Loading...
HomeMy WebLinkAboutPermit Building 1996-12-24 ~L~'1;,;rl/~'L1iL:t,I'J(.U(~"j'41 Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 961582 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 6766 BLUEBELLE CT Assessors Map #: 17023444 Lot: 4 Block: Tax Lot #: 00803 Subdivision: ANTHONY HGHT Owner: EQUITY HOUSING Address: 88248 HEATHER DRIVE Phone #: 744-5536 City/State/Zip: SPRINGFIELD, OREGON 97478 Describe Work: S.F. RESIDENCE NEW Contractor Const. Contractor # Expires Phone General: OWNER 744-5536 QUAD AREA: 4RSE # OF UNITS: 1 CONSTR. TYPE: VN SECONDARY HEAT: HP INSUL. PATH: P1 OFFICE USE -- LAND USE: 1111 ZONING CODE: LDR # OF BDRMS: 3' WATER HEATER: E SQ FOOTAGE: 2124 # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: FE RANGE: E To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS --- SITE- To be made after excavation but prior to setting forms.. FOOTING ~ After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDERFLOOR PLUMBING - Prior to'insulation or decking. UNDERFLOOR MECHANICAL - Prior to insulation or decking. POST AND BEAM - Prior to floor insulation or decking. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. STORM SEWER LINE - Prior to filling trench. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. SHEAR WALL NAILING - Before covering sheathing with finish materials. FRAMING - Prior to cover. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. CURB CUT - After forms are erected but prior to placement of concrete. SIDEWALK - After excavation is complete, forms and sub-base material in place. PRE BACKFILL: To verify site is clean of debris prior to final grading and backfill. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all. electrical work is complete. FINAL PLUMBING - When all plumbing work is complete; FINAL BUILDING. - When all required inspections have been approved and the building is complete. SPRINGFIELD ~- Job Number: 961582 Page 2 Lot Faces: S Topography: 18.42 Solar Approved: Y Lot Sq. Ft.: 6450 Total Height: 9 Lot Type: INTERIOR Setbacks S W E 35 5 Lot Coverage: 18.3 % Setbk From NPL: 38 N House Item Main Garage Total Value BUILDING PERMIT --- Square' Feet x 1552 572 $/Square Feet 64.66 16.27 Value 100,352.00 9,306.00 109,658.00 Building Permit Fee Surcharge/Admin 455.50 36.45 TOTAL FEE (A) 491. 95 --- SYSTEMS DEVELOPMENT CHARGE (SDC) --- (B) 2,225.03 Systems Development Charge is due on all undeveloped properties within the City limits. and the Citys Urban Growth Boundry which are being improved. PLUMBING PERMIT --- Item Residential Bath(s) 2 Fee 160.00 Plumbing Permit Surcharge/Admin 160.00 12.80 TOTAL CHARGE (C) 172.80 --- MECHANICAL PERMIT --- Furnace Exhaust Hood Vent Fan Dryer Vent 3 12.00 4.50 9.00 3.00 Mechanical Permit Issuance Surcharge/Admin 28.50 10.00 2.29 TOTAL PERMIT (D) 40.79 --- MISCELLANEOUS PERMITS --- Surcharge/Admin Sidewalk Curb Cut WILLAMALANE SDC ELECTRICAL TEMP. 0.00 15.10 14.50 l,OOO.OO 43.20 TOTAL MISCELLANEOUS PERMITS (E) 1,072.80 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) 4,003.37 SPR'NCFOELD ~ _ ..'" .~.- _ · '1l1r(Jl(IJ.l/.::1I.....JN:lIr.Jj'1I ~~ . Job Number: 961582 Page 3 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: Received By: Plans Reviewed By: DON Building Site Reviewed 296.08 Date Paid: 11/22/96 Receipt Number: 23883 MOORE Date: 12/19/96 By: LISA HOPPER --- ADDITIONAL COMMENTS PATH Ii SEPARATE ELECTRICAL PERMIT IS REQUIRED DRIVEWAY REQUIRED TO BE PAVED 1 STREET TREES REQUIRED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans Wi1~ :::; ~ =~: times during construction - J?- _ Z 4 :-'6 s 'fr:JK - - -- ~ nate --- VALIDATION Date Paid: 24/~Y I? -""2 Y' ..~&. l/ t>~3 . ~ '-:;' d - - , -/7~ . Receipt Number: Amount Received: Received By: \.. CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (RESIDENTIAL) Name or Company: EQUITY HOUSING Location: 6766 BLUEBELLE CT Developement Type: R Building Size: . Job No.: 961582 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft" 2566 X 0.216 Per Sq Ft 2. SANITARY SEWER -CITY Number Of PFUs 18 X 44.75 Per PFU (see Page 2). 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1 . 01.0 X X Cost Per Trip 451.26 $455.77 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 18 Per PFU + 20.690 + MWMC Admin Fee 10.00 X X . MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL '- (Add Items I, 2, 3~& 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0'.50 TOTAL SDC Reviewed By: DENNIS ERNST Date: 12/11/96 Page 1 Sq Ft $554.26 $805.50 $455.77 $382.42 $78.87 .$303.55 $2,119.08 $105.95 $2,225.03 SPR'NGF'ELD ~ ~. , .~ .. · ... 1iliJINit~/:;~'..]fl:Ci1tj'~~ .~ ." .'1 '. , . Job Number: 961582 'Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Number of New Fixture Unit Equivalent Fixture Units Bathtub Drinking Fountain Floor Drain Interceptors .'For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or ,More Receptor For Refrigerator/Water Station/Etc Recepto~ for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet,'Public Installation Water Closet, Private ,Miscellaneous 2 o o o o 1 o o o o o 1 o 2 o 2 o 2 1 2 3 6 2 6 1 3 2 4 o o o '0 2 o o o o o 2 o 2 o 8 o 2 2 1 6 4 TOTAL FIXTURE UNITS 18 CREDIT CALCULATION TABLE: Based on assessed value~ If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: 1969 Credit For Parcel Or Land Only If Applicable: 22,730 X 3.47 78.87 Improvement (if after annexation date) : o X 3.47 0.00 CREDIT TOTAL = $78.87 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)