Loading...
HomeMy WebLinkAboutPermit Building 2001-5-22 f " Job# 00-00318-02 I Page 1 of 2 TRANS#:Ol-0005471 DATE:MAY 22 2001 AMT RECD:2 $ 757.75 2 $ 5S1.69 CHANGE: CASHIER: 004 COMMERCIAL PERMIT City Of Springfield ' Community Services Division Building Safety Job Number: 00-00318-02 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 36417 Brand S Rd Spr Assessors Map#: 18021000 Lot: Block: Addition: Tax Lot #: 00900 Subdivision: Owner: Address: McDougal Bros Investments PO Box 87 Phorie Number: 541-937-2181 City/State/Zip: Dexter, OR 97431 Value: $134,500 Scope Of Work: Communication (Cell) Tower Sprint Tower Erect 193' communication pole w/ associated equipment on slab. Orinin::ll slIhmitt::l1 .Joh #OO-OO::l1 Fl-01 h::lS hAAn rAvisAn, so nAW SAOIJAnr.A nllmhAr W::lS ::lSSinnAn Contractor Type Contractor Registration # Expiration Date ' Phone Architect New Steven M. N. Plowman 2701 NW Vaughn, Suite 764, Portland, OR 97210 . 503-274-7800 General Contr Engineer Ssb Enterprises L1c 112520 Po Box 444, Boring, OR 97009-0444 C. Dennis Lee 9440 Telstar Ave., Suite 202, EI Monte, CA 91731 3/22/03 503-665-1657 626-448-7870 Quad Area: # Of Units: Constr. Type: Water Heater: Office Use Land Use: Zoning Code: Bedrooms: Range: # Of Buildings: Occupancy Group: Heat Source: Sq. Footage: To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Footing Slab Structural Concrete Piling, Drilled Piers/Caissions Bolts installed in concrete High Strength Bolting Final Building Required Inspections I Building -After trenches are excavated. - To be made after all inslab building service equipment, cqnduit piping, and other equipment iter -In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide r - To be done during construction by State Certified Special Inspector employed by owner/contrac - To be done by a State Certified Spediallnspector. Provide inspection test reports to City Buildir - To be done during construction by a State Certified Special Inspector. Provide inspection resul - When all required inspections have been approved and the building is complete. .i Construction Types: Occupancy Groups: # Of Buildings: . # Of Bedrooms: Handicap Access? D -Area (Sq. Feet) Main: Accessory: Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building , . Underground Electrical Verify Ground Rod Rough Electrical Electrical Service Final Electrical Modular Set Up Final Modular Set Up Fee Commercial Plan Check Total Plan Check Modular Total Permits w/o Srchg Grand Total Plan Check Type Engineering-C/I/P Planning-C/I/P Job# 00-00318-02 Page 2 of 2 Required Inspections Electrical - Prior to cover. -Install ground rod at footing, and call for inspection in conjuctiori with footing and/or foundation i - Prior to cover. -Must be approved to obtain permanent power. - When all electrical work is complete, I Permits w/o Srchg - To verify method of tie-down. -After all required inspections have been approved and project is complete. # Of Stories: Current Units: Census Code: Does not apply Height (feet): Proposed Units: Total: Paid On Receipt# Plan Check OS/22/2001 0005471 Value/Quantity Fee Amount 104,500 $288.76 $288.76 Building OS/22/2001 0005471 OS/22/2001 0005471 OS/22/2001 0005471 104,500 $444.25 $31.10 $13.33 $488.68 Permits w/o Srchg OS/22/2001 0005471 30,000 $40.00 $40.00 $817.44 Checked By Date Completed, Comment Pam Ownby Mark Metzger ' 10/19/2000 10/19/2000 Site location is out of designated wetlands. Structural-C/I/P Lome Pleger 10/31/2000 By signature, I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws 'of the State of Oregon. I further state that only contractors and employees who are in compliance with ' ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that the project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times d"(r~.tru~:w.;UAd S-2Z-D} sig'ture ( Date r