Loading...
HomeMy WebLinkAboutOrdinance 5656 09/21/1992c• ORDINANCE NO. 5656 AN ORDINANCE ADOPTING AMENDMENTS TO THE EUGENE - SPRINGFIELD METROPOLITAN AREA PUBLIC FACILITIES PLAN, ADOPTING A SEVERABILITY CLAUSE AND DECLARING AN EMERGENCY The City Council of Springfield finds as follows: 1. The Eugene - Springfield Metropolitan Area Public Facilities Plan (PFP) is a functional refinement plan of the Metropolitan Area General Plan. 2. The City of Eugene has initiated amendments to the Eugene - Springfield Metropolitan Area Public Facilities Plan. 3. The PFP amendments are identical to the TransPlan amendments in that the PFP amendments are revisions to the PFP Street and Highway Project List and Bicycle Project List. 4. Adoption of these amendments has been recommended by the Eugene, Springfield and Lane County Planning Commissions. Notice of public hearings before the Planning Commission and City Council has been given as required by Section 14.030 of the Springfield Development Code. 5. The amendments to the PFP project lists are necessary as an implementation of the Willakenzie Area Plan. 6. The amendments are consistent with applicable Statewide Planning Goals, •and meet other criteria for approval of refinement plan amendments as required by Section 8.030 of the Springfield Development Code. NOW, THEREFORE, THE CITY OF SPRINGFIELD DOES ORDAIN AS FOLLOWS: Section 1. The findings set forth above and the findings contained in Exhibit At Aattached hereto and incorporated herein by reference are adopted. Section 2. The Public Facilities Plan Street and Highway Project List and Bicycle Project List are amended to provide for the projects listed in Exhibit B attached hereto and incorporated herein by reference. Section 3. These PFP amendments shall become effective when identical amendments Tm ve been adopted by Lane County and the City of Eugene. Section 4. If any section, subsection, sentence, clause, phrase or portion of thi s Ordinance is for any reason held invalid or unconstitutional by a court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision and such holding shall not affect the validity of the remaining portions hereof. Ordinance No. Page 1. V) Ordinance No. 5656 Page 2 • Section 5. It is hereby found and declared that matters pertaining to the adoptionoTthese amendments are matters affecting the public health, safety and welfare of the City of Springfield and that this ordinance shall, therefore, take effect immediately upon its passage by the Council and approval by the Mayor. ADOPTED by the Common Council of the City of Springfield this 21st day of September, 1992 by a vote of 5 in favor and O against. APPROVED by the_Mayor of the City of Springfield this 21st day of September 1992 ATTEST: City Recorder • REVIEWED & APPROVED AS TO FORM DATE: S gym- F� �o 1`1�1Ze OFFICE OF CITY ATTORNEY CITY OF SPRINGFIELD • Ordinance No. Page 2 I EXHIBIT Policies: WILLAKENZIE AREA PLAN - RELATED PUB! Policy 1 (III -A -4): Coordinate ne, EVALUATION AN[ sion of an adequate level of servi transportation facilities, schools Section 9.145 of the Eugene Code provide The projects proposed in the ments to refinement plans. The Eugene -S; of the projected increases in Facilities Plan (POP) is a functional ref Proposed new streets, street Area General Plan. The following is an walk and bike improvement pro to the Street and Highway Project List ai jected increases in average d Public Facilities Plan in relation to the ties, alterations in the land the area's transportation sys Section 9.145(2)(a): The plan amen: politan Area General Plan. Policy 15 (III -B -S): Encourage tr The proposed amendments are consistent w which would improve access to indi applicable policies of the Metro Plan. freight movement capabilities by i the ...(TransPlan)... Fundamental Principles: The following proposed trans{ to industrial and commercial Fundamental Principle 1 provides for a c Project r3 (Coburg Road, Cha( ning framework within which more detaile Road, Club Road to Coburg Roy PFP is a more refinement plan which prov Road to Game Farm Road) , pro. public facility planning issues and prof Underpass), project P8, (Garr #11 (Chad Drive, Coburg Road Fundamental Principle 2 provides for coc Coburg Road, Game Farm Road : jurisdictions within the larger communit Road at Delta Offramp). developed in conjunction with Lane Count of Governments, the State of Oregon Depc Regional Air Pollution Authority, and t: Policy 4 (III -E -3): Public and p these jurisdictions have a direct intere located in a manner that preserve community. and neighborhood areas and promot Fundamental Principle 3 requires urban d The following new transporta configuration within the UGB. The trans have special significance as promote compact urban growth, increased area. Project #3 (Coburg Ro zation of transit facilities, and other Club Road, Club Road to Cobu urban growth scenario. Road to Centennial), and pro Ramp) are proposed within th Fundamental Principle 6 indicates that E the Neighborhood Design Elea providers of services within the UGB. 1 symbolic "gateways" and incc implementation of street, highway, and t other landscape materials it the urbanizable portions of the UGB. scape plans within any of tr Fundamental Principle 7 indicates that ? a projected population of nearly 300,00( Policy 2 (III -J -5): Carefully cc the PFP will facilitate the constructioi niques and other methods, energy, ments to serve that portion of the popu order to minimize adverse air qua Willakenzie planning area. ty and energy actions shall be mi how one process affects the other The proposed amendments are a result of the city's effort to provide for a long -range development plan for the Willakenzie area. The amendments are based on a thorough examination of land use, transportation and public facil- ity needs to support an assumed build -out population of more than 50,000 people. As such, the amendments reflect a change in circumstances that were not anticipated in the Metro Plan. The change in circumstances is a direct result of the level of detail provided in this plan. 0 0 • EXHIBIT B DRAFT WILLAKENZIE AREA PLAN PROPOSED PUBLIC FACILITIES PLAN AMENDMENTS AS REVISED BY EUGENE CITY COUNCIL Street and Highway Projects The following list describes those projects proposed in the Draft Willakenzie Area Plan that require amendments to the Eugene- Springfield Public Facilities Plan (PFP) . A map showing proposed amendments to the PFP Street and Highway project list is included as Attachment 1 to this Exhibit. 1. Cal Young Road, Gilham Road to Willakenzie Road (Eugene) Improvement: Widen and /or remove parking between Gilham Road and Oakway Road to accommodate separate left and right -turn lanes. Upgrade the intersection at Willakenzie Road to improve traffic flow as traffic on Willakenzie Road increases. 2. Centennial Boulevard, Intersection with Kinsrow and Garden Way (Eugene) Improvement: Install signals at Kinsrow Avenue and Garden Way. 3. Coburg Road, Chad to Beltline Road (Eugene, ODOT, Lane County) Improvement: Add right turn lanes 4. Country Club Road, Club Road to Coburg Road (Eugene) Improvement: Complete 3 lane urban facility with bike lanes and side- walks from Club Road to Coburg Road. The specific design of this improvement will depend on the outcome of the Ferry Street Bridge Study. 5a. Crescent Avenue, Norkenzie Road to Coburg Road (Eugene) Improvement: Install signal at Gilham, remove on- street parking from Norkenzie Road to Coburg Road. 5b. Crescent Avenue, Coburg Road to Game Farm Road (Eugene) Improvement: Construct new minor arterial street with center turn lane, sidewalks, and bike lanes from Coburg Road to Game Farm Road. 0 6. Game Farm Road, Coburg Road to I -5 Underpass (Eugene, Lane County) Improvement: Upgrade to a 2 to 3 lane urban facility with curbs, bicy- cle lanes, and a sidewalk on the west side. 7. Garden Way, Harlow Road to Centennial Boulevard (Eugene, Lane County) Improvement: This project supplements TransPlan project # 274. Re- align south Garden Way to straighten curves and align with Lindley Lane. Between Harlow Road and Sisters View, remove parking, restripe to three lanes, and add sidewalk on west side. 8. Southwood Lane, Oakway Road to Country Club Road (Eugene, ODOT) Improvement: Upgrade to a two -to -four lane urban facility with curbs, sidewalks, and bicycle lanes. This may require additional lanes and /or two way traffic, depending on the outcome of the Ferry Street Bridge Study. 9. Bogart Lane /Satre /Bailey Lane, Bogart to Harlow Road (Eugene) is Improvement: Redesign intersection at Bogart /Satre /Bailey Lane 10. Chad Drive, Coburg Road to Old Coburg Road (Eugene) Improvement: Extend Chad to Old Coburg Road to provide alternative industrial ingress /egress. Build a two -to -three lane urban street with curbs, sidewalks, and bicycle provisions. It may be necessary to purchase or trade right -of -way to allow for a curved roadway alignment where Chad meets Old Coburg Road. 11. .County Farm Loop - west -to -east section (Eugene, Lane County) Improvement: - This improvement will accommodate the extension of a new street from Gilham Road, north of Ayres, to Coburg Road (see project it 18). Upgrade to a two or three lane urban street with curbs, sidewalks, and bicycle facilities. 12. Gilham, Northernmost New Collector to Ayres Road (Eugene, Lane County) Improvement: Upgrade to two lane urban facility with curbs, sidewalks, and bicycle lanes from proposed new collector to Ayres Road. • C� • 13. Goodpasture Lakes Loop Road (Eugene) Improvement: Construct to urban standards with 3 to 5 lanes and bicy- cle lanes. Traffic signal controls need to be evaluated for the western intersection with Goodpasture Island Road. 14. Kinsrow, Centennial Boulevard to the east (Eugene) Improvement: Upgrade to a two or three lane urban facility with curbs, sidewalks, and bicycle provisions completed. 15. Leo Harris Loop Road, Centennial Boulevard at Gate 1 to Gate 3 or 4. (Lane County) Improvement: Construct a variable two -to -four lane roadway to urban standards with a sidewalk on the north side and bicycle lanes. The facility will be located along the south edge of the Autzen Stadium parking lot. 16. Old Coburg Road, Game Farm Road to Chad Drive. (Eugene) Improvement: Upgrade to a two -or -three lane urban street with curbs, sidewalks, and bicycle provisions. An evaluation of alternative project designs shall be provided to the Lane County Board of Commissioners and Eugene City Council prior to project initiation or completion of the 1992 -95 update to TransPlan, whichever occurs first. Design approval by the Board of County Commis- sioners and the Eugene City Council shall be required prior to project initiation. 17. East -West Collector north of Ayres Road between Gilham Road and County Farm Loop. (Eugene) Improvement: Construct new east -west collector in this location. 18. East -West Collector Street, South of Gilham School (Eugene) Improvement: Propose new collector street south of Gilham School from Gilham Road to County Farm Road. During the street design process, staff shall work with the Cal Young Neighborhood Association to address safety, speed, school proximity, and park proximity issues; and to consider design alternatives that would restrict a portion of the street to transit use only. i Bicycle Projects The following list includes proposed on- street and off- street projects which are not currently acknowledged in the Eugene- Springfield Public Facilities Plan (PFP). A map showing proposed amendments to the Bicycle Route Descrip- tion project list is included as Attachment 2. 1. I -5 Pedestrian /Bike Bridge Type: Independent path Status: New 2. Q Street Channel - Centennial Loop to Garden Way Path Type: Independent path Status: New 3 4 • 5 6 7 8 9 • Country Club Road, Club Road to Coburg Road Type: Unspecified Status: New Crescent Avenue, Coburg Road to.Game Farm Road Type: Striped on- street lane Status: New Delta Highway, Ayres Road to Green Acres Road Type: Independent path Status: New Game Farm Road, Coburg Road to I -5 Underpass Type: Striped on- street lane Status: New Southwood Lane, Oakway Road to Country Club Road Type: Unspecified Status: New Chad Drive, Coburg Road to Old Coburg Road Type: Striped on- street lane Status: New County Farm Loop, West to East section Type: Striped on- street lane Status: New 10. Gilham, Northernmost New Collector to Ayres Road Type: Striped on- street lane Status: New 11. Goodpasture Lakes Loop Road, beginning to end. Type: Striped on- street lane Status: New 11 12. Kinsrow, Centennial Boulevard to the east. Type: Unspecified Status: New 13. Leo Harris Loop Road, Centennial Boulevard at Gate 1 to Gate 3 or 4. Type: Striped on- street lane Status: New 14. Old Coburg Road, Game Farm Road to Chad Drive Type: Striped on- street lane Status: New 15. East West Collector north of Ayres Road, Gilham to County Farm Loop Type: Striped on- street lane Status: New 16. East -West Collector Street south of Gilham School, Gilham Road to County Farm Road. Type: Unspecified Status: New • 17. North -South Collector Street north of Ayres Road between Gilham Road and Delta Highway. Type: Unspecified Status: New • ii T� l— URBAN GROWTH \ BOUNDARY i s; r. H b� � �fl =� T •� Proposed Improvements to Existing Roads ® Proposed New Road • (Exact alignment to be determined) 0000( Proposed Bike Facility (Exact location to be determined) City Limits -- - - - - -- Urban GrONVth Boundary 17 1.1 r 2, Q 1� C 56 H E /t` F O