements  are part of the antenna.    Antenna height. The vertical distance measured from the ground surface at grade to the tip of  the highest point of the antenna on the proposed structure.    Antenna support. Any pole, telescoping mast, tower, tripod or any other structure that supports  a device used in the transmitting and/or receiving of electromagnetic waves.    Camouflaged. Any WTS facility that is designed to blend into the surrounding environment.  Examples of camouflaged facilities include, but are not limited to: architecturally screened roof‐ mounted antennas; building‐mounted antennas painted to match the existing structure;  antennas integrated into architectural elements; towers made to look like trees; and antenna  support structures designed to look like flag poles or light poles.    Carrier.  A company authorized by the FCC to build and/or operate a WTS facility.    Co‐location. The use of a single WTS tower for the placement of multiple antennas or related  telecommunications equipment often involving different carriers.    Attachment 1, Page 4 of 33    Equipment building, shelter or cabinet. A cabinet or building used to house associated  equipment used by providers at a WTS facility. Associated equipment includes, but is not limited  to: air conditioning; and emergency generators.     Façade mounted antenna. An antenna architecturally integrated into the façade of a building or  structure.    Facility.  A WTS facility.    Faux tree. A WTS tower camouflaged to resemble a tree.    Guyed tower.  A WTS tower that is supported, in whole or in part, by guy wires and ground  anchors.    High visibility.   The following WTS facilities are examples of high visibility facilities:    1.  Monopoles, lattice towers and guyed towers.    2.  Any WTS facilities that do not meet the definition of stealth, low visibility, or moderate  visibility.    Lattice tower. A guyed or self‐supporting three or four sided, open, steel frame support  structure used to support WTS equipment.    Low visibility. The following are examples of low visibility WTS facilities that shall not exceed the  height limit of the base zone and shall not increase the height of an existing WTS facility:    1.  Whip antennas not exceeding 6 feet in length or height, including mounting, and measuring  no more than 3 inches in diameter, located on existing structures including, but not limited  to, water storage tanks, high‐voltage transmission towers, utility towers and poles, sign  standards, and roadway overpasses, with equipment cabinets that are screened from view.    2.  Facilities, including equipment cabinets that are screened from view through the use of  architectural treatments, including, but not limited to: cupolas; steeples; and parapets; and  are consistent with existing development on adjacent properties.    3.  Additions to existing permitted low‐visibility facilities, if the additions themselves meet the  definition of low visibility and are designed to minimize visibility the WTS facility.    4.  Changes to an existing building that are consistent with the building’s architectural style and  the equipment cabinets are not visible.    Maintenance.  Emergency or routine repairs or replacement of transmitters, antennas, or other  components of previously approved WTS facilities that do not create a significant change in  visual appearance or visual impact.    Microcells.  These devices provide additional coverage and capacity where there are high  numbers of users within urban and suburban macrocells. The antennas for microcells are  Attachment 1, Page 5 of 33    mounted at street level, typically on the external walls of existing structures, lamp‐posts, and  other street furniture. Microcell antennas are usually smaller than macrocell antennas, and  when mounted on existing structures, can often blend into building features. Microcells provide  radio coverage over distances, typically between 100 meters and 1,000 meters, and operate at  power levels substantially below those of macrocells.    Moderate visibility. The following WTS facilities are examples of moderate visibility facilities:    1.  Panel‐shaped antennas not exceeding 8 feet in length or height that are flush‐mounted to an  existing building façade or other existing structure on at least one edge, or extend a  maximum of 24 inches from the building façade or other structure at any edge, do not  exceed the height of the building or other structure, and are designed to blend with the  color, texture, and design of the existing building or structure, with equipment cabinets that  are screened from view.    2.  WTS facilities that are camouflaged, including, but not limited to: faux trees; flag poles; and  light poles, provided that the equipment building, shelter, or cabinet for the facility is  screened or camouflaged.    Monopole. A WTS facility consisting of a single pole constructed for purposes of supporting one  or more antennas without guy wires or ground anchors.    Panel or directional antenna. An antenna or array of antennas designed to concentrate a radio  signal in a particular area.     Residential Zoning District.  Any Springfield zoning district where single‐family and or multi‐ family dwelling units are intended to be the dominate land use.    RF. Radio Frequency.    Roof mounted antenna. Any antenna with its support structure placed directly on the roof of  any building or structure.    Screened. Concealed from view with a sight obscuring fence, wall or vegetation.    Service area. The area served by a single WTS facility.    Side‐mounted antennas. Those antennas that are mounted on the side of a tower structure at  any height, and including both the antennas and equipment with protective radome coatings.  This term also includes microwave dish antennas, solid or not, located at 150 feet or lower on a  tower structure, regardless of the dish diameter. The term does not include solid microwave  dish antennas exceeding 6 feet in diameter that are located above 150 feet on a tower  structure.    Small top‐mounted antennas. Any antenna mounted on the top of a tower structure where the  antenna is 20 feet or less in height and 6 inches or less in outside diameter.    Attachment 1, Page 6 of 33    Speculation tower. An antenna support structure designed for the purpose of providing location  mounts for WTS facilities, without a binding written commitment or executed lease from a  service provider to utilize or lease space on the tower at the time the application is submitted.    Stealth. WTS facilities including, but not limited to: microcells; antennas; equipment cabinets;  and any other ancillary equipment that cannot be seen from any street or any adjacent  property, improved or unimproved, and that do not result in any apparent architectural changes  or additions to existing buildings. The addition of landscaping, walls, fences, or grading as  screening techniques does not make an otherwise visible WTS facility a stealth facility.    Telecommunications. The transmission, between or among points specified by the user, of  information of the user’s choosing, without change in the form or content of the information as  sent and received.    Tower or WTS tower. Any mast, pole, monopole, guyed tower, lattice tower, free standing  tower, or other structure designed and primarily used to support antennas.  Whip antenna means an antenna that transmits or receives signals in 360 degrees. Whip  antennas are typically cylindrical in shape, less than 3 inches in diameter and no more than 6  feet long, including the mounting.    Wireless Telecommunications System (WTS) facility. Any facility that transmits and/or receives  electromagnetic waves, including, but not limited to, antennas, dish antennas, microwave  antennas, and other types of equipment for the transmission or receipt of these signals,  including, but not limited to:  telecommunications towers and similar supporting structures;  equipment cabinets or buildings; parking areas; and other accessory development. This  definition also includes any facility that transmits radio or television signals. This definition does  not apply to Amateur Radio Stations as defined by the Federal Communications Commission,  Part 97 of the Commission’s Rules.    F. General Standards.  The Federal Telecommunications Act of 1996 establishes limitations on the  siting standards that local governments can place on WTS facilities.  Section 704 of the Act  states that local siting standards shall not:     1) “unreasonably discriminate among providers of functionally equivalent services”     2)  “prohibit or have the effect of prohibiting the provision of personal wireless services.”    All applications for WTS facilities are subject to the standards in this section to the extent that  they do not violate federal limitations on local siting standards.  Where application of the  standards found in this section constitutes a violation, the least intrusive alternative for  providing coverage shall be allowed as an exception to the standards.    1. Design for Co‐location. All new towers shall be designed to structurally accommodate  the maximum number of additional users technically practicable.    2. Demonstrated Need for New WTS Facilities. Applications shall demonstrate that the  proposed WTS facility is necessary to close a significant gap in service coverage or  capacity for the carrier and is the least intrusive means to close the significant gap.   Attachment 1, Page 7 of 33      3. Lack of Coverage and Lack of Capacity. The application shall demonstrate that the gap in  service cannot be closed by upgrading other existing facilities.  In doing so, evidence  shall clearly support a conclusion that the gap results from a lack of coverage and not a  lack of capacity to achieve adequate service. If the proposed WTS facility is to improve  capacity, evidence shall further justify why other methods for improving service capacity  are not reasonable, available or effective.     4. Identify the Least Intrusive Alternative for Providing Coverage. The application shall  demonstrate a good faith effort to identify and evaluate less intrusive alternatives,  including, but not limited to: less sensitive sites; alternative design systems; alternative  tower designs; the use of repeaters; or multiple facilities. Subsection 5 defines the type  of WTS facilities that are allowed in each zoning district.    5.  Location of WTS Facilities by Type.  Subsection 4.3‐145 E. defines various types of WTS  facilities by their visual impact.  These are: high visibility, moderate visibility, low  visibility and stealth facilities.  Table 4.3‐1 lists the type of WTS facilities allowed in each  of Springfield’s zoning districts.       Table 4.3‐1    Zoning Districts  Types Allowed  Special Heavy Industrial  Heavy Industrial  Light‐Medium Industrial  Quarry Mining Operations  High visibility  Moderate visibility  Low visibility  Stealth  Zoning Districts  Types Allowed  Community Commercial  Campus Industrial  Booth Kelly Mixed Use   Major Retail Commercial  Mixed Use Employment  Mixed Use Commercial  Medical Service     Low visibility  Moderate visibility  Stealth    Zoning Districts Types Allowed  Neighborhood Commercial  General Office  Low Density Residential  Medium Density Residential  High Density Residential   Mixed Use Residential  Public Land and Open Space    Low visibility  Stealth             6.  Maximum Number of High Visibility WTS Facilities.  No more than one high visibility  facility is allowed on any one lot/parcel.   Attachment 1, Page 8 of 33      EXCEPTION: The Approval Authority may approve exceeding the maximum number of  high visibility facilities per lot/parcel if one of the following findings is made:     a.  Co‐location of additional high visibility facilities is consistent with neighborhood  character,     b.   The provider has shown that denial of an application for additional high visibility  WTS facilities would have the effect of prohibiting service because the proposed  facility would fill a significant gap in coverage and no alternative locations are  available and technologically feasible, or     c.  The provider has shown that denial of an application for additional high visibility  WTS facilities would unreasonably discriminate among providers of functionally  equivalent services.     7. Separation between Towers.  No new WTS tower may be installed closer than 2,000 feet  from any existing or proposed tower unless supporting findings can be made under  Subsections 4.3‐145F.2., 3. and 4 by the Approval Authority.      8.  WTS Facilities Adjacent to Residentially Zoned Property.  In order to ensure public  safety, all towers located on or adjacent to any residential zoning district shall be set  back from all residential property lines by a distance at least equal to the height of the  facility, including any antennas or other appurtenances. The setback shall be measured  from that part of the WTS tower that is closest to the neighboring residentially zoned  property.    9.  Historic buildings and structures. No WTS facility shall be allowed on any building or  structure, or in any district, that is listed on any Federal, State or local historic register  unless a finding is made by the Approval Authority that the proposed facility will have  no adverse effect on the appearance of the building, structure, or district. No change in  architecture and no high or moderate visibility WTS facilities are permitted on any  building or any site within a historic district.  Proposed WTS facilities in the Historic  Overlay District are also subject to the applicable provisions of Section 3.3‐900.    10.  Equipment Location. The following location standards shall apply to WTS facilities:    a. No WTS facility shall be located in a front, rear, or side yard building setback in  any base zone and no portion of any antenna array shall extend beyond the  property lines.     b. Where there is no building, the WTS facility shall be located at least 30 feet from  a property line abutting a street.     c. For guyed WTS towers, all guy anchors shall be located at least 50 feet from all  property lines.    Attachment 1, Page 9 of 33    11.  Tower Height. Towers may exceed the height limits otherwise provided for in this Code.  However, all towers greater than the height limit of the base zone shall require  Discretionary Use approval through a Type III review process, subject to the approval  criteria specified in Subsection 4.3‐145 I.    12.  Accessory Building Size. All accessory buildings and structures built to contain  equipment accessory to a WTS facility shall not exceed 12 feet in height unless a greater  height is necessary and required by a condition of approval to maximize architectural  integration. Each accessory building or structure located on any residential or Public  Land and Open Space zoned property is limited to 200 square feet, unless approved  through the Discretionary Use process.    13.  Visual Impact. All WTS facilities shall be designed to minimize the visual impact to the  greatest extent practicable by means of placement, screening, landscaping, and  camouflage. All facilities shall also be designed to be compatible with existing  architectural elements, building materials, and other site characteristics. The applicant  shall use the least visible antennas reasonably available to accomplish the coverage  objectives. All high visibility and moderate visibility facilities shall be sited in a manner to  cause the least detriment to the viewshed of abutting properties, neighboring  properties, and distant properties.    14.  Minimize Visibility.  Colors and materials for WTS facilities shall be non‐reflective and  chosen to minimize visibility.  Facilities, including support equipment and buildings, shall  be painted or textured using colors to match or blend with the primary background,  unless required by any other applicable law.    15.  Camouflaged Facilities.  All camouflaged WTS facilities shall be designed to visually and  operationally blend into the surrounding area in a manner consistent with existing  development on adjacent properties. The facility shall also be appropriate for the  specific site. In other words, it shall not "stand out" from its surrounding environment.    16.  Façade‐Mounted Antenna. Facade‐mounted antennas shall be architecturally integrated  into the building design and otherwise made as unobtrusive as possible. If possible,  antennas shall be located entirely within an existing or newly created architectural  feature so as to be completely screened from view. Facade‐mounted antennas shall not  extend more than 2 feet out from the building face.    17.  Roof Mounted Antenna.  Roof mounted antennas shall be constructed at the minimum  height possible to serve the operator's service area and shall be set back as far from the  building edge as possible or otherwise screened to minimize visibility from the public  right‐of‐way and adjacent properties.    18.  Compliance with Photo Simulations. As a condition of approval and prior to final staff  inspection of the WTS facility, the applicant shall submit evidence, e.g. photos, sufficient  to prove that the facility is in substantial conformance with photo simulations provided  with the initial application. Non‐conformance shall require any necessary modification  to achieve compliance within 90 days of notifying the applicant.    Attachment 1, Page 10 of 33    19.  Noise.  Noise from any equipment supporting the WTS facility shall comply with the  regulations specified in OAR 340‐035‐0035.      20.  Signage.  No signs, striping, graphics, or other attention‐getting devices are permitted  on any WTS facility except for warning and safety signage that shall:    a. Have a surface area of no more than 3 square feet;     b. Be affixed to a fence or equipment cabinet; and     c. Be limited to no more than two signs, unless more are required by any other  applicable law.    21.  Traffic Obstruction. Maintenance vehicles servicing WTS facilities located in the public or  private right‐of‐way shall not park on the traveled way or in a manner that obstructs  traffic.    22.  Parking.  No net loss in required on‐site parking spaces shall occur as a result of the  installation of any WTS facility.    23.  Sidewalks and Pathways. Cabinets and other equipment shall not impair pedestrian use  of sidewalks or other pedestrian paths or bikeways on public or private land.    24.  Lighting. WTS facilities shall not include any beacon lights or strobe lights, unless  required by the Federal Aviation Administration (FAA) or other applicable authority. If  beacon lights or strobe lights are required, the Approval Authority shall review any  available alternatives and approve the design with the least visual impact. All other site  lighting for security and maintenance purposes shall be shielded and directed  downward, and shall comply with the outdoor lighting standards in Section 4.5‐100,  unless required by any other applicable law.    25.  Landscaping.  For WTS facilities with towers that exceed the height limitations of the  base zone, at least one row of evergreen trees or shrubs, not less than 4 feet high at the  time of planting, and spaced out not more than 15 feet apart, shall be provided in the  landscape setback. Shrubs shall be of a variety that can be expected to grow to form a  continuous hedge at least 5 feet in height within 2 years of planting. Trees and shrubs in  the vicinity of guy wires shall be of a kind that would not exceed 20 feet in height or  would not affect the stability of the guys. In all other cases, the landscaping, screening  and fence standards specified in Section 4.4‐100 shall apply.     26. Prohibited WTS Facilities.     a. Any high or moderate visibility WTS facility in the Historic Overlay District.     Attachment 1, Page 11 of 33    b. Any WTS facility in the public right‐of‐way that severely limits access to abutting  property, which limits public access or use of the sidewalk, or which constitutes  a vision clearance violation.     c. Any detached WTS facility taller than 150 feet above finished grade at the base  of the tower.    27.  Speculation. No application shall be accepted or approved for a speculation WTS tower,  i.e., from an applicant that simply constructs towers and leases tower space to service  carriers, but is not a service carrier, unless the applicant submits a binding written  commitment or executed lease from a service carrier to utilize or lease space on the  tower.    G. Application Submittal Requirements. All applications for a WTS facility shall provide the  following reports, documents or documentation:    1. Submittal Requirements for Low Visibility and Stealth Facilities (Type I review). All  applications for low visibility and stealth WTS facilities shall submit the following reports  and documentation:    a.  Narrative. The application shall include a written narrative that describes in  detail all of the equipment and components proposed to be part of the WTS  facility, including, but not limited to: towers; antennas and arrays; equipment  cabinets; back‐up generators; air conditioning units; lighting; landscaping, and  fencing.     b. Geographic Service Area. The applicant shall identify the geographic service area  for the proposed WTS facility, including a map showing all of the applicant’s and  any other existing sites in the local service network associated with the gap the  facility is meant to close. The applicant shall describe how this service area fits  into and is necessary for the service provider’s service network.    The service area map for the proposed WTS facility shall include the following:    i. The area of significant gap in the existing coverage area;    ii. The service area to be effected by the proposed WTS facility;    iii. The locations of existing WTS tower facilities where co‐location is  possible within a 5 mile radius of the proposed WTS facility.       e. Co‐location.  An engineer’s analysis/report of the recommended site location  area is required for the proposed WTS facility. If an existing structure approved  for co‐location is within the area recommended by the engineer’s report,  reasons for not collocating shall be provided demonstrating at least one of the  following deficiencies:     Attachment 1, Page 12 of 33    i. The structure is not of sufficient height to meet engineering  requirements;     ii. The structure is not of sufficient structural strength to  accommodate the WTS facility, or there is a lack of space on all  suitable existing towers to locate proposed antennas.    iii. Electromagnetic interference for one or both WTS facilities will  result from co‐location; or     iv. The radio frequency coverage objective cannot be adequately  met.     f. Plot Plan.  A plot plan showing: the lease area; antenna structure; height above  grade and setback from property lines; equipment shelters and setback from  property lines; access; the connection point with the land line system; and all  landscape areas intended to screen the WTS facility.     h. RF Emissions.  An engineer’s statement that the RF emissions at grade, or at  nearest habitable space when attached to an existing structure, complies with  FCC rules for these emissions; the cumulative RF emissions if co‐located. Provide  the RF range in megahertz and the wattage output of the equipment     i. Description of Service.  A description of the type of service offered including, but  not limited to: voice; data; and video, and the consumer receiving equipment.     j. Provider Information.  Identification of the provider and backhaul provider, if  different.     m. Zoning and Comprehensive Plan Designation.  Provide the zoning and applicable  comprehensive plan (e.g. Metro Plan, 2030 Springfield Refinement Plan)  designation of the proposed site and the surrounding properties within 500  feet.       n. FCC, FAA or Other Required Licenses and Determinations.  Provide a copy of all  pertinent submittals to the FCC, FAA or other State or Federal agencies including  environmental assessments and impact statements, and data, assumptions,  calculations, and measurements relating to RF emissions safety standards.    2. Submittal Requirements for Moderate and High Visibility Facilities (Type III review).   Applications for moderate and high visibility WTS facilities shall require all of the  required materials for low visibility and stealth WTS facilities specified in Subsection 4.3‐ 145G.1.  In addition to the applicable Site Plan and Discretionary Use application  requirements, WTS applications shall require the applicant to address the following:     Attachment 1, Page 13 of 33    a. Height. Provide an engineer’s diagram showing the height of the WTS facility  and all of its visible components, including the number and types of antennas  that can be accommodated. Carriers shall provide evidence that establishes that  the proposed WTS facilities are designed to the minimum height required from  a technological standpoint to meet the carrier’s coverage objectives. If the WTS  facility tower height will exceed the height restrictions of the applicable base  zone, the narrative shall include a discussion of the physical constraints, e.g.,  topographical features, making the additional height necessary.  The narrative  shall include consideration of the possibility for design alternatives, including  the use of multiple sites or microcell technology that would avoid the need for  the additional height for the proposed WTS facility.    b. Construction. Describe the anticipated construction techniques and timeframe  for construction or installation of the WTS facility to include all temporary  staging and the type of vehicles and equipment to be used.    c.  Maintenance. Describe the anticipated maintenance and monitoring program  for the antennas, back‐up equipment, and landscaping.    d.  Noise/Acoustical Information. Provide the manufacturer’s specifications for all  noise‐generating equipment including, but not limited to air conditioning units  and back‐up generators, and a depiction of the equipment location in relation to  abutting properties.    e.  Landscaping and Screening. Discuss how the proposed landscaping and  screening materials will screen the site at maturity.    f.  Co‐location. In addition to the co‐location requirements specified in Subsection  4.3‐145G.1.e., the applicant shall submit a statement from an Oregon registered  engineer certifying that the proposed WTS facility and  tower, as designed and  built, will accommodate co‐locations, and that the facility complies with the  non‐ionizing electromagnetic radiation emission standards as specified by the  FCC. The applicant shall also submit:    i. A letter stating the applicant’s willingness to allow other carriers to co‐ locate on the proposed facilities wherever technically and economically  feasible and aesthetically desirable;     ii. A copy of the original Site Plan for the approved existing WTS facility  updated to reflect current and proposed conditions on the site; and    iii. A depiction of the existing WTS facility showing the proposed placement  of the co‐located antenna and associated equipment. The depiction  shall note the height, color and physical arrangement of the antenna  and equipment.    Attachment 1, Page 14 of 33    g.  Lease. If the site is to be leased, a copy of the proposed or existing lease  agreement authorizing development and operation of the proposed WTS  facility.     h. Legal Access.  The applicant shall provide copies of existing or proposed  easements, access permits and/or grants of right‐of‐way necessary to provide  lawful access to and from the site to a City street or a State highway.    i.  Lighting and Marking. Any proposed lighting and marking of the WTS facility,  including any required by the FAA.    j. Utilities.  Utility and service lines for proposed WTS facilities shall be placed  under ground.      k. Alternative Site Analysis.  The applicant shall include an analysis of alternative  sites and technological design options for the WTS facility within and outside of  the City that are capable of meeting the same service objectives as the  proposed site with an equivalent or lesser visual or aesthetic impact. If a new  tower is proposed, the applicant shall demonstrate the need for a new tower,  and why alternative locations and design alternatives, or alternative  technologies including, but not limited to microcells and signal repeaters,  cannot be used to meet the identified service objectives.    l.  Visual Impact Study and Photo Simulations. The applicant shall provide a visual  impact analysis showing the maximum silhouette, viewshed analysis, color and  finish palette, and screening for all components of the proposed WTS facility.  The analysis shall include photo simulations and other information necessary to  determine visual impact of the facility as seen from multiple directions. The  applicant shall include a map showing where the photos were taken.     3. Independent Consultation Report.     a. Review and approval of WTS facilities depends on highly specialized scientific  and engineering expertise not ordinarily available to Springfield staff or to  residents who may be adversely impacted by the proposed development of  these facilities. Therefore, in order to allow the Approval Authority to make an  informed decision on a proposed WTS facility, the Director may require the  applicant to fund an independent consultation report for all new Moderate and  High visibility facilities.   The consultation shall be performed by a qualified  professional with expertise pertinent to the scope of the service requested.    b. The scope of the independent consultation shall focus on the applicant’s  alternatives analysis.  The consultant will evaluate conclusions of applicant’s  analysis to determine if there are alternative locations or technologies that were  not considered or which could be employed to reduce the service gap but with  less visual or aesthetic impact.  There may be circumstances where this scope  may vary but the overall objective shall be to verify that the applicant’s proposal  is safe and is the least impactful alternative for closing the service gap.   Attachment 1, Page 15 of 33      c. The applicant shall be informed of the Director’s decision about the need for an  independent consultation at the time of the Pre‐Submittal Meeting that is  required under Section 5.1‐120 (C).  It is anticipated that the independent  consultation will be required when the applicant proposes to locate a Moderate  or High visibility WTS facility in a residential zoning district or within 500 feet of  a residential zoning district.  Other instances where a proposed WTS facility may  have a visual or aesthetic impact on sensitive neighborhoods could also prompt  the Director to require an independent consultation.      H. Review Process.  The review process is determined by the type of WTS facility or activity that is  proposed.  High or moderate visibility WTS facilities, defined in Subsection 4.3‐145E., require  Type III Planning Commission or Hearings Official review.  Low visibility or stealth facilities, and  the co‐location of new equipment of existing facilities are allowed under a Type I staff review  with applicable building or electrical permits.  Routine equipment repair and maintenance do  not require planning review; however, applicable building and electrical permits are required.    1. Development Issues Meeting.  A Development Issues Meeting (DIM) as specified in  Subsection 5.1‐120(A.) is required only for high and moderate visibility WTS facility  applications.  Applicable development standards as specified in Subsection 4.3‐145F.  and submittal requirements as specified in Subsection 4.3‐145G., will be discussed at  the DIM.       2.  Type I Review Process. The following WTS facilities are allowed with the approval of the  Director with applicable building and electrical permits:    a.  Stealth and low visibility WTS facilities, as defined in Subsection 4.3‐145E., in  any zoning district.     b.   Façade mounted antennas or low powered networked telecommunications  facilities, e.g., as those employing microcell antennas integrated into the  architecture of an existing building in a manner that no change to the  architecture is apparent and no part of the WTS facility is visible to public view.    c.  Antennas or arrays that are hidden from public view through the use of  architectural treatments, e.g., within a cupola, steeple, or parapet which is  consistent with the applicable building height limitation.    d.  New antennas or arrays including side‐mounted antennas and small top‐ mounted antennas that are attached to an existing broadcast communication  facility located in any zone.  No more than three small top‐mounted antennas  shall be placed on the top of any one facility without a Type III review.    e. To minimize adverse visual impacts associated with the proliferation and  clustering of towers, co‐location of antennas or arrays on existing towers shall  take precedence over the construction of new towers, provided the co‐location  is accomplished in a manner consistent with the following:  Attachment 1, Page 16 of 33      i.  An existing tower may be modified or rebuilt to a taller height to  accommodate the co‐location of additional antennas or arrays, as long  as the modified or rebuilt tower will not exceed the height limit of the  applicable zoning district. Proposals to increase the height of a tower in  a residential zoning district, or within 500 feet of a residential zoning  district shall be reviewed under a Type III process.  The height change  may only occur one time per tower.    ii.  An existing tower that is modified or reconstructed to accommodate the  co‐ location of additional antennas or arrays shall be of the same tower  type and reconstructed in the exact same location as the existing tower.     f.  WTS facilities proposed within the public right‐of‐way on an existing utility or  light pole in any zoning district, so long as they meet all of the following:    i.  The antennas do not project more than 24 inches above the existing  utility pole support structure;    ii.  No more than a total of 2 antennas or antenna arrays are located on a  single pole; and    iii.  The equipment cabinet is no larger than 6 cubic feet and is concealed  from public view by burying or screening by means other than walls or  fences.    g. Co‐location of antennas or arrays on existing WTS facilities.    h. The Director will use the applicable criteria specified in Subsection 4.3‐145 I. to  evaluate the proposal.    3.  Type III Review Process. The Planning Commission or Hearings Official review and  approve a Discretionary Use application and a concurrently processed Site Plan Review  application for the following WTS facilities:      a. High visibility and moderate visibility WTS facilities.      b. All other locations and situations not specified in Subsections 4.3‐145H. 2. and  3.      c. The Planning Commission or Hearings Official will use the applicable criteria  specified in Subsection 4.3‐145 I. in place of the Discretionary Use criteria in  Section 5.9‐120 to evaluate the proposal.      4. Council Notification and Possible Review.      a. A briefing memorandum shall be prepared and submitted to the City Council  upon receipt of an application for a High or Moderate visibility or any other WTS  Attachment 1, Page 17 of 33    facility subject to review by the Planning Commission.  By action of the City  Council, an application for a facility proposed within the city limits may be  elevated for direct City Council review.  In those instances where an application  is elevated for direct review, the City Council shall be the Approval Authority  and will use the applicable criteria specified in Subsection 4.3‐145 I. in place of  the Discretionary Use criteria in Section 5.9‐120 to evaluate the proposal.      b. By agreement with Lane County, the Hearings Official shall be the Approval  Authority for applications outside of the city limits but inside of the Springfield  Urban Growth Boundary. The Hearings Official will use the applicable criteria  specified in Subsection 4.3‐145 I. in place of the Discretionary Use criteria in  Section 5.9‐120 to evaluate the proposal.        I.  Approval Criteria.     1. Low Visibility and Stealth WTS Facility Applications.  The Director shall approve the low  visibility and stealth WTS facility applications upon a determination that the applicable  standards specified in Subsection 4.3‐145F. and the submittal requirements specified in  Subsection 4.3‐145G. are met.    2. Moderate and High Visibility WTS Facility Applications.  The Approval Authority shall  approve moderate visibility and high visibility WTS facility applications upon a  determination that the applicable standards specified in Subsection 4.3‐145F. and the  submittal requirements specified in Subsection 4.3‐145G. are met.   Through the  Discretionary Use review, the Approval Authority shall also determine if there are any  impacts of the proposed WTS facility on adjacent properties and on the public that can  be mitigated through application of other Springfield Development Code standards or  conditions of approval as specified in Subsection 4.3‐145J.       J.  Conditions of Approval. For Type III applications, the Approval Authority may impose any  reasonable conditions deemed necessary to achieve compliance with the approval criteria as  allowed by SDC Section 5.9‐125.    K. Maintenance. The property owner and the carrier in charge of the WTS facility and tower shall  maintain all equipment and structures, landscaping, driveways and mitigating measures as  approved.  Additionally:    1.  All WTS facilities shall maintain compliance with current RF emission standards of the  FCC, the National Electric Safety Code, and all State and local regulations.    2.  All equipment cabinets shall display a legible operator’s contact number for reporting  maintenance problems.    L.  Inspections.    1.  The City shall have the authority to enter onto the property upon which a WTS facility is  located to inspect the facility for the purpose of determining whether it complies with  Attachment 1, Page 18 of 33    the Building Code and all other construction standards provided by the City and Federal  and State law.    2.  The City reserves the right to conduct inspections at any time, upon reasonable notice  to the WTS facility owner. In the event the inspection results in a determination that  violation of applicable construction and maintenance standards established by the City  has occurred, remedy of the violation may include cost recovery for all City costs  incurred in confirming and processing the violation.      M. Abandonment or Discontinuation of Use. The following requirements apply to the abandonment  and/or discontinuation of use for all WTS facilities:    1.  All WTS facilities located on a utility pole shall be promptly removed at the operator’s  expense at any time a utility is scheduled to be placed underground or otherwise  moved.    2.  All operators who intend to abandon or discontinue the use of any WTS facility shall  notify the City of their intentions no less than 60 days prior to the final day of use.    3.  WTS facilities shall be considered abandoned 90 days following the final day of use or  operation.    4.  All abandoned WTS facilities shall be physically removed by the service provider and/or  property owner no more than 90 days following the final day of use or of determination  that the facility has been abandoned, whichever occurs first.    5.  The City reserves the right to remove any WTS facilities that are abandoned for more  than 90 days at the expense of the facility owner.    6.  Any abandoned site shall be restored to its natural or former condition. Grading and  landscaping in good condition may remain.    N. Review of WTS Facilities Standards. In the event that the Federal or State government adopts  mandatory or advisory standards more stringent than those described in this Section, staff will  prepare a report and recommendation for the City Council with recommendations on any  necessary amendments to the City’s adopted standards.      Section 2. SDC Section 6.1‐110 is amended to remove the following terms.    Acceptable Site  Antenna  Attached WTS Facility  Collocation  Conditionally Suitable Site  Detached WTS Facility  Equipment Shelters  Attachment 1, Page 19 of 33    Lattice Tower  Monopole  Preferred Site  Stealth Design  Wireless Telecommunications Facilities     The definition for “Wireless Telecommunication System” in 6.1‐110 is amended to read as  follows:      Wireless Telecommunications Systems (WTS). The sending and receiving of radio frequency  transmissions and the connection and/or relaying of these signals to land lines and other sending and  receiving stations (cell sites), and including cellular radiotelephone, personal communications services,  enhanced/specialized mobile radio, and commercial paging services.  Terms and definitions associated  with WTS facilities, and the standards that regulate their siting and design are found in SDC Section 4.3‐ 145 E.     Section 3.  If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any  reason held invalid or unconstitutional by a court of competent jurisdiction, such portion shall be  deemed separate, distinct and independent provision and such holding shall not affect the validity of the  remaining portions thereof.  Section 4.  Notwithstanding the effective date of ordinances as provided by Section 2.110 of the  Springfield Municipal Code 1997, this ordinance shall become effective 30 days from the date of passage  by the City Council and approval by the Mayor, or upon the date of acknowledgement as provided in  ORS 197.625, whichever date is later.     ADOPTED by the Common Council of the City of Springfield this _______ day of _______________2013  by a vote of ____for and ____ against.        APPROVED by the Mayor of the City of Springfield this ____ day of ___________________ 2013.              ____________________________________________        Mayor      ATTEST:    _______________________________________  City Recorder       Attachment 1, Page 20 of 33    Type IV Amendment to the Springfield Development Code Staff Report   Project Name:  Amendment to the Springfield Development Code replacing SDC 4.3‐145—Wireless  Telecommunication System (WTS) Facilities    Nature of Application: To replace SDC Section 4.3‐145 with a new policy section guiding the  development and maintenance of WTS facilities. The proposed replacement section updates  Springfield’s policies to address issues concerning placement, appearance and the approval process for  cell towers.       Case Number:  TYP412‐00001    Project Location:   City‐wide legislative action    Date of Initiation: December 28, 2013    Date of DLCD Notice of Proposed Amendment:  December 28, 2012    Date of Newspaper Notice:  February 1, 2013    Date of Mailed Notices:  February 7, 2013    I.  Executive Summary    Section 4.3‐145 G of the Springfield Development Code (SDC) states that the city’s WTS policies should  be periodically updated to ensure “contemporaneity with technological changes made in this industry.”    In March of 2012, staff met in work session with Council to discuss cell tower siting and related WTS  policies. A number of concerns were expressed by Council that required follow up action.      Staff prepared an assessment of SDC Section 4.3‐145 and recommended an approach to remedying  Council’s concerns.  These were presented to Council in an October 22, 2013 work session.  At the  October meeting, the Council approved the recommended remedies and asked staff to prepare  amendments to the Springfield Development Code to implement the approved remedies.      The proposed amendments to Section 4.3‐145 analyzed in this document respond to the direction given  by Council.  The amendments seek to implement the “remedies” discussed at the October 22nd meeting.      In preparing these amendments it was imperative that proposed changes comply with the approval  criteria for Development Code amendments found in SDC Section 5.6‐115.  These criteria state that in  “reaching a decision on these actions, the Planning Commission and the City Council shall adopt findings  which demonstrate conformance to the following: A) The Metro Plan; B) Applicable State statutes; and C)  Applicable State‐wide Planning Goals and Administrative Rules.”      Attachment 1, Page 21 of 33    This staff report is intended to provide a factual base for decision makers to rely upon in determining  whether the amendments conform to the decision criteria.  It is the opinion of staff that the findings  contained in this report provide a substantive basis for decision makers to make a determination that  these amendments conform to the decision criteria found in SDC Section 5.6‐115 for approving  Development Code amendments.    On February 20, 2013, the Planning Commission conducted a public hearing concerning the  amendments to Section 4.3‐145 and voted unanimously to recommend that Council approve the new  WTS policies.  No public comment was received at the hearing and no written comments were  received by staff.  In addition to the required newspaper notice of the hearing, mailed notice was sent  to all property owners with towers and all service providers who could be identified on existing  towers serving Springfield.     The State statutes and Administrative Rules mentioned in the approval criteria have little to say about  how communities regulate the location and appearance of WTS facilities.  The Federal  Telecommunication Act of 1996 (TCA) recognizes the right of local governments to regulate the siting of  WTS facilities to minimize the intrusion of the facilities on local neighborhoods.  The TCA placed certain  limits on those local siting standards (listed below).  Those limitations have shaped the proposed WTS  amendments.      The Telecommunications Act of 1996 (TCA) – The stated purpose of the TCA is to “promote competition  and reduce regulation in order to secure lower process and higher quality services for American  telecommunication consumers and encourage the rapid deployment of new telecommunications  technologies.” In carrying out this purpose, the TCA implements three important (but somewhat  competing) principles:     1) The siting of wireless telecommunications facilities must comply with local zoning and land use  regulations; and     2) Local jurisdictions must not unreasonably discriminate among providers of functionally equivalent  services but may distinguish applications based upon different visual, aesthetic and safety concerns;  and     3) The local regulations must not result in the actual or effective prohibition in the provision of  personal wireless services.     The staff report also demonstrates that the proposed amendments comply with the provisions of the  Federal Telecommunications Act of 1996 as they apply to the limitations placed on local jurisdictions  with respect to local siting standards.      As mentioned above, Council approved the remedies recommended for addressing its concerns with cell  tower siting and review and directed staff to prepare implementing amendments to Section 4.3‐145.   The proposed amendments to SDC 4.3‐145 implement the approach presented to Council.  The  proposed remedies represent a wholesale change in the review process and various additional  standards.  The nature of these changes prompted staff to replace Section 4.3‐145 rather than try to  surgically amend individual subsections of the existing code.      Attachment 1, Page 22 of 33    The remainder of this document analyzes the proposed amendment of Section 4.3‐145 of the Springfield  Development Code (SDC) with respect to the criteria for approving such amendments found in SDC  Section 5.6‐115.    III. Procedural Requirements    Procedural requirements for amending the Springfield Development Code (SDC) are described in  Sections 5.6‐100 and 5.1‐140 of the SDC.      SDC Section 5.6‐105 indicates that the Planning Director, Planning Commission, City Council or a  resident of the City can initiate amendments to the SDC.  Such amendments of are reviewed under a  “Type IV” procedure (Section 5.6‐110) and require public hearings before the Planning Commission and  the City Council.  Type IV procedures are detailed in Section 5.1‐140 of the SDC.  The proposed revision  to SDC Section 4.3‐145 was initiated by the Director.     SDC Section 5.2‐110 (B) requires that legislative land use decisions be advertised in a newspaper of  general circulation, providing information about the legislative action and the time, place and location of  the hearing.      Findings:    Finding #1. The City of Springfield initiated the proposed amendment to Section 4.3‐145.  The  amendment is not site‐specific and falls under the definition of a legislative action.     Finding #2. A “DLCD Notice Proposed Amendment” was e‐mailed with mailed copies following to  the Oregon Department of Land Conservation and Development (DLCD) on December  28, 2012 alerting the agency to the City’s intent to amend SDC Section 4.3‐145.   The  notice was mailed more than 35 days in advance of the first evidentiary hearing as  required by ORS 197.610 (1).   No comment has been received from the Department  concerning the amendments.    Finding #3. Notice of the public hearing concerning this matter was published on Thursday,  February 1, 2013 in the Register Guard, advertising the hearing before the Springfield  Planning Commission on February 19, 2013 and the Springfield City Council on April 1,  2013.  The content of the notice followed the direction given in Section 5.2‐115 of the  SDC for legislative actions.    Finding #4. Mailed notice was sent on February 7, 2013 to property owners where towers are  located and to providers, advertising the hearing before the Springfield Planning  Commission on February 20, 2013 and the Springfield City Council on April 1, 2013.  The  content of the notice followed the direction given in Section 5.2‐115 of the SDC for  legislative actions.    Finding #5. ORS 197.047(4) requires the local government to mail a notice to every landowner  whose property would be “rezoned” as a result of an amendment to planning policies  that would limit or prohibit land uses previously allowed in the affected zone.      Attachment 1, Page 23 of 33    Finding #6. The proposed amendments to the Springfield Development Code allow WTS facilities in  all zoning districts, as does the current policy.  New towers located in some zoning  districts or near (within 500 feet) of residential zoning districts may be required by the  amended policies to employ stealth measures to reduce the visual and aesthetic impacts  of these facilities.  Mailed notice to landowners is therefore not required under the  provisions of ORS 197.047(4).  Mailed notices to the owners of record for existing cell  tower facilities and representatives of cell tower providers who have submitted building  permit applications for collocation of new WTS facilities or the repair/replacement of  equipment on existing tower facilities were mailed on January 24, 2013.    Finding #7. On February 20, 2013, the Planning Commission conducted a public hearing concerning  the amendments to Section 4.3‐145 and voted unanimously to recommend that Council  approve the new WTS policies.  No public comment was received at the hearing and no  written comments were received by staff.  In addition to the required newspaper notice  of the hearing, mailed notice was sent to all property owners with towers and all service  providers who could be identified on existing towers serving Springfield.    Conclusion:    Procedural requirements described in Sections 5.6‐100 and 5.1‐140 of the SDC have been followed.   Notice requirements established by DLCD and the Oregon Revised Statutes for amending the  Development Code have also been followed.  IV. Decision Criteria and Findings    SDC Section 5.6‐115 describes the criteria to be used in approving an amendment to the SDC.  It states  that in reaching a decision, the Planning Commission and the City Council must adopt findings which  demonstrate conformance with “1) the Metro Plan; 2) applicable State statutes; and to 3) applicable  State‐wide Planning Goals and Administrative Rules.”    Criterion #1 “Conformance with the Metro Plan”    Findings:    Finding #6.   The Metro Plan does not address telecommunication facilities or cell towers specifically  as it does other urban infrastructure and services.  “Communication facilities” are briefly  mentioned a key urban service.  The Metro Plan Glossary defines “Key Urban Facilities  and Services” on page V3.  “Communication facilities” are listed among the “Minimum  level” Key Urban Services.    Finding #7. The Metro Plan supports the orderly and efficient extension of key urban services and  facilities.  Metro Plan Policy G.1 states: “Extend the minimum level and full range of key  urban facilities and services in an orderly and efficient manner consistent with the  growth management policies in Chapter II‐C, relevant policies in this chapter, and other  Metro Plan policies.” Pg. III‐G‐4    Finding #8. The Metro Plan places the cost of extending services on the developer.  Metro Plan  Policy G.36 states: “Require development to pay the cost, as determined by the local  Attachment 1, Page 24 of 33    jurisdiction, of extending urban services and facilities. This does not preclude subsidy,  where a development will fulfill goals and recommendations of the Metro Plan and  other applicable plans determined by the local jurisdiction to be of particular  importance or concern.”  Pg. III‐G‐15    Finding #9. The Metro Plan intends that both public and private facilities be designed and located to  in a way that minimizes their impact on neighborhoods.  Metro Plan Policy E.4 states:  “Public and private facilities shall be designed and located in a manner that preserves  and enhances desirable features of local and neighborhood areas and promotes their  sense of identity.” PG. III‐E‐3    Finding #10. The Metro Plan requires cities to address environmental design considerations in their  development regulations.  These design elements include aesthetics.  Regulations  should ensure that development is aesthetically compatible existing and anticipated  neighboring uses, particularly residential uses.  Metro Plan Policy E.6 states: “Local  jurisdictions shall carefully evaluate their development regulations to ensure that they  address environmental design considerations, such as, but not limited to, safety, crime  prevention, aesthetics, and compatibility with existing and anticipated adjacent uses  (particularly considering high and medium density development locating adjacent to low  density residential).” Pg. III‐E‐3    Finding #11. The Metro Plan intends that planning standards allow for flexibility and creative  solutions to design problems.  Metro Plan Policy E.8 states: “Site planning standards  developed by local jurisdictions shall allow for flexibility in design that will achieve site  planning objectives while allowing for creative solutions to design problems.” Pg. III‐E‐3    Finding #12. The focus of the proposed amendments to SDC Section 4.3‐145 is on facilitating the  location of needed WTS facilities while minimizing the visual and aesthetic impacts of  these facilities on nearby neighborhoods, particularly residential and certain commercial  zoning districts that are sensitive to these impacts.  This focus is described in the  Purpose statement found in Section 4.3‐145 (A), and is implemented through the  General Standards that are listed in Section 4.3‐145 (F).      Conclusion    While wireless telecommunication system facilities (i.e. cell towers) are not specifically mentioned,  communication facilities are is listed among those key urban services recognized by the Metro Plan.  The  Metro Plan intends that key services and facilities be extended in an orderly and efficient manner with  the developer bearing the cost.    The design and location of public and private facilities are intended to be sensitive to the impacts they  may have on neighborhoods.  Communities are required to include design elements in their  development regulations that will protect neighborhoods from the impacts of urban facilities which  include communications facilities.  These regulations should allow the developer a measure of flexibility  in addressing the impacts their facilities may have.    The proposed new Section 4.3‐145 provides for the extension of WTS facilities as needed to allow  wireless service coverage throughout the city.  In accordance with Federal law, needed wireless facilities  Attachment 1, Page 25 of 33    are not precluded from any zoning district.  Design measures are required to minimize the visual and  aesthetic impact of these facilities on residential and commercial areas in Springfield.  The new  standards offer protection without being overly prescriptive.      Stealth measures are required to locate high impact facilities like towers in sensitive neighborhoods.   The definition of “stealth” does not require a specific design approach, but instead allow the developer  to propose a design that mitigates anticipated impacts.  The effectiveness of the design in mitigating  impacts is the measure what is evaluated.      Based on the findings shown above, staff concludes the proposed amendments to SDC Section 4.3‐145  are consistent with the applicable portions of the Metro Plan.   Criterion #2 “Conformance with Applicable State Statutes”    Findings    Finding #13. Oregon Revised Statute Chapter 759—Telecommunications Utility Regulation is the  primary body of state law regulating telecommunications.   The chapter is focused on  the regulation of utility providers. No elements of this chapter limit local governments  from implementing zoning and construction standards for the siting of WTS facilities.      Finding #14. ORS 759.015—Legislative findings on universal telecommunications service, states that  “it is the goal of the State of Oregon to secure and maintain high‐quality universal  telecommunications service at just and reasonable rates for all classes of customers and  to encourage innovation within the industry by a balanced program of regulation and  competition. The Public Utility Commission shall administer the statutes with respect to  telecommunications rates and services in accordance with this policy. [Formerly  757.810]”    The proposed amendments to SDC Section 4.3‐145 do not interfere with the provision of high‐quality  telecommunications or with the state regulation of telecommunication providers by the Public Utility  Commission.      Finding #15. ORS 759.016—Legislative findings on broadband services, states:     (1) That it is the goal of this state to promote access to broadband services for all  Oregonians in order to improve the economy in Oregon, improve the quality of life in  Oregon communities and reduce the economic gap between Oregon communities that  have access to broadband digital applications and services and those that do not, for  both present and future generations; and    (2) That the goal set forth in subsection (1) of this section may be achieved by:     (a) Expanding broadband and other telecommunications services;    (b) Creating incentives to establish and expand broadband and other  telecommunications services;    (c) Undertaking telecommunications planning at the local, regional and state  Attachment 1, Page 26 of 33    levels that includes participants from both the public and the private sectors;    (d) Removing barriers to the full deployment of broadband digital applications  and services and providing incentives for the removal of those barriers; and    (e) Removing barriers to public‐private partnerships in areas where the private  sector cannot justify investments. [2003 c.775 §1]    Note: 759.016 was enacted into law by the Legislative Assembly but was not added to or  made a part of ORS chapter 759 or any series therein by legislative action. See Preface  to Oregon Revised Statutes for further explanation.    Finding #16. The proposed amendments to SDC Section 4.3‐145 do not conflict with the goals stated  in ORS 759.015 and 759.016.  The amendments seek to make wireless services available  to all areas of Springfield while minimizing the impact of WTS facilities on residential  neighborhoods and certain commercial areas that are sensitive to the visual impacts of  such facilities.  The siting standards found in Section 4.3‐145 F do not conflict with the  state telecommunications goals.    Finding #17. Criterion #2 is concerned with the conformance of the proposed amendments with  state laws.  It should be noted that while state law does not limit local governments  from establishing siting standards, the Federal Telecommunications Act of 1996  establishes some limitations on siting standards.  The Act does not “limit or affect the  authority of a State or local government or instrumentality thereof over decisions  regarding the placement, construction, and modification of personal wireless service  facilities” except for the following limitations:    ` (i) The regulation of the placement, construction, and modification of personal wireless  service facilities by any State or local government or instrumentality thereof‐‐ `(I) shall  not unreasonably discriminate among providers of functionally equivalent services; and     `(II) shall not prohibit or have the effect of prohibiting the provision of personal wireless  services.    `(ii) A State or local government or instrumentality thereof shall act on any request for  authorization to place, construct, or modify personal wireless service facilities within a  reasonable period of time after the request is duly filed with such government or  instrumentality, taking into account the nature and scope of such request.    `(iii) Any decision by a State or local government or instrumentality thereof to deny a  request to place, construct, or modify personal wireless service facilities shall be in  writing and supported by substantial evidence contained in a written record.     `(iv) No State or local government or instrumentality thereof may regulate the  placement, construction, and modification of personal wireless service facilities on the  basis of the environmental effects of radio frequency emissions to the extent that such  facilities comply with the Commission's regulations concerning such emissions.    Attachment 1, Page 27 of 33    `(v) Any person adversely affected by any final action or failure to act by a State or local  government or any instrumentality thereof that is inconsistent with this subparagraph  may, within 30 days after such action or failure to act, commence an action in any court  of competent jurisdiction. The court shall hear and decide such action on an expedited  basis. Any person adversely affected by an act or failure to act by a State or local  government or any instrumentality thereof that is inconsistent with clause (iv) may  petition the Commission for relief.”1    Finding #18. SDC Section 4.3‐145 (A), the proposed amendments were written to conform to the  Telecommunication Act of 1996 and to provide a uniform and comprehensive set of  standards and review procedures for the placement, operation, alteration and removal  of WTS facilities.      Finding #19. SDC Section 4.3‐145 (F) states “The Federal Telecommunications Act of 1996 establishes  limitations on the siting standards that local government can place on WTS facilities.   Section 704 of the Act states that local siting standards shall not:     1) “unreasonably discriminate among providers of functionally equivalent services”     2)  “prohibit or have the effect of prohibiting the provision of personal wireless  services.”    All applications for WTS facilities are subject to the standards in this section to the  extent that they do not violate federal limitations on local siting standards.  Where  application of the standards found in this section constitutes a violation, the least  intrusive alternative for providing coverage shall be allowed as an exception to the  standards.”    Conclusion     The Oregon Revised Statutes (Chapter 759) regulates telecommunications utilities.  No elements of ORS  759 restrict the regulation of the location or construction of WTS facilities by local governments.  The  amendments are consistent with the applicable elements of OAR Chapter 579.    Based on the findings included above, the proposed amendments to SDC Section 4.3‐145 do not conflict  with any applicable state statutes.  It is the conclusion of staff that the proposed amendments comply  with this criterion.    In addition to applicable state statutes, the proposed amendments defer to the regulatory limitations  place on local jurisdictions with respect to siting standards found in the Federal Telecommunications Act  of 1996.                                                                      1 Sec. 704. Facilities Siting; Radio Frequency Emission Standards. (A) National Wireless Telecommunications Siting  Policy‐ Section 332(C) (47 U.S.C. 332(C)).  Attachment 1, Page 28 of 33    Criterion #3 “Applicable State‐wide Planning Goals and Administrative Rules”    Compliance with Oregon Administrative Rules    Findings    Finding #18. OAR 860 Division 60 contains those administrative rules that govern  telecommunications as regulated by the Oregon Public Utility Commission.  This division  implements ORS 579.   A search of this chapter reveals no rules that apply to the siting  of WTS facilities.  The proposed amendments to SDC Section 4.3‐145 do not conflict with  these administrative rules.    Compliance with Statewide Planning Goals    Goal 1 – Citizen Involvement.  Goal 1 calls for "the opportunity for citizens to be involved in all phases of  the planning process."    Finding #19. The proposed amendments to SDC Section 4.3‐145 were the subject of legislative public  hearings advertised in the Register Guard on Thursday, February 1, 2013.  The Planning  Commission is scheduled to consider the amendments in a public hearing on February  19, 2013.  The City Council is scheduled to hold a public hearing on April 1, 2013.       Finding #20. Although not required by this legislative action, on February 7, 2013, mailed notice was  sent to property owners with cell towers on their land and to service providers who  have located on Springfield towers.    Goal 2 – Land Use Planning. Goal 2 outlines the basic procedures of Oregon's statewide planning  program. It says that land use decisions are to be made in accordance with a comprehensive plan, and  that suitable "implementation ordinances" to put the plan's policies into effect must be adopted.      Finding #21. The Eugene‐Springfield Metropolitan Area General Plan (Metro Plan) is the  acknowledged comprehensive plan that guides land use planning in Springfield.  Various  adopted refinement plans and specific area plans provide more detailed direction for  planning under the umbrella of the Metro Plan.      Finding #22. The SDC implements the policies and direction of the Metro Plan.   The proposed  amendments to SDC Section 4.3‐145 will modify the siting standards and review process  for Wireless Telecommunication System facilities.  There is no specific mention of WTS  facilities in the Metro Plan.  While the Metro Plan does not specifically address siting  standards for WTS facilities, Communications Facilities are listed as a key urban facility  and service.  Findings #1‐#7 of this report (pg. 5) show that the proposed amendments  to SDC 4.3‐145 are consistent with the Metro Plan and its policies.    Goal 3 – Agricultural Land.  Goal 3 defines "agricultural lands." It then requires counties to inventory  such lands and to "preserve and maintain" them through farm zoning.    Finding #23. This goal does not apply within adopted, acknowledged urban growth boundaries.  The  City of Springfield does not have any agricultural zoning districts.  These amendments do  Attachment 1, Page 29 of 33    not apply outside the urban growth boundary and, because of limitations on  commercial and industrial development without full urban services, generally do not  apply outside the city limits.  All land in the City’s urban transition area carries City  zoning.  An exception to this goal was taken in 1982 when the comprehensive plan was  acknowledged.    Goal 4 – Forest Land.  This goal defines forest lands and requires counties to inventory them and adopt  policies and ordinances that will "conserve forest lands for forest uses."    Finding #24. This goal does not apply within adopted, acknowledged urban growth boundaries.  The  City of Springfield does not have any forest zoning districts.  These amendments do not  apply outside the urban growth boundary and, because of limitations on commercial  and industrial development without full urban services, generally do not apply outside  the city limits.  All land in the City’s urban transition area carries City zoning.  An  exception to this goal was taken in 1982 when the comprehensive plan was  acknowledged.    Goal 5 – Open Spaces, Scenic and Historic Areas, and Natural Resources.  Goal 5 covers more than a  dozen natural and cultural resources such as wildlife habitats and wetlands. It establishes a process for  each resource to be inventoried and evaluated.    Finding #25. The amendment to SDC Section 4.3‐145 does not repeal, replace or void existing Metro  Plan policy or Development Code regulations with respect to any identified natural  resources.  No changes to supporting ordinances or policy documents adopted to  comply with Goal 5 are affected by these amendments.       Goal 6 – Air, Water and Land Resources Quality.  This goal requires local comprehensive plans and  implementing measures to be consistent with state and federal regulations on matters such as  groundwater pollution.     Finding #26. The amendment to SDC Section 4.3‐145 does not repeal, replace or void existing Metro  Plan policy or Development Code regulations with respect to any identified air, water or  land resource issues.  No changes to supporting ordinances or policy documents  adopted to comply with Goal 6 are affected by these amendments.       Goal 7 – Areas Subject to Natural Disasters and Hazards.  Goal 7 deals with development in places  subject to natural hazards such as floods or landslides. It requires that jurisdictions apply "appropriate  safeguards" (floodplain zoning, for example) when planning for development there.    Finding #27. All sites within Springfield that are subject to these hazards (floodplain, erosion,  landslides, earthquakes, weak foundation soils) are inventoried through a variety of  sources.  The proposed amendment does not remove or exempt compliance with other  Code standards that may apply to development.       Goal 8 – Recreational Needs. This goal calls for each community to evaluate its areas and facilities for  recreation and develop plans to deal with the projected demand for them.      Attachment 1, Page 30 of 33    Finding #28. Willamalane Park and Recreation District is the entity responsible for park planning,  development and maintenance in the urban transition area as well as the city limits.   The proposed amendments to do not alter policies encouraging the provision of  recreational facilities or the incorporation of community open space in development  design.      Goal 9 – Economic Development. Goal 9 calls for diversification and improvement of the economy. It  asks communities to inventory commercial and industrial lands, project future needs for such lands, and  plan and zone enough land to meet those needs.      Finding #29. The amendment to SDC Section 4.3‐145 does not repeal, replace or void existing Metro  Plan policy or Development Code regulations with respect to any economic  development issues.  No changes to supporting ordinances or policy documents  adopted to comply with Goal 9 are affected by these amendments.       Goal 10 – Housing.  This goal specifies that each city must plan for and accommodate needed housing  types, such as multifamily and manufactured housing.     Finding #30. The amendment to SDC Section 4.3‐145 does not repeal, replace or void existing Metro  Plan policy or Development Code regulations with respect to any housing issues.  No  changes to supporting ordinances or policy documents adopted to comply with Goal 10  are affected by these amendments.       Goal 11 – Public Facilities and Services.  Goal 11 calls for efficient planning of public services such as  sewers, water, law enforcement, and fire protection.    Finding #31. OAR‐660‐011‐0005 (5) defines “Public Facilities” to include “water, sewer, and  transportation facilities, but does not include buildings, structures or equipment  incidental to the direct operation of those facilities.”  Wireless telecommunication  facilities are not listed among those public facilities that must be included in local public  facilities plans.  This goal does not apply to the proposed amendments.      Goal 12 – Transportation.  The goal aims to provide "a safe, convenient and economic transportation  system."    Finding #32. OAR 660‐012‐0060 requires evaluation of a comprehensive plan or land use regulation  amendment to determine if an amendment to the Springfield Development Code  significantly affects a transportation facility.      Finding #33. The proposed amendments do not:  change the functional classification of an existing or  planned transportation facility; change standards implementing a functional  classification system; allow types of levels of use which would result in levels of travel or  access which are inconsistent with the functional classification of a transportation  facility; or reduce the level of service of a facility below the minimum acceptable level  identified in the Metropolitan Area Transportation Plan (TransPlan).    Attachment 1, Page 31 of 33    Goal 13 – Energy Conservation.  Goal 13 declares that "land and uses developed on the land shall be  managed and controlled so as to maximize the conservation of all forms of energy, based upon sound  economic principles."    Finding #34. The amendments to SDC Section 4.3‐145 do not repeal, replace or void existing Metro  Plan policy or Development Code regulations with respect to energy conservation.  No  changes to supporting ordinances or policy documents adopted to comply with Goal 13  are affected by these amendments.       Goal 14 – Urbanization.   This goal requires cities to estimate future growth and needs for land and then  plan and zone enough land to meet those needs.      Finding #35. The amendment to SDC Section 4.3‐145 does not repeal, replace or void existing Metro  Plan policy or Development Code regulations with respect to Springfield’s inventory of  buildable lands.  No changes to supporting ordinances or policy documents adopted to  comply with Goal 14 are affected by these amendments.       Goal 15 – Willamette River Greenway.  Goal 15 sets forth procedures for administering the 300 miles of  greenway that protects the Willamette River.    Finding #36. The proposed amendment to SDC Section 4.3‐145 does not change the obligation to  comply with the City’s existing standards for development with respect to the  Willamette River Greenway.  The Greenway provisions allow development of permitted  uses in the underlying zone, provided that all other Greenway requirements are  satisfied.  The City’s adopted, acknowledged Greenway ordinance will not be changed.    Finding #37. Existing WTS standards allow for the placement of WTS facilities within the Willamette  Greenway Boundary but require measures to minimize the visual impact of such  facilities.    The proposed SDC Section 4.3‐145 (F), Table 4.3‐1 allows for the installation  of “Low visibility” and “Stealth” facilities.  WTS facilities will continue to be subject to  the standards found in the Willamette Greenway Development Overlay District.    Applications for new tower facilities require public hearing and discretionary review by  the Planning Commission.    Goals 16 through 19 – Estuarine Resources, Coastal Shorelands, Beaches and Dunes, and Ocean  Resources.  There are no coastal, ocean, estuarine, or beach and dune resources within the City’s  jurisdiction.  These goals do not apply in Springfield.    Conclusion    The proposed amendment to SDC Section 4.3‐145, based on the findings included above, are consistent  with Oregon Administrative Rules and Oregon’s Statewide Planning Goals. It is the conclusion of staff  that the proposed amendments comply with this criterion.    V. Conclusion and Recommendation of Staff    Based on its findings with respect to the criteria defined in SDC Section 5.6‐115 for approving  amendments to the Springfield Development Code, staff finds the proposed amendments to SDC  Attachment 1, Page 32 of 33    Attachment 1, Page 33 of 33    Section 4.3‐145 to be consistent with these criteria and recommend approval of the proposed  amendments.