HomeMy WebLinkAboutPermit Mechanical 1989-8-15
.. RESIDFNTIAL'.
APPLICA'L ;/PERMIT
225 North 5th Street
SpringfieZd~ Oregon 97477
BuiZding Division
726-3753, " "
6g'1' . fX1JD~
'11 ~ ~,- ~1..,. -i1Z-
Job Location:
Ascesaors Map U'
Subdivision:
C>>ne~: (11 J en (i$~ '.
Address: 6X t1 f}y{)D~
\r~d .
City: 1\
Np.w
Addi Hon
Remode'L
SPRINGFIELD
~
Tax Lot n
()ggoo
Phone: 14&.,. 51 Z 4
Zip: 1]1411
Deacribe I>'orlc:
LVDDCL ~5tlr1JG
Va'Lue
GO)
f{~,6~ ~L
!.fobi'Le Home
Date of AppUcation
Contractors
. General
i Plumbing
I Hechanical
EJ,~ctrical
Rcce:.pt ,ij
JL. uti &
Utj8
V
Signed:
Date:
(J;uL
>(- /6-%'1
I
Expires
Phonp
Address
, .Lisc. 1/
Bldrs Board ReJ;:.
, S(1Perv.1:~:linfL ~lec t r ~c ia n
It is the responoibi'Lity 'of ths permit holder to see that aU inopections are made at
from' the street, and that the permit card is located at the front of the property.
~Bui!ding Divicion approved plan sha'L'L remain on the Building Sits at a'L'L times.
.
PROCSDURE FOR INSPECTION REQPEST:CALL 726-3769 (recorder) state your City designated job nwnber,
requested ar.d when you LJi'L'L be ready for inspection, Contractora or C>>ners ncme and phone nwnber.
!"'i U be made the same day, requests made after 7: 00 am LYi U be made the next :uorking day.
Required InsDections
D SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
D UNDERSLAB PLUMBING. ELECTRICAL &
. MECHANICAL: To be made before any
work is ~overed.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
D
UNDERGROUND PLUMBING. SEWER. WATER.
DRAINAGE: To be made prior to fi'L'-
.'Ling trenches.
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to inata'Llation of
1100.1' insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
.until these inspections have beer.
made and approved. .
FIREPLACE: Prior to p'Lacir.g facing
materia'Ls and before framing inspec-
tion.
O FRAMING: Must be requented after
approva'L of rough p'Lwrbing, e'Lectri-
ca'L & mechanical. An roofing
bracing & chimneys, et~. must be
;' completed. No work is to be con-
~,' cealed until thin inspection has
. be~n made and approved.
D
o
D
D
Your City Deaigr~ted Job Number Ia:
I
the proper time. that each .:.dtb-ess is readab:e !
,
job address, type of inspecticll
Requests received befere 7:00 ~
~C;;:-0?$' ~"".:)
I DEMOLITION OR !-JOVED BUILDINGS
D INS,ULATIONIVAPOR BARRIER INSPECTION:
To be made after aU insu'L.:zti::m and
". required vapor barriers are in p'Lace
. . but before any 'Lath, gypsum board or
. wal'L covering is applied, and before
'anY inau'Lation is concealed. '
DRYWALL INSPECTION: To be made
after aU drywU is in p'Lace,
but prior to any taping.
O MASONRY: Stee'L location, bond
beama, grouting or verticals in
accordance with U.B.C. Section
2415.
r\/l WOODSTOVE: After insta'L'Lation is
.16..J ccmp'Leted.
D
D CURB & APPROACH APRON: After forms
are erected but prior to pouring
P conorete.
O SIDEWA~K & DRIVEWAY: For aU con-
. crete paving within street right-
of-wc.y, to be made after aU exca-
... .. vating comp'Lete & form work & sub-
. base materia'L in place.
D
PENCE: h'hen comp'Lete -- Provide
gates or movable sections through
P.U.E.
~ Sanitcu'y S8'.Jer capped at p~opartii 'Lir:e
~ Septi~.tank pumped and fi'Lled.with gra~el
""I Fina'L - I.'hen above items are completed
~ ar.d when demolition is comp'Lete or stru:-
ture moved and premises cleaned up.
Mobile Homes
~ B'Locking and Set-up
:J Plumbing connections -- SC1Jer and water
~ Electrical Connection - B'Locking, set-up
~ and plumbing connections ~~st ce approved
before requesting electrical inspectio:'1
~ Accesso2",j Bui'Lding
I Fina'L - After p~rches, skirting, decks,
~ etc. are comp'Leted.
D
All project conditions, such as the installation of street trkes, co~'Letion of tne
required 'Landscaping, etc., must be satisfied before the BUILDINC FINAL can be requested.
D FINAL PLUMBING
o FINAL MeCHANICAL
o FINAL ELECTRICAL
o
o
o
FINAL BUILDING: 7'he Final Building Inspection must be requeated after the Final Plumbin{J
Electrical, and Mechanical Inspectiono have been made'and approved.
~ALL MANlIOLES AND C~EANOUTS nUST BE ACCESSIBLE, AD.TUST!fENT TO BE ftf.~DE AT NO COST TO CI'l'Y Page! of 2
I JOB NO.
I Zona:
Lot Sq. Ftg.
S of lot Coverage
,q of Stories
Total Height
, Topography
ITEM
I Main
SQ.FTG
Garaae
CarDOI'.t
Accessoru
I
I
Is.D.c,
TOTAL VALUE
(va~ucJ
1.5 x
Building Permit
State Surcharge
Total Charges
L-COG~
SOLAR ACCESS REQ.-
Ocoupancy G~...
WT TYPE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
Type/Const:
Bedrooms:
I Lot Faces -
I Setbacks
I P. L. /louRe Carage'
!North
lEast
'sou th
'West
. I Enerqu Sources
I lieat
I
I
Type
Access.
Water Heater
Range
Fireplace
Woodsto,,;e
-- Fees
Building V~lue & Permi't
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Crdinance, regulating the cC'1structicn
and use of buildil1{Js, and may be suspended or revoked at (:ny time upon vic-
U7tion of any provisions of said Ordinances.
~
Plan Check Fee:
Date Paid:
I Recdpt #:
\ Signed:
lITEM
I Futures
IResidential (1 bath)
I Sanitary Sewer
Water
Plumbing Pern:i t
State surcr.arge
Total Charges
ITEM
Res. Sa. fta.
New/Extend Circuits
Temporary Service
Electrical Permit
State Surcharoe
Total
ITSM
Furnace ETU' S
Exhaus t Hood
Vent Fan
Woodstove
I
Permit Issuance
Mechanical Permit
State SurcharGe
Total CharQes
-- ENCROACHMENT --
Se~~'rit!l Deposit
Storage
Maintenance
I Parmi t
Total Charaas
Curbout
Sidewalk
I Fence
I Electrical
Label
Mobile Home
IrnrA r. AMnllNT D11F.: 4
I NO.
I
,.
I
NO~ I FEE
FEE
CHARGE
CHARGE
FEE
ClIARGE
I 0 · fie
.75
115~-'6
"
/6.75
Plumbing Permit
No person shall construct, install, alter or chal1{Je any new cr e:::isting
plumbil1{J or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a pe~son may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
r
I
I ~
Electrical Permit
In1ere State UThl requires that the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall 'not be valid untit
the U7bel has been signed by the Electrical Contractor.
~
Mechanical
Permit
~
d/(~~~~
pUyYf;sGminer t . t? '-
g7S~
Uate .
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and the ~~s of the
~ State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the BuiZding Di-
vision. I further certify that o~ly contractors ar~ enp~yees who are in
compliance with ORS 701.055 will be used on this project
"
r!t(kv/~ \ Wp
Signada~ ItY- '(!Y~
?/?0r'i
Date