HomeMy WebLinkAboutOrdinance 6289 03/13/2013ORDINANCE No. 6289
AN ORDINANCE OF THE COMMON COUNCIL OF THE CITY OF SPRINGFIELD AMENDING ARTICLE
1, TABLE 3 -A STRUCTUAL PERMIT FEES; TABLE 3 -13 ELECTRICAL PERMIT FEES; TABLE 3 -C PLUMBING
PERMIT FEES; TABLE 3 -D MECHANICAL PERMIT FEES; TABLE 34 OTHER INSPECTION AND FEES OF THE
"SPRINGFIELD BUILDING SAFETY CODE
�t ADMINISTRATIVE CODE" OF THE SPRINGFIELD DEVELOPMENT &
PUBLIC WORKS DEPARTMENT; COM41TY SERVICES DIVISION "BUILDING SAFETY CODES" AND
DECLARING AN EMERGENCY.
WHEREAS, the Building Safety Codes specifies that rates, permit fees, license fees, and other
fees and charges are adopted by Ordinance of the Common Council; and
WHEREAS, the proposed Building Safety Codes amends permit and other fees listed in Table 3 -A,
Table 3 -13, Table 3 -C, Table 3 -D, and Table 3 -F, which are increased as specified in the attached Exhibit A
of this Ordinance.
NOW THEREFORE, THE CITY OF SPRINGFIELD DOES ORDAIN AS FOLLOWS:
Section 1: Amend the building Safety Codes, Article 1; as specified in Table 3 -A Structural Permit
Fees; Table 3 -13 Electrical Permit Fees; Table 3 -C Plumbing Permit Fees; Table 3 -D Mechanical Permit
Fees; and Table 3 -F Other Inspections and Fees as allowed under Oregon Revised Statute 455.210 (3)(a)
which allows a municipality to adopt by ordinance or regulation such fees as may be necessary and
reasonable to provide for the administration and enforcement of any specialty code or codes for which
the municipality has assumed responsibility.
Section 2: In the event a particular rate, permit fee, license fee, or other fee or charge
previously adopted in the Building Safety codes or by Ordinance has been inadvertently omitted from
those designated in Article 1 incorporated herein by reference, such rate, permit fee, license fee or
other fee or charge shall be deemed to be included and incorporated into this Ordinance and adopted
here in by reference. It is the intent of this Ordinance to reestablish all such omitted fees and charges at
the amounts that they existed immediately prior to this Ordinance
Section 3: If any particular rate, permit fee, and other fee or charge should be held invalid by
operation of law or any court of competent jurisdiction or the enforcement of any fee restrained by such
court pending the final determination as to its validity, the remainder of the rates, permit fees, and
other fees and charges specified in Exhibit A of this Ordinance, the Building Safety Codes, Article 1, shall
not be affected thereby and shall remain in full force and effect.
Section 4: Future Ordinances of the Common Council may be adopted to amend, add, or delete
any rate, permit fee, license fee, or other fee or charge.
Section 5: It is hereby found and determined that matters relating to the imposition of Building
Safety Codes are matters affecting the public health, safety, and welfare and that an emergency
therefore exists, and therefore this Ordinance shall take effect on April 1, 2013.
Attachment 4 — Page 1 of 2
This Ordinance adopted by Common Council of the City of Springfield this 18th day of March, 2013 by a
vote of 6 for and 0 against.
c'z�
Mayor
Attest:
V
Amy Sowa, City Recorder
REVIEWED & APPROVED
P S � 1 TO FORM
�car —n���
DATE: ` - 73
C7r-'FICE OF CITY ATTORNEY
Attachment 4 — Page 2 of 2
Section 6: Building and Safety Fees
City of Springfield
Community Services Division
Building Safety
Fee Schedule
Effective April 1, 2013
Fees Based on City Council Action of
7/16/2001,12/2/2002,11 /1/2004
1/17/2004,1/18/2005,3 /6/2006,
7/2/2007,6/2/2008
And OR5455.210, 455.220, 455.842, and 455.844
Exhibit A - Ordinance Page 1
ORDINANCE NO. 6289
Section 6: Building and Safety Fees
The following fees shall be charged for the Building and
Section 6: Building and Safety Fees
activities of the City:
Site:.Plan Reviews y h `Y --
Reduction in fee, Resolution 10-51 �•- ._,m� -� -
Budding Permits"
(ORS 455.447).
Structural, Commercial and Mechanical Permit Fees
Table No. 3 -A
TOTALVALUE
Fee
Fee
$1.00 - $2,000
Each additional 500 sq.ft. or portion thereof
$80.00
$2,001- $25,000
for the first $2,000 in value
$80.00
$69.00
plus for each additional $1000 or fraction thereof.
$11.00
$25,001 - $50,000
for the first $25,000 in value
$317.50
$89.00
plus for each additional $1,000 or fraction thereof
$8.25
$50,001- $100,000
for the first $50,000 in value
$511.75
$225.50
plus for each additional $1,000 or fraction thereof
$5.36
$100,001 and Up
for the first $100,000 in value
$761.91
plus for each additional $1,000 or portion thereof
$4.38
In addition to the Building Permit Fee, the Plan Check Fee shall be 65% of the Building Permit fee.
For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of
1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be
collected.
To the following fees, please add 12% State Surcharge and 5% Technology Fee
No. 3 -B
Description
Fee
Residence wiring less than 1000 square feet
$147.50
Each additional 500 sq.ft. or portion thereof
$27.50
Manufactured Home or Modular Dwelling (Service or Feeder)
$69.00
Temporary Power— 200 amps or less
$69.00
Temporary Power -201 to 400 amps
$96.00
Temporary Power -401 to 600 amps
$138.50
Permanent Service or Feeder -200 amps or less
$89.00
Permanent Service or Feeder — 201 to 400 am.ps
$104.50
Permanent Service or Feeder —401 to 600 amps
$174.00
Permanent Service or Feeder -601 to 999 amps
$225.50
Permanent Service or Feeder -1000 amps or volts
$516.00
Exhibit A - Ordinance Page 2
Section 6: Building and Safety Fees
Electrical Service Reconnection with no changes to existing service size
One new /alteration /extension of circuit
Each Additional Circuit
Each Irrigation Pump
Each Electrical Sign or Outline Lighting
Each Signal Panel
Limited Energy — Residential
Limited Energy — Commercial /Multi - Family
Inspections not covered by this schedule minimum 1 hour
Re- inspection Fee
Partial Inspection
Inspections Outside Normal Business Hours
Minimum Permit Fee
Investigation Fee
Inspections For Which No Fee is Specifically Indicated
Electrical Quick Permits (sold in 10 only) No longerin Use
Building Without Permit Penalty
Electrical Plan Review
$69.00
$60.50
$6.50
$69.00
$69.00
$69.00
$35.00
$80.00
$80.00
$ 80.00
$80.00
$94.50
$80.00
$80.00
$ 80.00
$ -0
$ Permit Fee
25% of Permit Fee
To the Following Fees, Please Add 12% State Surcharge and 5% Technology Fee
Vkhamcal Permits (Residential)
Mechanical Permit Fees
Table No. 3 -D
Description
Fee
First Appliance
$80.00
HVAC
Up to 100,000 btu
$18.50
More than 100,000
$22.00
Unit Heater
$18.50
Boiler /Compressor
Up to 100,000 btu$
18.50
3 -15 Horsepower or 100,001— 500,000 btu
$32.00
Over 15 to 30 Horsepower or 500,001- 999,000 btu
$47.50
Over 30 to 50 Horsepower or 1,000,000 — 1,750,000 btu
$62.50
Over 50 Horsepower or over 1,750,001 btu
$104.50
Air Handling Unit
Up to 10,000 cfm
$12.00
10,001 cfm and over
$22.00
Evaporative Cooler /Fan
$14.50
Exhibit A - Ordinance Page 3
ORDINANCE NO. 6289
Vents
Hood and Exhaust
Vent Fan to One Duct
Appliance Vent
Gas Piping
Each Piping System 1 -4 Outlets
Each Outlet over 4
Air, Oxygen, Other Medical Specialty Piping
Each Piping System 1 -4 Outlets
Each Outlet over 4
LP Gas Tank and Piping
Miscellaneous
Domestic Incinerator
Commercial Incinerator
Wood /Pellet Stove
Heat Pump
Preliminary Inspection
Each Appliance Not Listed on this Schedule
Inspections Not Covered by this Schedule
Re- inspection Fee
Supplemental Mechanical Fee *Not In Use*
Minimum Permit Fee
Partial Inspection
Inspections Outside Normal Business Hours
Investigation Fee
Section 6: Building and Safety Fees
$14.50
$10.00
$10.00
$7.50
$4.50
$7.50
$4.50
$18.50
$22.00
$82.50
$42.00
$18.50
$ 80.00
$14.50
$80.00
$80.00
$ -0-
$80.00
$80.00
$94.50
$ 80.00
Building Without Permit Penalty $ Permit Fee
Hourly Inspection Fee for Requests Not In Permit Tables $80.00
Mechanical Plan Review Fee 25% of Permit Fee
Mechanical Quick Permits (sold in 10 only) No Longer Available $ -0-
Commercial /Industrial /Public Mechanical System including installation costs Value
To the following fees, please add 12% State Surcharge and 5% Technology Fee
For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of
1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be
collected.
Plumbing Permits -
�t i6' 4u- V - ..._
Plumbing Permit Fees
Table No. 3 -C
Fees for the construction, alteration or repair of plumbing on one and two family dwellings, shall be
calculated as described below. Fees include drain, waste and vent installation, water distribution piping,
the first 100 feet of water service.
One or two family with one bath
$262.00
Exhibit A - Ordinance Page 4
One or two family with two bath
One or two family with three bath
Each Additional Bath
Each Additional Kitchen
Single Plumbing Fixture
Sanitary Sewer:
For the first 100 feet of line
Each additional 100 feet of line or portion
Water Service:
the first 100 feet of line
Each additional 100 feet of line or portion
Storm and Rain Drain:
For the first 100 feet of line
Each additional 100 feet of line or portion
Sewage Ejector Pump
Special Waste Connection
Manufactured Home hook up on improved lot
Backflow Prevention Device
Relocated Structure
Sanitary or Storm Sewer Cap
Any trap or waste not connected to a fixture
Any plumbing installation not listed in this schedule with
sanitary waste or portable water supply
Minimum Plumbing Permit Fee
Partial Inspection fee
Re- inspection Fee
Inspections Not Covered By Schedule
Inspections Outside Normal Business Hours
Investigation Fee
Building Without Permit Penalty
Accessible Minor Plumbing Labels NO LONGER AVAILABLE
Section 6: Building and Safety Fees
$411.00
$483.00
$104.50
$104.50
$21.00
$83.50
$21.00
$83.50
$21.00
$83.50
$21.00
$21.00
$21.00
$80.00
$21.00
$ 80.00
$80.00
$21.00
$21.00
$80.00
$80.00
$80.00
$80.00
$94.50
$80.00
$ Permit Fee
$ -0-
Not Accessible Minor Plumbing Labels NO LONGER AVAILABLE $_O_
Hourly Inspection Fee for Requests Not In Permit Table $80.00
Medical Gas System Inspection Fees — Inspection fees for medical gas systems are a
combination of:Base Fee $ Value
+ Plus Each inlet or outlet
Plan Review Fee for Med Gas $80.00 /hr
but shall not exceed 30% of the total plumbing permit fee for the building or
structure under review. When plans are incomplete or substantially changed so
Exhibit A - Ordinance Page 5
ORDINANCE NO. 6289
Section 6: Building and Safety Fees
as to require additional plan review, additional plan review fees may be charged
based on the additional time required.
Plumbing Plan Review Fee 30% of Permit Fee
Residential Fire Sprinklers
0001— 2000 Square feet $80.00
2001— 3600 Square feet $128.00
3601 -7200 Square feet $192.00
7201 Square feet and greater $255.00
To the following fees, please add 12% State Surcharge and 5% Technology Fee
Additional Miscellaneous Fees __ _ . i .11
Miscellaneous Building Fees
Table No. 3 -F
Please add 12% State Surcharge (Where Applicable)
Description
Fee
Investigative Fee
$80.00
Inspection For Which No Fee is Specifically Indicated
$80.00
Moving a Building or Structure
$320.00
Demolition of a Building or Structure
$80.00
Mobile Home Accessory Structure
$Value
Prefabricated Structures
$Value
Hourly Inspection Fee for Requests Not In Permit Table
$80.00
Address Assignment, each new or change unless requested by city staff
$42.00
Temporary Occupancy Permit Approval Shall Not Exceed 30 Days Without Renewal.
Renewal
Fee is the Same Fee As Original Temporary Occupancy Permit Fee:
1 & 2 Family Dwellings
$138.50
Triplex & 4 -Plex
$273.00
Apartment Buildings $273.00 +$33 /unit
Remodels Commercial /Industrial Buildings &.Tenant Infill
$138.50
Commercial /Industrial Buildings $411.00+10% of Bldg Permit Fee
Same As Plan Review Submittal $275.00
Building Without Permit Penalty Fee $Bldg Permit
Manufactured Home Placement $437.00
Replacement Plans + copies @ $35 for first copy+ $.50 for each additional copy for
8 %" x 11" copies, minimum total fee of $20.00 $80.00 /hr
Fire & Life Safety Plan Review When Required 40% of Building Permit Fee
Additional Plan Review Due To Changes In Plans $80.00 /hr
Hazardous Technical Report with No Plan Review $80.00 /hr
Site Investigation and Posting of NSF Check
Administrative Fee for Non - Sufficient Funds Check
Administrative Fee — Non Specialty Code Permits
$80.00
$138.50
10%
Exhibit A - Ordinance Page 6
Section 6: Building and Safety Fees
Administrative Fee for Cash Deposits
Inspections Outside Normal Business Hours -1 hour minimum
Re- inspection Fee
Quick Start
Not in Use
Research Requests
Technical (15-30 minutes)
Technical (31-60 minutes)
Non - Technical (15 -30 minutes)
Non - Technical (31 -60 minutes)
Any copy fee is in addition to research fees. 30 Minutes is minimum fee
Posting Substandard Structures $80.00
Monthly Reports — Yearly "Mailing" List $70.00 /mailed
$41.00 /faxed
$303.00 /mailed
$168.00 /faxed
10%
$94.50
$ 80.00
$208.00
$27.50
$56.00
$18.50
$34.00
Weekly Issued Reports — Yearly "Mailing' List
Addressing Information —Non Agency- Government Yearly "Mailing" List
Fire Department Process /Application Fee
$70.00 /mailed
$41.00 /faxed
10% of Fire fee
Exhibit A - Ordinance Page 7
ORDINANCE NO. 6289
Section 6: Building and Safety Fees
City of Springfield
Community Services Division
Building Valuation Data
The valuation of building construction for building permit purposes shall be the actual total construction cost for the
proposed project, including all classes of work. Section 108.3 of the Oregon Structural Specialty Code (OSSC) and
the Oregon Residential Specialty Code (ORSC) require permit valuation to include the total value of the work for
which a permit is being sought, such as architectural, structural, electrical, gas, mechanical, plumbing equipment and
other permanent systems, including material and labor. The applicant for a permit shall provide an estimated permit
value at the time of application. If, in the opinion of the Building Official, the valuation is underestimated on the
application, the permit shall be denied unless the applicant can provide detailed cost estimates to meet the approval
of the Building Official. Final building permit valuation shall be set by the Building Official.
The valuation tables below are square foot default tables for certain Occupancies and Type of Construction,
provided as a courtesy for permit applicants and are to be used only as a beginning estimate of construction costs
where accurate estimates of construction costs have not been determined prior to permit application. As stated
previously, permit valuation shall be based on the actual cost of construction.
Group 20121CC
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
Al Assembly,
theaters with
Al
stage
212.00
204.85
199.65
191.24
179.60
174.56
184.86
164.20
157.69
A1.1 Assembly,
theaters without
A1.1
stage
194.08
186.93
181.72
173.31
161.68
156.64
166.93
146.29
139.78
A2 Assembly,
A2
nightclubs
166.35
161.60
157.13
150.84
141.62
137.83
145.25
128.47
123.67
A2.1 Assembly,
restaurants,
bars, banquet
A2.1
halls
165.35
160.60
155.13
149.84
139.62
136.83
144.25
126.47
122.67
A3 Assembly,
A3
churches
195.96
188.81
183.60
175.20
163.70
158.66
168.82
148.30
141.80
A3.1 Assembly,
general,
community halls,
libraries,
AM
museums
163.95
156.80
150.60
143.19
130.66
126.63
136.81
115.27
109.76
A4 Assembly,
A4
arenas
193.08
185.93
179.72
172.31
159.68
155.64
165.93
144.29
138.78
B
B Business
169.14
162.95
157.42
149.72
135.78
130.75
143.54
119.31
113.65
E
E Educational
178.16
172.02
166.90
159.29
148.37
140.44
153.73
129.09
124.71
F1 Factory and
industrial,
F1
moderate hazard
100.75
96.02
90.26
86.94
77.68
74.37
83.16
64.01
60.19
F2Factory and
industrial, low
F2
hazard
99.75
95.02
90.26
85.94
77.68
73.37
82.16
64.01
59.19
H1 High Hazard,
H1
explosives
94.40
89.68
84.92
80.59
72.52
68.22
76.82
58.86
0.00
H2,3,4 High
H2
Hazard
94.40
89.68
84.92
80.59
72.52
68.22
76.82
58.86
54.03
H2,3,4 High
H3
Hazard
94.40
89.68
84.92
80.59
72.52
68.22
76.82
58.86
54.03
Exhibit A - Ordinance Page 8
Section 6: Building and Safety Fees
Exhibit A - Ordinance Page 9
ORDINANCE-NO. 6289
H2,3,4 High
H4
Hazard
94.40
89.68
84.92
80.59
72.52
68.22
76.82
58.86
54.03
H5 HPM /
Semiconductor
H5
fab
169.14
162.95
157.42,
149.72
135.78
130.75
143.54
119.31
113.65
11 Institutional,
11
supervised
168.08
162.18
157.65
150.82
138.52
134.86
146.99
124.28
119.86
12 Institutional,
12
hospitals
287.21
281.02
275.49
267.79
252.87
0.00
261.61
236.40
0.00
12 Institutional,
12.1
nursing homes
198.55
192.37
186.83
179.13
165.20
0.00
172.95
148.74
0.00
13 Institutional,
13
restrained
192.65
186.47
180.93
173.23
160.79
154.76
167.05
144.32
136.66
14 Institutional,
14
day care facilities
168.08
162.18
157.65
150.82
138.52
134.86
146.99
124.28
119.86
M
M Mercantile
123.91
119.17
113.69
108.40
98.85
96.06
102.82
85.70
1 81.90
R1 Residential,
R1
hotels
169.51
163.62
159.09
1 152.26
140.12
136.46
148.59
125.88
121.46
R2 Residential,
R2
I multiple family
142.14
136.24
131.71
124.88
1 113.41
109.75
121.89
99.18
94.76
R3 Residential,
one -and two -
R3
family
133.78
130.13
126.82
123.67
118.74
115.78
119.75
110.94
103.92
R4 Residential,
care /assisted
R4
living
168.08
162.18
157.65
150.82
138.52
134.86
146.99
124.28
119.86
S1 Storage,
S1
moderate hazard
93.40
88.68
82.92
79.59
70.52
67.22
75.82
56.86
53.03
S2 Storage, low
S2
hazard
92.40
87.68
82.92
78.59
70.52
66.22
74.82
56.86
1 52.03
U Utility,
U
miscellaneous
71.08
67.13
62.83
59.33
53.24
49.79
56.48
41.64
39.44
Exhibit A - Ordinance Page 9