Loading...
HomeMy WebLinkAboutApplication APPLICANT 10/2/2012 r :City of Springfield SPRINGFIELD F Development Services Department 225 Fifth Street Springfield, OR 97477 r Drinking Water Protection Overlay District DevelopmentRequired Projectcomplete A licantNamed)nw&asl<. vckr✓ _ Phone: 541-68?-it s14 Com an_y 1JE+> !rfU _c�bii QSt_�?iunC� CLoie'c o Address: bdi W• ` zE ue 1 �u aE t}e 91401 A licant's Rem Phone: r- Company Fax: Address• Phone: Pro er Owners[ _ _ , Company:�Jlt tt(SL4106S LUC Fax: (Address: 89�b8 qto C1n�nt �PQ1tiU E�D�Caz �f7�"I8 ASSESSOR'S MAP NO: TAX LOT NO(S): !"k-d2 ZS-OpJO y PropertyAddress: `a4�zli� .cI Ue97,41] Size of Property: _2, . Acres Square Fee—tll Zoning: Existing Use: , Description of If you are filling in this form by hand, please attach your proposal description to this application. Proposal. Signatures: Please si n andrint your name and date in thea ro riate box on the next page. . . . - IMMLWA Associated Cases: Case No.: 1 j Z — 2 Date: Reviewed b Application Fee: /02Z, W Technical Fee: $ Posta a Fee: so TOTAL FEES: Lv ��I, p'y' PROJECT NUMBER: 6S'h3^'o.:t','d]F;Sr?'dk@n4MEkr•"c::.�'KNTSYil:'!�'.`via.1..w"�'T.1ktPn'J'.'FY-'}p'F:^.::..3%..,J'ily.?a.,6e-�G...t.:�.—L3.L:�L 'Axl.:v..fs,F113[..,S:fi.'..,"°"..b,H 'Jt.:i'A, '�t_.A.:1:. Y. . - ..Y..'-r +.?r: Date Received: OCT -2 2012 Revised 1/15/09 ddk original Submittal1 of 5 a. f` r I 0 0 Signatures The undersigned acknowledges that the information in this application is correct and accurate. Applicant: Date /0• Z Signature I Sf Print If the applicant is not t e owner, the owner hereby grants permission for the applicant to act in his/her behalf. Owner: Date: SignaP6re E� W IF-7- Print ®ate Received: OCT - 2 .2012 Original Submittal Revised 1/15/09 ddk 2 of 5 f o a Type I DWP Overlay District Narrative for QSL Print Communications Project Location: The property is located within the 1 to 5 year TOTZ of the Pierce wellhead. The project address is: QSL Print Communications 3000 Pierce Parkway Springfield OR 97477 Project Description: The proposed project is the remodel of the former FM Sheet metal Building to create an Offset and Digital Print facility. QSL Print Communications will be converting the current production facility to house Offset Printing Presses, Bindery Equipment, Mailing and Warehouse services. Specific to drinking water protection: We are reviewing all hazardous materials at our current location and removing all Dense Non-Aqueous Phase Liquids(DNAPLs)from our building. All other liquid hazardous materials will have secondary containment as indicated in the Hazardous Materials Management Plan.We are developing a Spill Response Plan. The plan will include monthly monitoring of secondary containers, auditing of spill response containers,training program for all employees on spill response and maps with locations of all spill response kits and their proper use. Applicability: The proposed project requires a DWP Overlay District application as per SDC 3.3-225,since a Site Plan Review is require for the project and the project affects the storage of hazardous material. A Site Plan Review application is being submitted concurrent with this application. Time of Travel Determination According to the current Wellhead Protection Area Map located on the City website,our location lies within the Drinking Water Protection Area's 1 to 5 year TOTZ of the Pierce wellhead. DWP Overlay District Development Submittal Requirements Checklist In accordance with Drinking Water Protection (DWP) Overlay application submittal requirements, all required information has been provided as follows: Submitted concurrently with Site Plan Review or Minimum Development Standards application,where applicable. DWP Overlay District Development Application form. The DWP Overlay District Development Application Form is included. Copy of the Deed. I Date Received: A copy of the Deed for this project is included. OCT 2 2012 Original Submittal — 0 0 Copy of Preliminary Title report. A copy of the Preliminary Title Report for this project is not required. Narrative This summary is part of the Narrative. Three (3)copies of a Plot Plan Reduced to 8.5" by 11"outlining the applicable TOTZ boundaries in relation to the property boundaries. Three copies of the Site Plan printed at the appropriate size are included. Use of hazardous materials that pose a risk to groundwater that existed on the property prior to May 15, 2000 if applicable. There is no current use of hazardous materials at the site that may have existed on the site prior to this date. Hazardous Material Inventory Statement and Material Safety Data Sheet(MSDS)for all materials entered on the statement. Hazardous material weights shall be converted to volume measurement for purpose of determining amounts. Three copies of the Hazardous Materials Inventory Statement (HMIs) prepared by.the Applicant is include with this application.This statement includes products used at the printing facility including cleaning supplies and chemicals used by the janitorial service. MSDS information for specific products listed will be provided to the City and Springfield Utility Board at their request. Use of chemicals to be monitored through the analysis of groundwater samples and monitoring schedule if groundwater monitoring is anticipated to be required. All chemicals will be stored with approved Secondary Containment. All outside storm drains will be signed and spill kits will be placed near them to prevent hazardous material spills from running into the stormwater sewer system. Any spill of hazardous material will result in an immediate clean up in accordance with the Hazardous Materials Management Plan (HMMP), a copy of which is include with this application.Therefore, any spill will not come in direct contact with the ground surface. For these reasons, it is determined that ground water monitoring should not be required. Detailed description of the activities conducted at the facility that involves storage, handling, treatment, use or production of hazardous materials in aggregate quantities greater than 500 gallons. The primary activity involving hazardous materials is commercial printing. At no time do we have 500 gallons aggregated quantity . There shall be no use of DNAPLs on site. Description of the primary and any secondary containment devices proposed and if applicable clearly identified as to whether the device will drain to the sanitary sewer or stormwater system. Primary Containment Devices: Original product containers will provide primary containment. Secondary Containment Devices:All hazardous materials will be stored in secondary containment. No primary or secondary container will drain into the sanitary sewer or stormwater system. There are no drains in the main production facility. Proposed Hazardous Material Management Plan (HMMP)developed by the Applicant for the QSL facility that indicated procedures to be followed to prevent,control,collect and dispose of any unauthorized release of hazardous material. Date Received. OCT - 21202 Original Submittal I 0 a Three copies of the HMMP developed by the Applicant for the QSL facility is included with this application. Each employee will receive training on spill response prior to the opening of the facility. Training will be documented and available for audit. New employees will have spill response training as part of their new hire orientation. Yearly review of spill response will happen on a department by department basis. Spill response kits will be located throughout the plant where spills would most likely occur.The kits will be comprised of Personal Protective Equipment(PPE), absorbent materials and a Hazmat bag to contain the clean-up supplies and products in a 5 gallon lidded bucket. An Emergency Action Plan is also maintained in each department. This plan provided proper response in the event of a hazardous materials spill(see attached with the HMMP). At no time will any chemicals in any quantity be released into the sanitary sewer unless it has been approved by the City of Springfield. Description of the procedure for inspection and maintenance of containment devices and emergency equipment. Primary and secondary containment devices are noted above. Primary containment is original container. Secondary containment will be approved containment device. Other containment devices will be drain protection mats for outside drains(inspected monthly). Spare mats will be maintained on site. All employees will be trained on location and use of mats as part of the spill response training program. All mats,spill response kits,fire extinguishers will be inspected monthly by the Safety Committee. Replacement components for all spill response supplies will be maintained onsite. Description of the plan for disposition of unused hazardous materials or hazardous material waste products over the maximum allowable amounts, including the type of transportation and proposed routes. Depart Pierce Pkwy toward 28`h Street, follow 28`h Street to Main, turn right on Main Street, follow Main Street to Franklin Blvd, turn left onto Glenwood Blvd,turn right onto E 17`h Avenue,arrive at 3100 E 17th Avenue, Eugene,Oregon 97403, DWP Overlay District Development 1-5 Year TOTZ Standards. 1. The storage, handling,treatment,use,application,or production or otherwise keeping on premises of more than 20 gallons of hazardous materials that pose a risk to groundwater in aggregate quantities not containing DNAPLs are allowed only upon compliance with containment and safety standards specified by the most recent Fire Code adopted by the City. 2, Unless exempted, all hazardous or other materials that pose a risk to groundwater shall be stored in areas with approved secondary containment in place(Springfield Fire Code 2702.1 and 2704.2.2). 3. All new use of DNAPL's are prohibited. 4. Any change in the type of use or an increase in maximum daily inventory quantity of any DNAPL is considered a new use and is prohibited. Gate Received: OCT -2 2012 Original Submlttal — i O U All hazardous materials located on the premises will have secondary containment that is in compliance with containment and safety standards specified by the current Fire Code.We will not have any DNAPLs on site. Working with the Water Quality Protection Coordinator we will screen any new products prior to purchase to make sure no DNAPLs are brought on the property. S. The following certain types of facilities or changes in chemical use and/or storage of hazardous. or other materials that pose a risk to groundwater are prohibited: a. Hazardous material product pipelines used to transport the hazardous material off of the tax lot where it is produced or used; b. Injection wells; EXCEPTION: Dry wells for roof drainage; C. Solid waste landfills and transfer stations; d. Fill materials containing hazardous materials; e. Land uses and new facilities that will use,store,treat handle,and/or produce DNAPLs. a.There will be no pipelines for transporting hazardous materials. b.There will be no injection wells., c. No landfills or transfer stations will be located on the site. d.There will be no fill material containing hazardous material in the secondary containment system. e. DNAPL's will not be used, stored,treated, handled or produced on site. 6. Requirements found in Springfield Fire Code 2704.2.2.5 for a monitoring program and monitoring methods to detect hazardous or other materials in the secondary containment system shall be met for all amounts of hazardous materials that pose a risk to groundwater unless exempted. All hazardous materials and secondary containment will be inspected on a monthly basis by the safety committee as part of our Spill Prevention& Response Plan (see attached Plan). 7. The following requirements for inspection and record keeping procedures for monthly in-house inspection and maintenance of containment and emergency equipment for all amounts of hazardous or other materials that pose a risk to groundwater shall be met unless exempted:Schedules and procedures for inspecting safety and monitoring and emergency equipment. The applicant shall develop and follow a written inspection procedure acceptable to the Director for inspecting the facility for events or practices which could lead to unauthorized discharges or hazardous materials. An inspection check sheet shall be developed to be used in conjunction with routine inspections. The check sheet shall provide for the date,time,and location of inspection; note problems and dates and times of corrective actions taken;and include the name of the inspector and the countersignature of the designated safety manager for the facility. Monthly inspections are required as part of the Spill Prevention & Response Plan (see attached Plan). The Safety Committee will conduct inspections as part of their monthly plant walk through. Routine visual inspections will occur daily during working hours by staff. These inspections will not be logged unless a spill or leak is detected. Date Received: OCT L. 2 2012 original SubMittal-- I Operations: Before QSL Print Communications begins operations the follow criteria will be met. 1. All employees will have had spill response training. 2. All Spill Response Kits and Hazardous Material Spill Clean-up instructions will be posted. 3. Drain Mats will be in place and appropriately signed. 4. Secondary Containment of hazardous materials will be provided as noted above. S. Wellhead protection sighs, meeting Springfield Utility Board standards will be posted as recommended by SUB'S wellhead protection staff. I ®ate Received: OCT =2 2012 Original Submittal I