Loading...
HomeMy WebLinkAboutPermit Building 2004-4-14 (2) -~~'J,~.:"::i:I,' ".-, , -,i, '~PII . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2004-00149 ISSUED: 04/14/2004 APPLIED: 02/05/2004 EXPIRES: 10/14/2004 VALUE: $ 1,284,564.50 . Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line SITE ADDRESS: 633 SHELLEY ST ASSESSOR'S PARCEL NO.: 1703271008401 Springfield TYPE OF WORK: Office TYPE OF USE: Addition Commercial PROJECT DESCRIPTION: Addition of office and storage buildings. Owner: KEIZER RUSSELL J & LINDA P Address: 90016 MANION DR W ARRENTON OR 97146 Contractor Type General Electrical Engineer Mechanical Plumbing I CONTRALIURINFORMATION I Contractor License ERIC GAMBEE CONSTRUCTION INC 105085 P B ELECTRIC INC 85896 RICH SILKETT-BENCHMARK ENGINEERIl' JET HEATING INC 3944 CHRIS ALAN BAIRD 147008 Expiration Date 03/22/2006 01127/2006 05/31/2005 02/22/2005 Phone 503-638-0170 503-786-4499 503-659-9371 503-363-2334 503-538-9911 I BUILDING INFORMATION. ~v' ~ # of Units: ,\'X~'Of;S~~ies: 2 Lot Size: Primary Occupancy Group: B &, ~ ~~eig'ti(of Structure 22.00 Sq Ft 1st Floor: 37,450 Secondary Occupancy Group: R-3~~ 'X<<-~,~~~ of Heat: Electric ,uSq Ft 2nd Floor: Primary Construction Type ~c.- ~S S)~Water Type: Elect2~O..). ~$1 I\t Basement: Secondary Construction Type: S~"?-\; ~~ '\. i>~ Range Type: EI~~tri~ '0 ~q~(t, Garage/Carport # of Bedrooms: ~~. # '0~tf.) ~ Energy Path: ,0dP~!~q:\0 ~~tP(Qther: 1,800 ~'\~ <l<<-~ /}v..,~ \:J\(:.., ''l..\\)\>' \'l).~ (l) 0 ~ ~ ~ ~11i-8'~~us Surface Area: ;8,852.00 ""~ r '\ ",\l.- ...(\ ..v{'oj' ~~ .,0 _~ _" _oN _ '\'<';'\~\)~0\\J~~ '\. I DEVELOPMENT I~E@~ilQN :I~ '"' 0\ ~'~0~~~~O' SETBACKS ~ ,r;S~~",'O\;j O~o >...O'l ~'" ~~.:J ,;..,0~ ~0 \.~'O~" REQUIRED PARKING \J ':-\ ~~ 'l).v 0' (,) ~ cP'( 0 ~ ~"~ 1>" Frontyard Setback: ,'-'S;'--> OV<<;I'-eY\D~f:'~~ ~(,)~\'" ~,o\.0~~~. f)r:-bz Total: Side 1 Setback: #~p.e~~t~e~~'B(j~' O'O\.~ :\'~ 0'" n.,({)" Handicapped: Side 2 Setback: PaY~~e gq' ~'l).'-\ ~0 '!o.00) 0(:\" Compact: ~ i\''' <A OJ } 'I.' cJli 0 9, Rearyard Setback: % of.L{1\eOv.'~'ag~,0 ~0 oJ' l\' Solar Setbacks: ~ ~Oj(,)' ~,,,,OJ :\\0' ,,0" N _I}>> ,_0 _' - .....l\..... I PUBLIC IMPRO~~NTS . Fully Improved Yes Street Improvements: Sidewalk Type: Curbside 5' Curb and Gutter Storm Sewer Available: Special Instruction: ,DownspoutslDrains: Notes: Pal!e 1 of 4 -Wi . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2004-00149 ISSUED: 04/14/2004 APPLIED: 02/05/2004 EXPIRES: 10/14/2004 VALUE: $ 1,284,564.50 -. . . Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line I Valuation Descriotion I Description Dwellinl!:s Offices Pavine Warehouses Warehouses Tvpe of Construction V Wood Frame VN Use Bid Amount II or V N II or V N $ Per Sq Ft or multiplier $92.40 $68.10 $1.00 $27.50 $27.50 Square Footage or Bid Amount 1,575.00 225.00 44,337.00 1,800.00 37,450.00 Value $145,530.00 $15,322.50 $44,337.00 $49,500.00 $1,029,875.00 $1,284,564.50 Date Calculated 02/05/2004 02/05/2004 03/29/2004 04/08/2004 02/05/2004 Total Value of Project ~ Fee Description Amount Paid Date Paid Receipt Number Plan Review Comm/Ind/Public $2,672.41 2/5/04 2200400000000000098 Plan Review Fire & Life Safety $136.24 2/5/04 2200400000000000098 -Mechanical Issuance Fee- $10.00 4/14/04 2200400000000000363 + 10% Administrative Fee $531.63 4/14/04 2200400000000000363 + 7% State Surcharge $348.24 4/14/04 2200400000000000363 Building Permit $4,273.90 4/14/04 2200400000000000363 Dryer Vent $6.00 4/14/04 2200400000000000363 Exhaust Hoods $9.00 4/14/04 2200400000000000363 Fixture $266.00 4/14/04 2200400000000000363 Furnace - up to 100,000 btu $12.00 4/14/04 2200400000000000363 Heat Pump $12.00 4/14/04 2200400000000000363 Paving $341.40 4/14/04 2200400000000000363 Plan Review CommlInd/Public $198.58 4/14/04 2200400000000000363 Plan Review Fire & Life Safety $1,630.52 4/14/04 2200400000000000363 Planning Final Occy Inspection $143.00 4/14/04 2200400000000000363 Sanitary Sewer - Improvement $68.84 4/14/04 2200400000000000363 Sanitary Sewer - Reimbursement $90.56 4/14/04 2200400000000000363 SDC MWMC Administration $10.00 4/14/04 2200400000000000363 SDC MWMC Improvement $1,139.09 4/14/04 2200400000000000363 SDC MWMC Reimbursement $1,672.96 4/14/04 2200400000000000363 SDC Sanitary/Storm Admin $962.20 4/14/04 2200400000000000363 SDC Transpo Admin $383.65 4/14/04 2200400000000000363 SDC Transpo Improvement $5,599.30 4/14/04 2200400000000000363 SDC Transpo Reimbursement $1,269.25 4/14/04 2200400000000000363 Storm Drainage Impervious Area $17,067.08 4/14/04 2200400000000000363 Storm Sewer - 1st 50 Feet $45.00 4/14/04 2200400000000000363 Storm Sewer Each Addtll00' $294.00 4/14/04 2200400000000000363 Vent Fan $12.00 4/14/04 2200400000000000363 Water Line - 1st 50 Feet $45.00 4/14/04 2200400000000000363 Total Amount Paid $39,249.85 Pal!:e 2 of 4 . . CITY OF SPRINGFIELD - Building/Combination Permit PERMIT NO: COM2004-00149 ISSUED: 04/14/2004 APPLIED: 02/05/2004 EXPIRES: 10/14/2004 VALUE: $ 1,284,564.50 " Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line I Plan Reviews I Fire Department Review 02/05/2004 03/05/2004 OK GRG See attached document dated 3-5-04, Initial Review 02/05/2004 02/05/2004 APP RJB Plan nine: Review 02105/2004 04/09/2004 APP DW Waiting for Site Plan Review (DRC2004-00004) Decision to be issued, Final Site Plan submittal and Development Agreement to be signed. An LDAP will also be required. Denise Waiters is planner. Public Works Review 02/05/2004 04/01/2004 APP SB Structural Review 03/11/2004 03/11/2004 10 TCM Talked with Terry Wellner and faxed him correction list. Structural Review 03/25/2004 03/25/2004 10 TCM Received amended site plan and foundation plan for residence. Structural Review 03/29/2004 03/29/2004 APP TCM Still need bid amount for paving, talked with Terry on 3-29. Revised structural and final site plans where submitted. Site plan approval subject Pearson's approval. Structural Review 04/08/2004 04/08/2004 APP JMP Received fax from Terry Wellner with truss for office/residence, and agreement with Eric Gambee. Structural Review 02/05/2004 02/06/2004 WE JMP Called Terry Wellner and asked for a breakout by the Contractor between buildings and site work. Also asked for the truss engineering "by others" that is missing. 4/5/2004 Called Terry and reminded him that I still need these requested items. Structural Review 02/25/2004 02/25/2004 10 TCM Talked with Rich Silkett project engr. and faxed him a copy of corrections and concerns as of 2-25 SUB Review 02/05/2004 02/13/2004 APP JF To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. 1 SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection. 2 SUB Final: After all required energy inspections have been requested and approved. 27 Final Mechanical: When all mechanical work is complete. 28 Electric Service: Approval required prior to utility company energizing service. 29 Final Electric: When all electrical work is complete. 30 Rough Electric: Prior to Cover 3 SUB Plumbing: Following City Rough Plumbing inspection approval and prior to cover. Pae:e 3 of 4 _~s ~.'~4iiI M: .: t . .1 ;" ".! ~ .' -, -~- . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2004-00149 ISSUED: 04/14/2004 APPLIED: 02/05/2004 EXPIRES: 10/14/2004 VALUE: $ 1,284,564.50 .. Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line 4 SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover. 5 SUB Ceiling Grid: Interior Lighting 6 SUB Exterior Lighting 7 Site Inspection: To be made after excavation but prior to setting forms. 8 Erosion/Grading Inspection: After all erosion measures are in place. 9 Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or foundation inspection. 10 Footing: After trenches are excavated. 11 Foundation: After forms are erected but prior to concrete placement. 12 Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in place but prior to concrete. 13 Framing Inspection: Prior to cover and after all rough in inspections have been approved. 14 Drywall: Prior to taping. 15 Firewall: Located and constructed according to plans. 16 Final Building: After aU Conditions have been completed as required on Development Agreement. 17 Final Building: After all required inspections have been requested and approved and the building is complete. 18 Rough Grading: After gravel is in place but prior to placing concrete. 19 Final Paving: After paving is complete. 20 Final Fire Department. After all requirements of the Fire Department have been met. 21 Underslab Plumbing: Prior to filling the trench and including required testing. 22 Underfloor Drain: Prior to cover or placement of concrete. 23 Rough Plumbing: Prior to cover and including required testing. 24 Storm Sewer Line: Prior to filling trench. 25 Final Plumbing: When all plumbing work is complete. 26 Rough Mechanical: Prior to Cover By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the per it card is located at the front of the property, and the approved set of plans will remain on the site at aU times du 109 con ruction. ~/;q /01 Date Paee 4 of 4 . .~P'II\IGPI..IELD' ,..... Wit, '^ . - - I -;. -~...._... .~- .. ' . of Springfield Official Receipt elopment Services Department Public Works Department 225 Fifth Street Springfield, Oregon 97477 ':,:541-726-3759 Phone \., Job/Journal Number COM2004-00 149 COM2004-00 149 COM2004-00 149 COM2004-00149 COM2004-00149 COM2004-00149 COM2004-00149 COM2004-00 149 COM2004-00 149 COM2004-00149 COM2004-00149 COM2004-00149 ;~~ COM2004-00 149 COM2004-00 149 COM2004-00149 COM2004-00 149 COM2004-00 149 cOM2004-00 149 COM2004-00 149 COM2004-00 149 COM2004-00149 COM2004-00 149 COM2004-00149 COM2004-00 149 COM2004-00149 COM2004-00149 COM2004-00149 RECEIPT #: 2200400000000000363 Date: 04/14/2004 Description Planning Final Occy Inspection Fixture Storm Sewer - 1st 50 Feet Storm Sewer Each Addtl 100' Furnace - up to 100,000 btu Vent Fan Exhaust Hoods Dryer Vent Heat Pump -Mechanical Issuance Fee- Water Line - 1st 50 Feet Paving Storm Drainage Impervious Area Sanitary Sewer - Reimbursement Sanitary Sewer - Improvement SDC Transpo Reimbursement SDC Transpo Improvement SDC MWMC Reimbursement SDC MWMC Improvement SDC MWMC Administration SDC Sanitary/Storm Admin SDC Transpo Admin Building Permit Plan Review CommlIndlPublic Plan Review Fire & Life Safety + 7% State Surcharge + 10% Administrative Fee , Payments: :~ Type of Payment Paid By Item Total: Check Number Authorization Received By Batch Number Number How Received Check h 4/1412004 RUSSELL J. KEIZER 469 In Person Payment Total: Jmp Page 1 of 1 2:32:51PM Amount Due 143.00 266.00 45.00 294.00 12.00 12.00 9.00 6.00 12.00 10.00 45.00 341.40 17,067.08 90.56 68.84 1,269.25 5,599.30 1,672.96 1,139.09 10.00 962.20 383.65 4,273.90 198,58 1,630.52 348.24 531.63 $36,441.20 Amount Paid $36,441.20 $36,441.20 A ATTACHMENT A a CITY OF WNGFIELD SYSTEMS DEVELOP~NT CHARGE VvWiHEET JOURNAL OR JOB NUMBER C0M2004-00149 NAME OR COMPANY: PAD N' LOCK STORAGE LOCATION: 633 SHELLEY ST MAP & TAX LOT NUMBER: 17032710 08401 DEVELOPMENT TYPE: MINISTORAGE NEW DEVELOPED AREA (S.F.): EXISTING DEVELOPED AREA (S.F.): TOTAL IMPERVIOUS SURFACE (S.F.): , , I. STORM DRAINAGE IMPERVIOUS SQ. FT. 58,852 2. SANITARY SEWER-CITY A. REIMBURSEMENT COST: NUMBER OF DFU's B. IMPROVEMENT COST: NUMBER OF DFU's (SEE REVERSE SIDE) 3 TRANSPORTATION 33,567.00 2,550.00 58,852 ITE: ITE: LOT SIZE (S.F.): 151 151 o x $ 0.290 PER SF TOTALSTORMDRAINAGESDC:! $ 17,067.0811070' ;<.; !@} .. .. .. ;;l .. .. I>i >. e ,>. .. O~~ ,_ ~l .. ]i fl OIl'" .. '" .= U 4 $ 22.64 PER DFU x 4 $ 17.21 PER DFU x TOTAL LOCAL WASTEWATER SDC:! $ 159.40 I BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR NEW A. REIMBURSEMENT COST: 33.57 x 2.5 x $ 17.23 PER TRIP x 0,95 NTF 1$ 1,373.60 l B. IMPROVEMENT COST: 33.57 x 2.5 x $ 76.01 PER TRIP x 0.95 NTF 1$ 6,059.64 l EXISTING A. REIMBURSEMENT COST: -2.55 x 2.5 x $ 17.23 PER TRIP x 0.95 NTF 1$ (104.35)1 B. IMPROVEMENT COST: -2.55 x 2.5 x $ 76,01 PER TRIP x 0.95 NTF '$ (460.34)1 ! $ ! $ 90.56 ,1091 1 68.84 1092 ":l TOTAL TRANSPORTATION REIMBURSEMENT SDC: $ 1,269.25 1093 TOTAL TRANSPORTATION IMPROVEMENT SDC: $ 5,599.30 1094' TOTAL TRANSPORTATION SDC:! $ 6,868.55 I 4. SANITARY SEWER - MWMC NEW: A. REIMBURSEMENT COST: NUMBER OF FEU's 33.57 x $53,94 PER FEU B. IMPROVEMENT COST: NUMBER OF FEU's 33,57 x $36.72 PER FEU EXISTING: A. REIMBURSEMENT COST: NUMBER OF FEU's -2.55 x $53.94 PER FEU B. IMPROVEMENT COST: NUMBER OF FEU's -2.55 x $36,72 PER FEU MWMC CREDIT IF APPLICABLE (SEE REVERSE) 5, ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) 1 $ 1,810.50 I 1 $ 1,232.74 I 1$ (137.54)1 1 $ (93.65) 1 $ TOTAL MWMC REIMBURSEMENT FEE: $ TOTAL MWMC IMPROVEMENT FEE: $ MWMC ADMINISTRATIVE FEE: $ TOTALMWMCSDC:! $ 2,822.051 SUBTOTAL (ADD ITEMS 1,2,3, & 4) ! $ 26,917.08 1 $ 26,917.08 x 5% $ 1,345.85 TOTAL TRANSPORTATION ADMINISTRATION FEE: $ TOTAL SEWER ADMINISTRATION FEE: $ steve\!\, W. lSeclvtcll'"l::1lStll'"Vves 4/1/2004 colil~0~~1fW'lOCK. 633 SHELlEY.xls DATE TOTAL SDC CHARGES 1,672.96 1,139.09 10.00 383.65 1078 962.20 1079 ] I $ 28,262.93 1054 1054 1055 1056 JULY 2001 . . DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FIXTURE UNITS (NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDmONAL FIXTURES) -, PAD N' LOCK STORAGE FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASFJOIUSOLIDSIETC. INTERCEPTORS FOR SAND/AUTO WASH/ETC. LAUNDRY TUB CLOTHESWASHE~OPS~ CWTHES WASHER - 3 OR MORE (EA) MOBILE HOME PARK TRAP (] PER TRAILER) RECEPTOR FOR REFRIGERA TORIW A TER ST A TIONIETC. RECEPTOR FOR COMMERCIAL SINK/ DISHWASHER/ETC. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: COMMERCIAL, RESIDENTIAL KITCHEN SINK: COMMERCIAL BAR SINK: WASH BASIN/DOUBLE LAVATORY S~: SINGLE LAVATORY/RESIDENTIALBAR URINAL, STALUWALL TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: FIXTURES NEW OLD I I , I NUMBER OF EDD'S. 2 UNIT EQUIVALENT 3 1 3 3 6 2 3 6 12 I 3 2 2 3 2 2 I 5 6 3 TOTAL DRAINAGE FIXTURE UNITS= OEDU (Equivalent Dwelling Unit) is a discharge equivalent to a single family dwelling (20 DFU) set at 167 gallons per day DRAINAGE FIXTURE UNITS o o o o o o 3 o o o o o o o o 2 -I o o o o o o 4 CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEPARATELY . YEAR RATE PER $1,000 YEAR RATE PER $1,000 ANNEXED ASSESSED VALUE ANNEXED ASSESSED VALUE ]979 or before $ 4.92 ]990 $ 2.06 ]980 $ 4.83 1991 $ 1.64 ]981 $ 4.77 ]992 $ ].45 1982 $ 4.64 1993 $ 1.31 1983 $ 4.47 1994 $ 1.13 1984 $ 4.30 1995 $ 0.97 1985 $ 4.09 1996 $ 0.82 1986 $ 3.78 1997 $ 0.63 1987 $ 3.41 1998 $ 0.41 1988 $ 2.98 1999 $ 0.22 1989 $ 2.52 2000 $ 0.04 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE X $0.00 IMPROVEMENT (IF AFTER ANNEXATION DATE) X $0.00 CREDIT TOTAL $0.00 COM2004-00149, PAD N LOCK, 633 SHEllEY.xls JULY 2001