HomeMy WebLinkAboutPermit Building 1991-11-12
RESIDENTIAL
PERMIT APPLICATION
Inspections: 726-3769
Office: 726-3759 .
LOT
ELECTRICAL:
-:
QUAD AREA:
4Q~
~<?y -\"' !-1\
~\
~
# OF BLDGS:
OCCY GROUP:
# OF STORIES:
WATER HEATER'
SPRINGFIELD
ADDITION
DEMOLISH
OTH ER
JOB NUMBER
Cf( ~)/ Co
225 Fifth Street
Springfield, Oregon 97477 '
ZIP~ Lj
\
CONST.
yONTRACTOR #
lO~~
-' OFFICE USE -
\ \ \ \
# OF UNITS: \
CONSTR. TYPE: V N
HEAT SOURCE: -.-f G
G
LAND USE:'
RANGF'
\ 9JblCt
PHONE
FLOOD PLAIN:
ZONING CODE: I .f) \C-J .
# OF BDRMS: ~ / )
. SECONDARY HEAT .~~
SQUARE F,OOTAGE: (- -9
To request an inspection, you must call 726-3769. This is a 24 hour recording. All inspections requested before 7:00 a.m, will be
made the same working day, inspections requested after 7:00 a.m. will be made the following work day.
rn Temporary Electric
D Site Inspection - To be made
after excavation, but prior to
setting forms. .
D
Underslab Plumbing/Electrical/
Mech.anicaf .:.... Prior to cover.
~ Footing - After trenches are
excavated. .
D Masonry - Steel location, bond
. beams, grouting.
IVl Foundation - After forms are
I,.L.J erected but prior to concrete
placement.
[ZI Underground Plumbing - Prior
to filling trench.
[Z] Underfloor Plumbing/Mechanical
: .,..... Prior to i nsu lation or decki ng.
[L]
Post and Beam - Prior to floor
insulation or decking.
[Z] Floor Insulation - Prior to
, decking.
[2] Sanitary Sewer - Prior to filling
trench.
G Storm Sewer - Prior to filling
trench. '
I:\7l Water Line - Prior to filling
L"LJ trench.
[Z] Rough Plumbing - Prior to
cover.
REQUIRED INSPECTIONS
IYl Rough !",echanical - Prior to
l"LlJ cover. '
r\7I Rough Electrical - Prior to
t.pJ cover.
Ii7l Electrical Service - Must be
L,LLJ approved to obtain permanent
electrical power.
D F.ireplace :...- Prior to facing
materials and framing, Insp.
[LI Framing - Prior to c~ver.
I7l Wall/Ceiling Insulation - Prior to.
W cover.
~ Drywall - Prior to taping.
D' Wood Stove - After i~stall~tion:'
D Insert""": After fireplace approval
and installation of unit.
Ii7l Curbcut & Approach - After
.LA-J forms are erected but prior to
placement of concrete.
~ Sidewalk & Driveway - After
~ excavation is complete, forms
and sub-base material in place,
D Fence - When completed.
. .,
rvl Street Trees -When all required
IjLLJ trees are planted. . .
I )II Final Plumbing - When all
plumbing work is complete.
F)(\ Final Electrical ~ When all
L,L::J electrical, work is complete,
~~
Final Mechanical - When all
mechanical work is complete.
~
Final Building - When all
required inspections have been
approved and building is
completed.
D Other
MOBILE HOME INSPECTIONS
D Blocking and Set-Up - When all
. blocking is complete.
D Plumbing Connections - When
home has been connected to
water and sewer.
D Electrical C~nnection - When .
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
D Final...,. After all required
i nspectioris are approved and
. .. p'orches, skirting, decks, and
venting have been installed.
Lot faces or:;' Lot Type Setbacks THE PROPOSED WORK IN THE
Lot sq. ftg. "7$" Interior I P.L. HSE GAR Accl HISTORICAL DISTRICT, OR ON
IN THE HISTORICAL REGISTER?
Lot coverage <~ X Corner /~2 If yes, this application must be signed
S-~60 Is '2.~ and approved by the Historical
Topography Panhandle Iw Coordinator prior to permit issuance.
Total height j~ I Cul-de-sac lit>
IE ~ APPROVED:
BUILDING PERMIT
~~.~ x3ctib ~;\Cb
4~q. \4.\Ulol~
ITEM
Main
Garage
Carport
Total Value
Building Permit Fee
State Surcharge
Total Fee
(A)
PLUMBING PERMIT
ITEM
FEE
Fixtu res
Residential Bath(s) NO :2
Sanitary Sewer FT.
Water FT.
Storm Sewer FT.
Mobile Home
/tb??,~
Plumbing Permit
/~o~~
g~ c:oc>
Lb8. -=>
State Su rcharge
Total Charge
(C)
MECHANICAL PERMIT
----.6. -c>
0/. Se:>
? iPr?
Furnace
Exhaust Hood
Vent Fan
NO
~
Wood Stove/lnsert/Fireplace Unit
Dryer Vent
"3'.. ~
Mechanical Permit
':2 '2 - :>~
/~, C#C>
: - .t, ~ )1 '$
--."/1-:::::>
~-r'f ../
Issuance
State Surcharge
Total Permit
(D)
MISCELLANEOUS PERMITS
Mobile Home
State Issuance
State Su rcharge
Sidewalk
Ib L/' ft
~ c.j. .~.!>
/'1. :20
Curbcut "7 a ft
Demolition
State Su rcharge
Total Miscellaneous Permits (E)
TOTAL AMOUNT DUE (excluding electrical) --::<::;-/2. L(7
(A, B, C, D, and E Combined)
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any' prov~ns of said ordinances.
Plan Check Fee: r\)()' / .8..~
Date Paid: ~~5 . q T
Receipt Numbe(ci~
Received By: _. ./
. r ..
d~~~-~7
p(~ Reviewed By ,
g-/6-<7/
Date
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ADDITIONAL COMMENTS
~l)\~JiQ ~
A~ T (9\~Qcl VbS)~~
8) ()()(j.
~(\ft(y\. ~to~! lctlo')
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I further certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are in compliance with ORS 701.055 will be'used on this
project.
I further agree to ensure that all required inspections are
requested at the proper time, that each address is readable
from the street, that the permit card is located at the front
of the property, and the approved set of plans will remain
on the site at all times nng CO.rul.tr"r..ti~
Slgoatu," l-vl (j ~
///iL/7/
( r
Date
VALIDATION:
RECEIPT NUMBER
~~C(5 3
J/~/2 -7/
Z{O 7~. '7 4-
~
DATE PAID
AMOUNT RECEIVED
RECEIVED BY
I
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE:itq \09 \ b
';"' ~ .WORKSHEET ",
NAME OR COMPANY: C;'Eotz.G"E c.o~ WAY
L OCA TI ON : lO f?"'l. 'e::L.U-E:. ~t:: LLE:. W A<.(
DEVELOPMENT TYPE: L-Oe.
l, o"27:,S~Y - 00€)CC>
. BUILDING SIZE:
1. STORM DRAINAGE
IMPERVIOUS SQ. ~T. "Z<2>-, ( X SO.186 PER SQ. FT. S S?t..t6~
. (See Reverse For Runoff Coefficients If Actual Imperv. Area Is Unknown) .
LOT SIZE
SQ. Ft.
.2.. SANlTARY SEWER-CITY
NO. OF PFU'S l~ X $38.55 PER PFU
(See Reverse To Determine Total PFU'S)
<10
S .0Cf~-
3. TRANSPORTATION
NO OF UNITS X TRIP RATE X COST PER TRIP
X I.o-O? X $388.61
X X $388.61
X . - X; $388.61. .
(See Attachment C ToDetermin~ Trip Rates)
-- -. __H_"" .-.' . '.'--., -_.. -.- SUBTOTAL (ADD ITEMS 1 2
h... h._........_.. ._'..0... Oh. ..._..... . __." .. ..... '.. .' , ,
S ~qo ~ .
$
$
& 3) S \b'S~
4.' ADMINISTRATIVE' FEES' -..
BASE CHARGE (SUBTOTAL ABOVE) X .05
s f>o ~
TOTAL-CITY SDC $ tb"q~.2
5. CREDITS
IF DEVELOPMENT IS PROFESSIONAL OFFICES OR INDUSTRIAL:
TOTAL-CITY SDC X (5~%) = ADJUSTED CITY SDC $ f...J /4
6. SANITARY SEWER-MWMC
NO. OF PFU'S
lej
t;;"
x $13.25 PER PFU + S10 MWMC ADMIN. FEE $.-z.tf~-
(Use PFU Total From Item 2 Above)
HWMCCREDIT IF APPLICABLE (SEE REVERSE)
1.--<0
s ~2. f -
22-
TOTAL-HWMC SDC $ -Z Z 7 -
TOTAL SDC S \92..6 ~'t
1<.~~jJ.'.k '( Icthl
. ~ O' Kip'Burdick..
. SOC Coordinator
FIXTIJRE UNIT CALCULAl\~ON TABLE: Number of New Fixtu~es Y' ''"lit Equivalent = Fixtur~ Units (NOTE:
For remodels, calculate only the NET''' "'\fJitional fixtures) __ .
NUMBER OF UNIT' FIXTURE
FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS
Bathtub..................................................................... .
Drinking Fountain:. .... ......;..........:............ ..... ..:. ........
Floor Drain..................... .............. ............................. .
Interceptors For Grease/Oil/Solids/Etc.................
Interceptors For Sand/Auto Wash/Etc..................
Laundry Tub /Clotheswasher................. .....:. ......:....
Clotheswasher - 3 Or More....................................~
Mobile Home Park Trap (1 Per Trailer).................;
Receptor For Refrigerator /Water Station/Etc........
Receptor For Commercial Sink/Dishwasher /Etc..
Shower, Single StalL.......................... ........... .........
Shower, Gang........................................... ...... .........
Sink, Bar, Commercial.... ........,...... .... .... ..................
Urinal, StalljWaIL................:......... ..........................
Wash Basin/Lavatory, Single........................~..:......
Water Closet. Public Installation....:.................,......
Water Closet, Private....... ........ ........... ......... ............
Miscellaneous:
-~
2
1
2
.3
6
2
6
6
1
3
2
1/Head
2
2
1
6
4
"2.
-z..
TOTAL FIXTURE UNITS
Lf
7-'
"2,
'L
-----B
(€,
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occurred affer a~nexation date in table, .
. calculate credits separates.
Year
.A.nnexed
Rate per $1,000
Assessed Value
Year
Annexed
~ .- - - _..:.- - : .-, .. -
. - _. -'.-
'- - - -- -- -
S:2.Cc
".-.- -
. ---
- -"-'-
1980
lS3i
19t:2
19-83.
2.64
2.53
2.41
2.19
2.04
1986
1987
1988
1989
1990
1904
Rate per $1,000'
Assessed Value
S1.~;:.
1.35
1.15
0.92
0.59
0.23
Credit for Parcel or Land Only If Applicable
'2. .,,~ X $. ~.o
(Rate X AsseSsed Value)
X '$
(Rate X Assessed Value)
CREDIT TOTAL
?- I ."2..- <;'
Improvement (if after annexation date)
= $
Z/,)..~
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
Residential. ......... ............... ...:'...... .... ........ ....... C.~
Commercial............................................ .:...... .0.9
,I nd ustrial... ........ ................ .... ........... ........... ...... 0.45
Governmental. .......:......................................... _ 0.5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT