HomeMy WebLinkAboutPermit Building 2004-4-14 (2)
-~~'J,~.:"::i:I,' ".-, , -,i,
'~PII
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-00149
ISSUED: 04/14/2004
APPLIED: 02/05/2004
EXPIRES: 10/14/2004
VALUE: $ 1,284,564.50
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 633 SHELLEY ST
ASSESSOR'S PARCEL NO.: 1703271008401
Springfield TYPE OF WORK: Office
TYPE OF USE:
Addition
Commercial
PROJECT DESCRIPTION: Addition of office and storage buildings.
Owner: KEIZER RUSSELL J & LINDA P
Address: 90016 MANION DR W ARRENTON OR 97146
Contractor Type
General
Electrical
Engineer
Mechanical
Plumbing
I CONTRALIURINFORMATION I
Contractor License
ERIC GAMBEE CONSTRUCTION INC 105085
P B ELECTRIC INC 85896
RICH SILKETT-BENCHMARK ENGINEERIl'
JET HEATING INC 3944
CHRIS ALAN BAIRD 147008
Expiration Date
03/22/2006
01127/2006
05/31/2005
02/22/2005
Phone
503-638-0170
503-786-4499
503-659-9371
503-363-2334
503-538-9911
I BUILDING INFORMATION.
~v' ~
# of Units: ,\'X~'Of;S~~ies: 2 Lot Size:
Primary Occupancy Group: B &, ~ ~~eig'ti(of Structure 22.00 Sq Ft 1st Floor: 37,450
Secondary Occupancy Group: R-3~~ 'X<<-~,~~~ of Heat: Electric ,uSq Ft 2nd Floor:
Primary Construction Type ~c.- ~S S)~Water Type: Elect2~O..). ~$1 I\t Basement:
Secondary Construction Type: S~"?-\; ~~ '\. i>~ Range Type: EI~~tri~ '0 ~q~(t, Garage/Carport
# of Bedrooms: ~~. # '0~tf.) ~ Energy Path: ,0dP~!~q:\0 ~~tP(Qther: 1,800
~'\~ <l<<-~ /}v..,~ \:J\(:.., ''l..\\)\>' \'l).~ (l) 0 ~ ~ ~ ~11i-8'~~us Surface Area: ;8,852.00
""~ r '\ ",\l.- ...(\ ..v{'oj' ~~ .,0 _~ _" _oN _
'\'<';'\~\)~0\\J~~ '\. I DEVELOPMENT I~E@~ilQN :I~ '"' 0\ ~'~0~~~~O'
SETBACKS ~ ,r;S~~",'O\;j O~o >...O'l ~'" ~~.:J ,;..,0~ ~0 \.~'O~" REQUIRED PARKING
\J ':-\ ~~ 'l).v 0' (,) ~ cP'( 0 ~ ~"~ 1>"
Frontyard Setback: ,'-'S;'--> OV<<;I'-eY\D~f:'~~ ~(,)~\'" ~,o\.0~~~. f)r:-bz Total:
Side 1 Setback: #~p.e~~t~e~~'B(j~' O'O\.~ :\'~ 0'" n.,({)" Handicapped:
Side 2 Setback: PaY~~e gq' ~'l).'-\ ~0 '!o.00) 0(:\" Compact:
~ i\''' <A OJ } 'I.' cJli 0 9,
Rearyard Setback: % of.L{1\eOv.'~'ag~,0 ~0 oJ' l\'
Solar Setbacks: ~ ~Oj(,)' ~,,,,OJ :\\0' ,,0"
N _I}>> ,_0 _'
- .....l\.....
I PUBLIC IMPRO~~NTS .
Fully Improved
Yes
Street Improvements:
Sidewalk Type:
Curbside 5'
Curb and Gutter
Storm Sewer Available:
Special Instruction:
,DownspoutslDrains:
Notes:
Pal!e 1 of 4
-Wi
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-00149
ISSUED: 04/14/2004
APPLIED: 02/05/2004
EXPIRES: 10/14/2004
VALUE: $ 1,284,564.50
-.
.
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
I Valuation Descriotion I
Description
Dwellinl!:s
Offices
Pavine
Warehouses
Warehouses
Tvpe of Construction
V Wood Frame
VN
Use Bid Amount
II or V N
II or V N
$ Per Sq Ft
or multiplier
$92.40
$68.10
$1.00
$27.50
$27.50
Square Footage
or Bid Amount
1,575.00
225.00
44,337.00
1,800.00
37,450.00
Value
$145,530.00
$15,322.50
$44,337.00
$49,500.00
$1,029,875.00
$1,284,564.50
Date Calculated
02/05/2004
02/05/2004
03/29/2004
04/08/2004
02/05/2004
Total Value of Project
~
Fee Description Amount Paid Date Paid Receipt Number
Plan Review Comm/Ind/Public $2,672.41 2/5/04 2200400000000000098
Plan Review Fire & Life Safety $136.24 2/5/04 2200400000000000098
-Mechanical Issuance Fee- $10.00 4/14/04 2200400000000000363
+ 10% Administrative Fee $531.63 4/14/04 2200400000000000363
+ 7% State Surcharge $348.24 4/14/04 2200400000000000363
Building Permit $4,273.90 4/14/04 2200400000000000363
Dryer Vent $6.00 4/14/04 2200400000000000363
Exhaust Hoods $9.00 4/14/04 2200400000000000363
Fixture $266.00 4/14/04 2200400000000000363
Furnace - up to 100,000 btu $12.00 4/14/04 2200400000000000363
Heat Pump $12.00 4/14/04 2200400000000000363
Paving $341.40 4/14/04 2200400000000000363
Plan Review CommlInd/Public $198.58 4/14/04 2200400000000000363
Plan Review Fire & Life Safety $1,630.52 4/14/04 2200400000000000363
Planning Final Occy Inspection $143.00 4/14/04 2200400000000000363
Sanitary Sewer - Improvement $68.84 4/14/04 2200400000000000363
Sanitary Sewer - Reimbursement $90.56 4/14/04 2200400000000000363
SDC MWMC Administration $10.00 4/14/04 2200400000000000363
SDC MWMC Improvement $1,139.09 4/14/04 2200400000000000363
SDC MWMC Reimbursement $1,672.96 4/14/04 2200400000000000363
SDC Sanitary/Storm Admin $962.20 4/14/04 2200400000000000363
SDC Transpo Admin $383.65 4/14/04 2200400000000000363
SDC Transpo Improvement $5,599.30 4/14/04 2200400000000000363
SDC Transpo Reimbursement $1,269.25 4/14/04 2200400000000000363
Storm Drainage Impervious Area $17,067.08 4/14/04 2200400000000000363
Storm Sewer - 1st 50 Feet $45.00 4/14/04 2200400000000000363
Storm Sewer Each Addtll00' $294.00 4/14/04 2200400000000000363
Vent Fan $12.00 4/14/04 2200400000000000363
Water Line - 1st 50 Feet $45.00 4/14/04 2200400000000000363
Total Amount Paid $39,249.85
Pal!:e 2 of 4
.
. CITY OF SPRINGFIELD -
Building/Combination Permit
PERMIT NO: COM2004-00149
ISSUED: 04/14/2004
APPLIED: 02/05/2004
EXPIRES: 10/14/2004
VALUE: $ 1,284,564.50
"
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
I Plan Reviews I
Fire Department Review 02/05/2004 03/05/2004 OK GRG See attached document dated 3-5-04,
Initial Review 02/05/2004 02/05/2004 APP RJB
Plan nine: Review 02105/2004 04/09/2004 APP DW Waiting for Site Plan Review
(DRC2004-00004) Decision to be
issued, Final Site Plan submittal and
Development Agreement to be
signed. An LDAP will also be
required. Denise Waiters is planner.
Public Works Review 02/05/2004 04/01/2004 APP SB
Structural Review 03/11/2004 03/11/2004 10 TCM Talked with Terry Wellner and
faxed him correction list.
Structural Review 03/25/2004 03/25/2004 10 TCM Received amended site plan and
foundation plan for residence.
Structural Review 03/29/2004 03/29/2004 APP TCM Still need bid amount for paving,
talked with Terry on 3-29. Revised
structural and final site plans where
submitted. Site plan approval
subject Pearson's approval.
Structural Review 04/08/2004 04/08/2004 APP JMP Received fax from Terry Wellner
with truss for office/residence, and
agreement with Eric Gambee.
Structural Review 02/05/2004 02/06/2004 WE JMP Called Terry Wellner and asked for
a breakout by the Contractor
between buildings and site work.
Also asked for the truss engineering
"by others" that is missing.
4/5/2004 Called Terry and reminded
him that I still need these requested
items.
Structural Review 02/25/2004 02/25/2004 10 TCM Talked with Rich Silkett project
engr. and faxed him a copy of
corrections and concerns as of 2-25
SUB Review 02/05/2004 02/13/2004 APP JF
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
1 SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection.
2 SUB Final: After all required energy inspections have been requested and approved.
27 Final Mechanical: When all mechanical work is complete.
28 Electric Service: Approval required prior to utility company energizing service.
29 Final Electric: When all electrical work is complete.
30 Rough Electric: Prior to Cover
3 SUB Plumbing: Following City Rough Plumbing inspection approval and prior to cover.
Pae:e 3 of 4
_~s ~.'~4iiI M: .:
t . .1
;" ".!
~ .' -, -~-
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-00149
ISSUED: 04/14/2004
APPLIED: 02/05/2004
EXPIRES: 10/14/2004
VALUE: $ 1,284,564.50
..
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
4 SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover.
5 SUB Ceiling Grid: Interior Lighting
6 SUB Exterior Lighting
7 Site Inspection: To be made after excavation but prior to setting forms.
8 Erosion/Grading Inspection: After all erosion measures are in place.
9 Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation inspection.
10 Footing: After trenches are excavated.
11 Foundation: After forms are erected but prior to concrete placement.
12 Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete.
13 Framing Inspection: Prior to cover and after all rough in inspections have been approved.
14 Drywall: Prior to taping.
15 Firewall: Located and constructed according to plans.
16 Final Building: After aU Conditions have been completed as required on Development Agreement.
17 Final Building: After all required inspections have been requested and approved and the building is complete.
18 Rough Grading: After gravel is in place but prior to placing concrete.
19 Final Paving: After paving is complete.
20 Final Fire Department. After all requirements of the Fire Department have been met.
21 Underslab Plumbing: Prior to filling the trench and including required testing.
22 Underfloor Drain: Prior to cover or placement of concrete.
23 Rough Plumbing: Prior to cover and including required testing.
24 Storm Sewer Line: Prior to filling trench.
25 Final Plumbing: When all plumbing work is complete.
26 Rough Mechanical: Prior to Cover
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the per it card is located at the front of the property, and the approved set of plans will remain on the site at aU
times du 109 con ruction.
~/;q /01
Date
Paee 4 of 4
.
.~P'II\IGPI..IELD' ,.....
Wit, '^ .
- - I
-;. -~...._... .~- .. '
. of Springfield Official Receipt
elopment Services Department
Public Works Department
225 Fifth Street
Springfield, Oregon 97477
':,:541-726-3759 Phone
\.,
Job/Journal Number
COM2004-00 149
COM2004-00 149
COM2004-00 149
COM2004-00149
COM2004-00149
COM2004-00149
COM2004-00149
COM2004-00 149
COM2004-00 149
COM2004-00149
COM2004-00149
COM2004-00149
;~~ COM2004-00 149
COM2004-00 149
COM2004-00149
COM2004-00 149
COM2004-00 149
cOM2004-00 149
COM2004-00 149
COM2004-00 149
COM2004-00149
COM2004-00 149
COM2004-00149
COM2004-00 149
COM2004-00149
COM2004-00149
COM2004-00149
RECEIPT #:
2200400000000000363
Date: 04/14/2004
Description
Planning Final Occy Inspection
Fixture
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtl 100'
Furnace - up to 100,000 btu
Vent Fan
Exhaust Hoods
Dryer Vent
Heat Pump
-Mechanical Issuance Fee-
Water Line - 1st 50 Feet
Paving
Storm Drainage Impervious Area
Sanitary Sewer - Reimbursement
Sanitary Sewer - Improvement
SDC Transpo Reimbursement
SDC Transpo Improvement
SDC MWMC Reimbursement
SDC MWMC Improvement
SDC MWMC Administration
SDC Sanitary/Storm Admin
SDC Transpo Admin
Building Permit
Plan Review CommlIndlPublic
Plan Review Fire & Life Safety
+ 7% State Surcharge
+ 10% Administrative Fee
, Payments:
:~
Type of Payment Paid By
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
Check
h
4/1412004
RUSSELL J. KEIZER
469
In Person
Payment Total:
Jmp
Page 1 of 1
2:32:51PM
Amount Due
143.00
266.00
45.00
294.00
12.00
12.00
9.00
6.00
12.00
10.00
45.00
341.40
17,067.08
90.56
68.84
1,269.25
5,599.30
1,672.96
1,139.09
10.00
962.20
383.65
4,273.90
198,58
1,630.52
348.24
531.63
$36,441.20
Amount Paid
$36,441.20
$36,441.20
A ATTACHMENT A a
CITY OF WNGFIELD SYSTEMS DEVELOP~NT CHARGE VvWiHEET
JOURNAL OR JOB NUMBER C0M2004-00149
NAME OR COMPANY: PAD N' LOCK STORAGE
LOCATION: 633 SHELLEY ST
MAP & TAX LOT NUMBER: 17032710 08401
DEVELOPMENT TYPE: MINISTORAGE
NEW DEVELOPED AREA (S.F.):
EXISTING DEVELOPED AREA (S.F.):
TOTAL IMPERVIOUS SURFACE (S.F.):
,
,
I. STORM DRAINAGE
IMPERVIOUS SQ. FT.
58,852
2. SANITARY SEWER-CITY
A. REIMBURSEMENT COST:
NUMBER OF DFU's
B. IMPROVEMENT COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
3 TRANSPORTATION
33,567.00
2,550.00
58,852
ITE:
ITE:
LOT SIZE (S.F.):
151
151
o
x
$ 0.290 PER SF
TOTALSTORMDRAINAGESDC:! $ 17,067.0811070'
;<.;
!@}
..
.. ..
;;l ..
.. I>i >.
e ,>. ..
O~~
,_ ~l
..
]i fl
OIl'"
.. '"
.= U
4
$ 22.64 PER DFU
x
4
$ 17.21 PER DFU
x
TOTAL LOCAL WASTEWATER SDC:! $
159.40 I
BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
33.57 x 2.5 x $ 17.23 PER TRIP x 0,95 NTF 1$ 1,373.60 l
B. IMPROVEMENT COST:
33.57 x 2.5 x $ 76.01 PER TRIP x 0.95 NTF 1$ 6,059.64 l
EXISTING
A. REIMBURSEMENT COST:
-2.55 x 2.5 x $ 17.23 PER TRIP x 0.95 NTF 1$ (104.35)1
B. IMPROVEMENT COST:
-2.55 x 2.5 x $ 76,01 PER TRIP x 0.95 NTF '$ (460.34)1
! $
! $
90.56 ,1091
1
68.84 1092
":l
TOTAL TRANSPORTATION REIMBURSEMENT SDC: $ 1,269.25 1093
TOTAL TRANSPORTATION IMPROVEMENT SDC: $ 5,599.30 1094'
TOTAL TRANSPORTATION SDC:! $
6,868.55 I
4. SANITARY SEWER - MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 33.57 x $53,94 PER FEU
B. IMPROVEMENT COST:
NUMBER OF FEU's 33,57 x $36.72 PER FEU
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FEU's -2.55 x $53.94 PER FEU
B. IMPROVEMENT COST:
NUMBER OF FEU's -2.55 x $36,72 PER FEU
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
5, ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
1 $ 1,810.50 I
1 $ 1,232.74 I
1$ (137.54)1
1 $ (93.65) 1
$
TOTAL MWMC REIMBURSEMENT FEE: $
TOTAL MWMC IMPROVEMENT FEE: $
MWMC ADMINISTRATIVE FEE: $
TOTALMWMCSDC:! $ 2,822.051
SUBTOTAL (ADD ITEMS 1,2,3, & 4) ! $ 26,917.08 1
$
26,917.08 x 5% $ 1,345.85
TOTAL TRANSPORTATION ADMINISTRATION FEE: $
TOTAL SEWER ADMINISTRATION FEE: $
steve\!\, W. lSeclvtcll'"l::1lStll'"Vves 4/1/2004
colil~0~~1fW'lOCK. 633 SHELlEY.xls DATE
TOTAL SDC CHARGES
1,672.96
1,139.09
10.00
383.65 1078
962.20 1079
]
I $
28,262.93
1054
1054
1055
1056
JULY 2001
.
.
DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FIXTURE UNITS
(NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDmONAL FIXTURES)
-,
PAD N' LOCK STORAGE
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASFJOIUSOLIDSIETC.
INTERCEPTORS FOR SAND/AUTO WASH/ETC.
LAUNDRY TUB
CLOTHESWASHE~OPS~
CWTHES WASHER - 3 OR MORE (EA)
MOBILE HOME PARK TRAP (] PER TRAILER)
RECEPTOR FOR REFRIGERA TORIW A TER ST A TIONIETC.
RECEPTOR FOR COMMERCIAL SINK/ DISHWASHER/ETC.
SHOWER, SINGLE STALL
SHOWER, GANG (NUMBER OF HEADS)
SINK: COMMERCIAL, RESIDENTIAL KITCHEN
SINK: COMMERCIAL BAR
SINK: WASH BASIN/DOUBLE LAVATORY
S~: SINGLE LAVATORY/RESIDENTIALBAR
URINAL, STALUWALL
TOILET, PUBLIC INSTALLATION
TOILET, PRIVATE INSTALLATION
MISCELLANEOUS:
FIXTURES
NEW OLD
I I
, I
NUMBER OF EDD'S.
2
UNIT
EQUIVALENT
3
1
3
3
6
2
3
6
12
I
3
2
2
3
2
2
I
5
6
3
TOTAL DRAINAGE FIXTURE UNITS=
OEDU (Equivalent Dwelling Unit) is a discharge equivalent to a single family dwelling (20 DFU) set at 167 gallons per day
DRAINAGE
FIXTURE
UNITS
o
o
o
o
o
o
3
o
o
o
o
o
o
o
o
2
-I
o
o
o
o
o
o
4
CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEPARATELY
. YEAR RATE PER $1,000 YEAR RATE PER $1,000
ANNEXED ASSESSED VALUE ANNEXED ASSESSED VALUE
]979 or before $ 4.92 ]990 $ 2.06
]980 $ 4.83 1991 $ 1.64
]981 $ 4.77 ]992 $ ].45
1982 $ 4.64 1993 $ 1.31
1983 $ 4.47 1994 $ 1.13
1984 $ 4.30 1995 $ 0.97
1985 $ 4.09 1996 $ 0.82
1986 $ 3.78 1997 $ 0.63
1987 $ 3.41 1998 $ 0.41
1988 $ 2.98 1999 $ 0.22
1989 $ 2.52 2000 $ 0.04
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE X $0.00
IMPROVEMENT (IF AFTER ANNEXATION DATE) X $0.00
CREDIT TOTAL $0.00
COM2004-00149, PAD N LOCK, 633 SHEllEY.xls
JULY 2001